Loading…
Loading…
1,159 results • Best match
Construction of High Level Bridge at km 10/6 of Thirupachur-kadambathur-kondancheri road in lieu of existing causeway
Construction of high level bridge at km 0/4 of olakkur railway feeder road in lieu of existing causeway.
Construction of High Level Bridge at km 10/8 of NC Veeralore Road to Polur Chengam Road vilkilpalur (ODR) in lieu of causeway
OperationandMaintenanceforDindigulKumilisectionofNH-183
Short Term Maintenance from Km.0/000 to 24/370 and Km.29/210 to 53/000 of NH 226 Extn (Km.13/200 to 38/990 and Km 44/542 to 68/912 of New NH136) under OR (DPP) 2022-23 in the State of Tamilnadu
PGF 24-25 1.Strengthening of road from NH 45 road to PDShop 2.Upgradation of road and RCC Slab Culvert from SVM School to Deiva City 3.Upgradation of road and RCC Slab Culvert from Chithambaram Bye Pass road to Palaiyah House in Koothur Panchayat
Constructions of Missing Storm Water drain in Selected Stretches from Km 170/800-192/600 (8000m) and Construction of Box Culvert at Km 171/0, 175/7 and 197/0 and Berms Protection work from Km 199/0-199/2 (200m) of NH 234 Mangalagiri-Vengatagirikottah
Appointment of Safety Consultants for 4 laning of Krishnagiri to Thumbipadi from Km.94.000 to Km.180.0 and Thumbipadi to Namakkal from Km.180.0 to Km.248.625 and Namakkal to Karur from Km.248.625 to Km.292.6 of NH-44 in the State of Tamilnadu 4thCall
Permanent Rectification of Black Spot TN-(02)-468 TN-(02)-216 by construction of VUP at Km.177/880 (Pannapatty Jn) along with Service Road in the project of Krishnagiri Thumbipadi section of NH-44 (Old No NH68) in the state of Tamil Nadu on EPC
Special Repairs at Km 9/4-10/7 of NH 210-Vattanam Road
Construction of Minor Bridge at km 0-2 of NH 210 - Vattanam Road
Special Repair to NH 210 Vattanam road at km 11 0 12 6
Strengthening the road from KM204 6 of NH to Nathamedu road Via Chinnamanaikanpatty
OperationandMaintenanceforOneyearofThanjavurTrichySectionNH67NewNH83intheStateofTamilNaduonItemratebasis
Widening the existing 2 lane carriageway to 2 lane with paved shoulders from Km 33/9 - 34/2, 37/6 -37/9, 40/4 - 49/8 of NH 544H, Strengthening from Km 33/0-49/8 (Eligible stretches) including Construction of V shape drain andBreast Wall in Ghat sect
Widening to 4 lane in Km 40/510 to 41/450 and Strengthening from Km 15/600 to 90/275 including Geometrical Improvement at Km 37/400 and 46/800, Construction of Retaining wall, Breast wall, drain, culverts and Foot over bridge at km 78/900 of NH 85
Replacement of Existing various pipes with new 600mm DI K7 400mm DI K7 160 HDPE PN Class 6 pipes of Total length of 2490m near Muthampatty Railway Cross LC 159 for Construction of ROB from KM 24 3 to 25 4 NH 79 Salem to Ulunthurpet by Highway Dept
Rectification of Black spot (5 locations i.e. PY-(03)-12, PY-(03)-11, PY-(04)-1, PY-(03)-10, PY-(03)-09 and Hot Spot at 10 Locations in the Pondicherry to Tindivanam section of NH-32 Project Highway in the State of Tamil Nadu and Pondicherry (UT)
Permanent Rectification of Black Spot TN-02-246, TN-02-387, TN-02-533 and TN-02-266 by constructing a LVUP at Km 209 475 (Nallikalpatti Junction) in the project of Thumbipadi - Salem - Namakkal section of NH 44 in the state of Tamil Nadu on EPC Mode
IE Services for Operation and Maintenance of 4 lane carriageway of Salem to Kumarapalayam Section from Km.0 000 to Km.53 525 (TN-06) and Kumarapalayam to Chengapalli Section from Km.53 525 to Km.102 035 (TN-07) of NH544 (Old NH 47) in Tamil Nadu
Improvements of MRL04-NH 226 to kallarvalasai via seikalathur Km 0/0-3/200
Construction of Bypass to Gudiyatham Town in Km 23/100 to 29/250 including LA and Shifting of NH-234 (Mangalore-Villupuram Road) (NEW NH-75) in the State of Tamil Nadu on EPC Mode
BT work PCC RCC Retaining wall Road Furniture
Operation and Maintenance including Incident Management for 6 months for Madurai Paramakudi to Ramanathapuram Section of NH49 New NH85 87 in the State of Tamil Nadu
OperationandMaintenanceincludingIncidentManagementofTrichyBypassTovarankurichiMaduraiSectionofNH45BNew NH38onitemratebasisintheStateofTamilNadu
Forming and improving Western Bypass road to Tirunelveli town branching from Km 148 8 of NH 44 Thazhaiyuthu and ending at Km 169 6 of NH 44 Konganthanparai vilakku Phase I Km 21 0 - 33 2
Strengthening and Black topping to the Devipattinam Murappankadu Road to Deviyar to NH 208 Road
Construction of Bus shelter at Ward No 6 Veppankal Near NH in Pallikonda Town Panchayat
Strengthening the road from NH -67 (Lakshmipuram) to (via Poomandampalayam) Nedungur BT road (R-480)
Special Repairs at Km 17 0 19 0 of NH 210 Vattanam road MDU 148
Construction of High Level Bridge at Km 8/10 of NH-49 to Mudaloor road
Construction of Bus shelter at Tricy Rameshwaram NH Old Senjai in Karaikudi City Municipal Corporation.
Forming of Bypass to Sivagangai town branching from Km 129 2 of Thanjavur Manamadurai road SHU Sivagangai urban stretch and merging with Thanjavur Manamadurai road NH226 NHAI road at Km 141 8 Length 10 800 Km Phase I Km 0 0 76
Forming of Bypass to Sivagangai town branching from Km 129-2 of Thanjavur - Manamadurai road SHU Sivagangai urban stretch and merging with Thanjavur Manamadurai road NH226 NHAI road at Km 141-8 Length 10.80 Km Phase- II Km 7-6 10-8
Construction of Additional Culverts at km 178/900, 186/050, 187/10 and 200/040 of NH 234 (New NH No.38) (Mangalore-Venkatairi-Kottah-Pernampet-Gudiyatham-Katpadi-Vellore-Polur-Tiruvannamalai-Villupuram Road) on Item rate basis
Widening the junction at km 2 /4 of Abandoned NH 45 Extn in Periyakulam Town roadSHU45
Special Repairs at Km 10/7-10/9, 13/2 -14/2of NH 210-Vattanam Road
Renewal the road from Road joining NH to Podarampalayam AD Colony 0/0-0/988 km
Annual Maintenance Including Incident Management for Operation and Maintenance of Thirumayam Manamadurai Section of NH 36
Strenghthening the Road from Kannaiyan teashop to NH 7 Km 0/0 -2/0 R 351
Replacement of 400 mm PSC 300 mm AC 200 mm AC and 150 mm AC pipe with 400 mm O PVC 315 mm OPVC 250 mm 225 mm 160 mm 140 mm 75 mm HDPE Pipes in Feeder Main VIII for Palladam Dharapuram Road Junction to Kurukathi for NH 81 under Revamping
Short Term Maintenance from Km 1/4 - 2/4, Km 10/350 -15/6, Km 16/8 -17/0, Km 20/860 -21/6, Km 40/4 -41/2 and Km 58/3 -63/2 of NH-181 (Coimbatore to Gundlupet Road) under OR (DPP) 2022-23 in the State of Tamil Nadu
Road Restoration Work after Laying of 700mm dia DI K7 pipeline The road from Km 0 135 to 0 880 Km 0 940 to 4 625 Km 4 725 to 8 220 RHS and Road Crossing Kms at 1 337 3 231 7 270 of Avinashi Tiruppur Avinashipalayam Road NH 381 Tiruppur Distr
Widening to Two Lane with paved shoulders from Km 456/0-463/0 and Km 466/0-466/4 and Strengthening from Km 456/0-472/0 of NH-67 (New No 181) including widening of minor Bridge at Km 458/8 and Construction of CD works and Protective works in the
Widening of existing 2 lane paved shoulder to 4 Lane paved shoulder in km 268/40 to km 271/30 an km 273/00 to km 273/80 and widening end to end and Improvements from Km 271/3 to 273/0 of NH-948 (Coimbatore - Sathyamangalam Road) (length 5.40 Km) incl
HR CARBON STEEL PLATES 8x3000x6000mm TO SPEC P355 NHOF EN 10028 3 AND AS PER BHEL TDC: RTF: 311/03, HR CARBON STEEL PLATES 16x3000x6000mm TO SPEC P355 NH OF EN 10028 3 AND AS PER BHEL TDC: RTF: 311/03, HR CARBON STEEL PLATES 18x3000x6000mm TO SPEC ... P355 NH OF ... P355 NH OF ... P355 NH OF ... P355 NH OF ... P355 NH OF ... P355 NH OF ... P355 NH OF ... P355 NH OF ... P355 NH OF ...
Widening existing 4 lane to 6 lane and Improvements from Km 31/0 (Chettipedu) to Km 34/0 (Irungattukottai) of NH-48 (Old NH-4, Chennai Bangalore Section - 3.00km stretch including Flyover at Km 31/550 Thandalam SH50B Intersection)
Please participate in the Tender.
Widening existing 4 lane to 6 lane and Improvements from Km 18/6 (Senneerkuppam) to Km 22/7 (Poonamallee) of NH-48 (Old NH-4, Chennai Bangalore Section- 4.10 Stretch including Flyover at Km 20/10 Parivakkam SH 206 Intersection)
TRENCHING,HDD,PLB LAYING,CABLE BLOWING AND OTHER ALLIED WORKS IN SECTION NO.DE/CNTX/ CNI/ULU-VLU/25-26/SEC-02 IN KM 167/8 of NH 38 KM 175/0 of NH 38 OF ULUNDURPET - VILLUPURAM 48F STR OFC ROUTE