Loading…
Loading…
1,159 results • Best match
One Time Improvement on Existing Two lane of Nagapattinam Ramanathapuram Tuticorin road NH 32 from Km 284 181 333 043 48.862Km including Construction of three row pipe culverts Construction of six row pipe culverts Rectifications of flood breach
Improvements from Km 0/0 - 15/4, Km 16/350 - 17/8 and Km 35/6 - 36/0 of NH 179A (Salem - Tiruppathur - Vaniyambadi Road) in the state of Tamil Nadu - (Job No.NH-179A -TN- 2025-26-1060)
Krishnagiri District Krishnagiri Block AGAMT - 2025-26 1.Providing CC Pavement from Chandrasekar House to Velmurugan House at Checkpost Indhira Nagar 2. Providing CC Pavement from Subramani House to NH at Checkpost Indhira Nagar in Baiyanapalli pt Pk
Maintenance and Repair work from km 212.0 to km 223.80 and km 252.0 to 257.80 of NH-948 (Length 17.60 km) (Bangalore - Coimbatore Road) in the state of Tamil Nadu under Performance Based Maintenance Contract (PBMC) 2024-25
RETENDER 15TH FINANCE COMMISSION 2025-26 - 1ST INSTALLMENT TIED GRANT EXTENTION OF PIPELINE FROM 4TH WARD CHINNALAPATTI NH-7 TO HOUSING BOARD COLONY,BALASUBRAMANIAN STREET TO KALIYAMMAN TEMPLE,16TH WARD ASHA THEATRE STREET AND 1ST WARD GOUNDAR STREE
Operation and Maintenance of Coimbatore bypass stretch of Two Lane with Paved Shoulder from Neelambur to Madukkarai Km 144.680 to Km 170.880 section of NH 544 for a length of 26.200 Km in the State of Tamil Nadu.
Salem District - Magudanchavadi Block - Strengthening and Five Year Maintenance of the Road from KM 23/0 of NH 47 to Gudalur nadar street KM 0/0-1/520 - Gudalur Panchayat in NABARD - RIDF- 2026-2027 Package No.22
Short Term Maintenance contract ordinary Repairs on selected stretches from Km. 65.00 to 110.200 of NH 38 (Old NH 234) Mangalore Villupuram Road
TURIP 2025-26 Improvement of BT Road at East to West Hyder Godown Back to NH Join - 122004R118, Malaiyammal Puram 2nd Street - 122004R110, E TO W Pillayar koil street - 122005R123, SUBRAMANIYA KOIL STREET- 122007R168 , Nandhagopalan Kovil 1st Left C
Widening from Two Lane paved shoulder to Four Lane and Strengthening including construction of Retaining wall, drain and Reconstruction of culverts at Km 7/0 - 9/0 of Varanasi-Kanyakumari road (Abandoned NH 7) (Madurai-Thirumangalam Stretch) SHU 101
Short Term Maintenance Contracts from Km 308/4 - 309/815, km 312/0 - 316/0 and km 324/4 -328/2 of NH 948 - Bangalore -Sathyamangalam -Coimbatore Road in the state of Tamil Nadu for the year 2024-25
Salem District Panamarathupatti Block 1) Potholes repair road from A.Kondalampatti Pillaiyar karattur Annamalai mill NH to Maniyanur road via Indra nagar Km 0/0-0/435. 2) Potholes repair road from A.Kondalampatti New Gandhinagar road Km 0/250 RRMS
Remedial measures to distressed Reinforced Soil (RS) Walls at Km 174/647 (ROB), Km 176/964 (VUP) and Km 266/400 (Flyover) on Madurai - Tuticorin section of NH-38 in the State of Tamil Nadu on Item Rate Basis
Short Term Maintenance contract ordinary Repairs on selected stretches from Km. 0/00 65/00 of NH 38 (Old NH 234) Mangalore Villupuram Road
Capacity control valve assembly of Air intake system for compressor Model NH-105, Check valve - Discharge system for Compressor Model NH-105, Pump lub oil for lubrication system for compressor Model NH-105, CLAMP CONNECTOR FOR COMPRESSOR MODEL ... MODEL NH -105PART ... compressor NH -105 ... COMPRESSOR NH 105PART ... compressor NH 105 ... compressor NH -105 ... MODEL NH -105 ... model NH - ... model NH 190, ... compressor NH -190, ... VIBRATION NH -190, ... COMPRESSOR NH -190 ... compressor NH 190, ... compressor NH - ... compressor NH - ... compressor NH - ... Compressor NH - ... Compressors NH 190 ... and NH 105
Short Term Maintenance Contracts from Km 0/0-1/6, Km1/6-2/6, Km 4/6-6/6, Km 11/6-12/6 of NH 381A Vellakovil - Sankagiri road in the state of Tamil Nadu for the year 2024-25
Road Restoration work in NH 181 road along Coimbatore Karur Tiruchirappalli Chidambaram Road in CBE Dist 450mm DI K7 and 200mm HDPE Pipe lines under Revamping works from IrugurPirivu to Ranganathapuram in FM VI under CWSS to CLPRA 2025 26
Improvements of MRL46-NH-234 Vilupuram T.V.Malai Road Via Neelanthangal to Vayalur Sanipoondi Road Km 2/300 - 4/325 and Km 4/925 - 6/300 with 5 years maintenance in Package No.TN24-229 Kilpennathur Block of Tiruvannamalai District under PMGSY III
Widening of service road in Mettupalayam side approach of Periyanaickenpalayam flyover including Land Acquisition from Km.31/600 to 32/000 of NH-181 (Coimbatore - Ootty - Gundlupet Road) - on EPC Basis Contract Under Annual Plan 2024-25 in the Stat
Widening Minor Bridge at km 477/6, Reconstruction of Minor bridge at km 480/2 including Reconstruction of Slab culvert at km 474/4 of NH 67 on Engineering, Procurement and Construction (EPC) Basis Contract in the State of Tamil Nadu
SRCC/BNR/LT/313/TAPSO/2025-26 Construction of new A site Retail Outlet with facilities like Sales Building Canopy Paver block driveway and other allied civil electrical works at Between Kethireddipalle and Rajapur on NH 44 LHS Towards Bengaluru Raj
Strengthening to the Road from NH 47 (near gowri theatre) to sanarpalayam road (via) pwd chennel, poolakadu H/o kuppandapalayam km 0/000 - 1/030 at Pallipalayam Block in Namakkal District With five year Maintenance Pkg.No . 13/NKL/NabardXXX 2024-2
Elimination of identified blackspot at Km 46/020-46/810 (Arasakuzhi-TN-(02)-310) and Km 84/200-84/840 (Adari-TN-(02)-112) by Permanent remedial measures of NH 532 (Cuddalore-Vridhachalam-Salem road) in the State of Tamil Nadu
Construction of road over bridge at Bethlegam area in Ambur Town at the Road Branching off from Km 68/4 of Krishnagiri Ranipet Road (NH-46) to Asanampattu at Railway Km.182/10-11 Between Ambur and Vaniyambadi Railway Stations.
Widening the existing 2 lane carriageway to 2 lane with paved shoulders from Km 0/0 to Km 33/000 of NH 544H, Strengthening from Km 18/600 to 33/000 (Eligible stretches), Widening/Reconstruction/ Construction of Minor Bridges, culverts, Construction
Salem District Panamarathupatti Block 1) Potholes repair road from Neickarapatti NH 47 to Elanthoppu Km 0/0-0/670. 2) Potholes repair road from Neickarapatti ST Road to Kodikadu Km 0/0 - 1/210 RRMS 25-26, Package No - 2
Widening the existing 2 lane carriageway to 2 lane with paved shoulders from with km 70/0-85/0 of NH 544H including Reconstruction/ construction/ widening of CD works, construction of RCC drain, bus bays in Thoppur-Mettur-Bhavani-Erode road
Rectification of Blackspots TN-03-069 (Thadakoil), Accident Spot (Kakkathoppu) and Blackspot TN-02-604 (Agaram Junction) by Construction of VUPs and Service Road in Karur to Dindigul Section of NH-44 in the State of Tamil Nadu on EPC Mode
Permanent Rectification of Black Spot TN-(02)-255 by Constructing a Vehicular Underpass of VUP (20m X 5.5m) at km.134.328 (Then Nanthiyalam Junction) in the project of Krishnagiri to Walajahpet section of NH-48 in the State of Tamil Nadu
Improvements to eliminate the Blackspot at Ganapathy Moor Market Junction TN-02-623 at Km 312/0 to Km 315/4 of NH 948 Length 3.4 Km (Bangalore Sathyamangalam Coimbatore Road) under AP-2024-25 in the State of Tamil Nadu
PART-I Parthibanur - Narikudi road to Mosukudi - P.P.yenthal road junction (via Idayathur Melakudieruppu )PART-II NH 49 TO Old NH 49 road (via) sivan kovil
ECONO CNC 26 HEAVY DUTY Roller Steady R, NH 26 Roller Follow Rest Cap 10 to 135, NH 26 Roller Steady Rest Cap 10 to 135
Naxtra plate, P355 NH Plate BOQ Title BOQ alloy plate
It is proposed to construct NRO at AYIKUDI (THANJAVUR TO TIRUVARUR NH), TIRUVARUR DISTRICT IN TRICHY RETAIL TERRITORY. In order to execute the above jobs, we are inviting competitive quotation from you for various service items to be executed. ... TIRUVARUR NH , ...
Strenthening from km 98/0 -102/0 of Cuddalore -Tirukoilur - Sankarapuram road (SH-68)
Strengthening from Km 30/4 - 36/6, 38/7 - 47/0 of Marmalong Bridge-Irumbuliyur-Vandalur-Mudichur-Oragadam-Walajabad Road SH-48 excluding junction improvement at km 32/2
Strengthening at Km 0/0-10/0and11/4-12/5 of Tirupachur-Kadambathur-Kondancherry Road (M-468)
Widening from 2L to 2LPS and Strengthening from km 74/0-79/250 of Abdullapuram-Asanampattu-Alangayam-Tirupattur Road including Widening of Box Culvert at km 75/6(SH-122)
Construction of High Level Bridge at km 5/2 of Banvaram - Sendamangalam - Ganapathipuram Road (M-577) in lieu of existing causeway
Strengthening from km 44/2-47/6 and 49/6-50/4 of Virudhachalam-Ulundurpet-Villupuram road (SH-69)
Widening from 2L to 2LPV and Improvement at km 7/0-10/0 of Tirupattur-Singarapet Road including Reconstruction of High Level Bridge at km 9/10 (SH-18A)
Periodic Renewal of Trichy to Karaikudi section of NH210 and Trichy Bypass on NH67 in the State of Tamil Nadu
Package 3 Renewal of B.T. Surface at 1. Perumalpuram main road, 2. PERUMALPURAM 2ND STREET, 3. Perumalpuram water tank west road, 4. Perumalpuram water tank North road, 5. Anbu Nagar South West - South 1st cross Street, 6. NH Colony 1st cross street
Construction of Four Lane Bypass to Vettavalam Town from Ch.0/0 to Ch.4/465 (Starting at Km 104/850 and ending at Km 109/190 of NH 38 Mangalore-Villupuram Road) under AP-2024-25 in the State of Tamil Nadu
Restoration of road cut surface for laying water supply pipe lines under 24x7 WSS from Bangalore ,Kanakapura ,Malavali ,Kollagal ,Chamrajnagar , Sathy ,Coimbatore Road NH 948 (Sathy Road ) in between Km 312/100 ,Km 315/570 in RHS and Km 312/100 ,Km 3
Construction of Road Over Bridge at Chettipunniyam Road branching at Km.50 4 of Grand Southern Trunk GST Road NH 45 in lieu of existing Level Crossing No49 at Railway Km.53 28 30 in between Chengalpattu and Singaperumal Koil Railway Stations
RE-TENDER 15TH FC TIED 2ND INS 2022-23 CONSTRUCTION OF DRAINAGE WITH CULVERT AT 6TH WARD SITHTHI MUTHI VINAYAKAR KOVIL TO TRICHY DGL NH ROAD, 10TH WARD RS ROAD TO EB COLONY ROAD, 15TH WARD KURUMBAPATTI MAIN ROAD IN VADAMADURAI TOWN PANCHAYAT
Restoration of road cut surface for laying water supply pipe lines under 24x7 WSS from Bangalore ,Kanakapura ,Malavali ,Kollagal ,Chamrajnagar , Sathy ,Coimbatore Road NH 948 (Sathy Road ) in between Km 317/900 ,Km 316/100 in RHS and Km 314/480 ,Km 3
Short Term Maintenance Contract (STMC) works from Km 0/0 to Km 17/8 and Km.35/6 to 36/0, 18.200 Km of NH 179A of Salem Thiruppathur Vaniyambadi Road in the State of Tamil Nadu (STMC) for the year 2024-25
Formation of 3rd Cross Road from LS 2800m to 3150m including street lights and construction of RCC side drain near M/s. Saint Gobain, RCC Box culvert to Service Road from NH 48 near M/s. Luxhare at SIPCOT Industrial Park, Sriperumbudur