Loading…
Loading…
2,507 results • Best match
Providing Road safety interventions on Nizamabad-Jagdalpur road of NH-63 at Velpur X road chainage km 33/950, before Kammarpally C curve and Y junction towards Metpally, infront of Kammarpally police station, Agricultural Market committee building K
Construction of Storm Water Drain from E.P. UH/8 to NH-63 Existing RCC Slab Culvert in Urban Permanent Housing Colony Culvert in Korutla Municipality under Pattana Pragathi Grants (This work is reserved for SC Societies/ Individuals only)
Reconstruction of Arch Khaman at Ramalayam affected under Road widening 120 ft to 150 ft for proposed uppal junction 2nd level GHMC flyover and Elevated Corridor of R and B NH at Warangal Highway Uppal PD EZ GHMC
Construction of New BG line Between Bhadrachalam Road and Satupalli Station for ROB No.50 on Vijayawada-Jagadalpur NH-30 Road at Km 93/2-4 in Bhadradri Kothagudem District. SW:-Shifting of existing Mission Bhagiratha grid pipeline.
Package No - TS8AMIIIBLB03 - Construction of HLB on R/F NH 765 to Shankerkondathanda via Meddagadda Thanda at 3/0 to 3/2 Km of Amangal Mandal in Ranga Reddy District with Estt Cost Rs.319.55 Lakhs - 2nd call
Improvements of Junction at km 1/8 - 2/0 and Widening of Existing Cuddy Stone Culvert with (1V of 3.00 m span) at km 11/4-6 on NH-16 to Bheemgal road in Nizamabad District (2nd Call).
Construction of HLB (10 vents of 10m span) across phulong Vagu on NH-63 to Manikbandar road near Mubaraknagar of Makloor mandal in Armoor Constituency in Nizamabad district. Sub work:- Pre-survey and Preliminary sub-soil investigation work
Development of road infrastructure viz a flyover, high level bridge and underpass at Yellandu in Bhadradri Kothaudem District. S.W:- Providing Road Safety Interventions at Geometric improved portions and scour filling in NH 930 P to Karepally Junction Road.
Consultancy services for preparation Design and Drawings with cost estimate of 8 Nos of Foot over Bridges FOB on NH61 extn, NH63, NH63 extn under the jurisdiction of R&B NH Division Perkit in the State of Telangana
Widening and Strengthening from Single lane to Double lane Road from Maheshwaram to NH 765(via) Thummaloor from Km 0/0 to 5/100 in Ranga Reddy District(actual length from Km 0/0 to Km 4/940).
Widening and Strengthening of NH road Durgampet to Akkampet road from Km.0/0 to 6/2 in Warangal Rural District sub- Work:Providing caution boards/Warning sign boards,Village Name boards,Metal Crash barrier under Road safety Interventions
Consultancy Services For Authority s Engineer For Supervision of Rehabilitation and Up gradation of Valigonda to Thorrur Section to Two Lane with Paved Shoulders from Km 39.180 to Km 108.300 of NH 930P in the State of Telangana
Maintenance works and activities on 2-lane with paved shoulder stretch from km 15.525 to km 62.880 for a length of 46.355 km of Jadcherla to Kalwakurthy section of NH 167 in the State of Telangana through PBMC
Construction of 2 No of FOB at Km 267. 6 to 8 and 273.0 to 2 on Mahbubnagar Jadcherla section of NH 167 in the State Of Telangana under Road Safety Annual Plan 2022 23 on EPC mode
Rehabilitation and Upgradation of Nehru Nagar to Kothagudem Section from Km 178.500 to 230.580 of NH 930P in Telangana Sub work Providing fencing for proposed CA land identified and allocated for the purpose of diversion of forest land
Development of New A Site KSK at 2 ROs listed below under Warangal Divisional Office , Telangana and Andhra Pradesh State Office. i. Bijigirsharif village, Jammikunta Vavilala road, Jammikunta Mandal Not on NH SH, Karimnagar District ii. Porandla v
High Voltage HRC Fuses Din type 25 A, 1000 V, AC, size NH 000M gB Breaking capacity 63 KA conforming to IS:13703/ IEC 269.2 to SIBA Make part no. 2038603 or similar. Acceptable Makes: EATON, Siba, EFE
Long term Rectification of MoRTH identified Blackspots by Construction of LVUP VUP n FoB under the project Maharashtra Karnataka Border Sangareddy section of NH65from Km.352.188 to Km.497.174 in the state of Karnataka and Telangana
Construction of VOP near Sadahalli Gate at Km.538.832 of Ministry identified blackspot KA01 016BS for Hyderabad Bengaluru Section of NH7 from Km. 534.720 to Km. 556.840 in the State of Karnataka on EPC mode
Emergency Repairs from km 8/0 to 25/0 (Kaleshwaram to Mahadevpur of Jayashankar Bhupalpally District) section of NH-353C (Road Safety Interventions and protection works) in view of Saraswathi Pushkaralu-2025 in the state of Telangana 2nd call.
Periodical renewal of the stretch from km 45.8 to km 53.2, km 56.3 to km 60.040, km 61.5 to km 65.2 and km 69.0 to km 75.2 of Khammam - Kuravi section of NH-365A in the state of Telangana
Remodeling of 600 mm dia RCC Pipeline and Restoration of the trench from Moon light Bar & Restaurant to Nexa Showroom at NH-65 Service Road near 6 Mall in Ward No.23,Gaddiannaram of Saroor Nagar Circle-5, GHMC.
Construction of New BG line between Bhadrachalam road to Sathupalli Station ROB No.50 on V-J Road NH-30 in Bhadradri Kothagudem Dt. Sub Work: Conducting Sub Soil investigation at Km 93/2-4 on V-J Road.
FDR for Damaged Repairs Permanent restoration to damaged approach road and steel guard rails of HLB of Regunta Village of Mallapur Mandal at Km 729.600-800 on Kalyan-Nirmal-Jagtial road of NH 61 in the state of Telangana
Consultancy Services for preparation of DPR for Widening to 2 lane or 4 lane from Km 0.000 to 33.000 of Adilabad Bela section of NH 353B in the state of Telangana under Annual Plan 2021 22 on EPC mode
Consultancy Services for Authority Engineer for Supervision of work Rehabilitation and Up gradation of Thorrur to Nehru Nagar Section to Two Lane with Paved Shoulders from km 109.420 to km 178.500 of NH-930P in the State of Telangana
Laying of CC Road and Drains in Kamsanipally Village from km 20/520 to 21/0 and Uppununthala mandal head quarters from km 25/950 to 26/050 of NH -167 to Uppununthala via Dindichinthapally road in Nagarkurnool District.
Consultancy services for investigation of approach road and bridge work of Widening of existing 2 lane bridge to 4 lane at Km 4/4 on Nizamabad -Jagdalpur section of NH 63 in the state of Telangana on EPC Mode.
Desilting of Underground Drainage Pipelines from Church High Tension lane Mallikarjun Nagar to Public Toilets at NH-163 using Sewer Croc Smart JETVAC Machine Ward No.10 in Peerzadiguda Municipal Corporation under Municipal General /PattanaPragathi Funds 2023-24 (RECALL)
Laying of CC Road from PV. Vamshi House to C-lam Ravi House Via Ganga Ram House and NH-44 Paradise Hotel to Yadavs Graveyard in Ward No. 08 in Shamshabad Municipality Under Municipal General Funds / Any other Funds.
Engaging of JCB vehicle and Chain vehicle for desilting the nalas from Back side of MRO office to old NH-9 in w no 6 ward in Kodad Municipality under 15th FC Untied Grant for the year 2024-25
FDR by temporary restoration to breached portion at Km 2/8-10 on Nh-63 road to Neelwai via Racherla road in Mancherial District. (Reserved for SC, ST and Vaddera Labour Contract Cooperative Socities and SC & ST Unemployment Technocrafts)
Nakrekal Municipality- Widening and strengthening of old NH-9 Nakrekal town portion to four lane road from Double lane from 111/0-115/6 and construction of central median,street Lighting(4.6Km) in Nakrekal Municipality under TUFIDC Loan Assistance
Widening to single lane to double lane of NH 44 to chengal via padkal road from km 0/0 to 14/0 (working reach from km 1/2-14/0) in Nizamabad Dist. Sub work:- Providing Road safety internations
Periodical Renewal to Duddeda Siddipet Siricilla road NH 365B from km 154.0 to km 155.0, km 160.0 to km 175.0 and km 179.0 to km 183.570 for the year 2021 22 in the state of Telangana on EPC Mode
Improvement of road safety through rectification of identified Black spot ID TG-02-248 by permanent improvement of junctions near Chinnaboinapally from Km 242.400 to Km 243.240 of Warangal Mulugu section of NH 163 in the state of Telangana
Laying of 90mm dia PVC 6kg/Cm2 pressure Water supply pipe line from ACP Office Back side near Anganwadi school to Ashok house, Ajju Bhai house to Kausar house patel Road, Nandigama Balaiah house at Patel Road to Mini function Hall, Asad Nhai house at patel Road to Nandigama Balaiah house, Kalamma house to Raju house in Nehrunagar colony, kalamma house to Parameshwara Theatre Nehrunagar colony, Advocate Rajashekhar house to shekhar house in Nehrunagar colony in Shadnagar Municipality under SFC Grants 2019-20
Rehabilitation and Upgradation to 2-lane with paved shoulders configuration of Gondiguda to Araku (up to Bhallaguda) section (Km 27/480 to Km 51/772) of NH 516E in the State of Andhra Pradesh under GNHCP the loan assistance of World Bank on EPC mode
Appointment of Safety Consultant to carryout Road Safety Audit for Stretches under Operation and Maintenance in the state of Telangana (Package - I) - 3rd Call.
FourLaning of NH363 from Mancherial,Des Km 0.00Existing 251.900 to Repallewada,Des 42.000Existing 288.510,Des Length 42.000 Km in the state of Telangana under NH-O on Hybrid Annuity Mode One time improvement of the Bypassed sections of NH363 2nd Call
ER to Paver Patches from Km 55.400-57.375 2L, 59.000-59.200 2L, 65.600-65.800 4L, 65.800-67.200 2L, 68.000-68.600, 69.000-69.600, 97.000-97.200 and 101.800-102.000 on NH-63 Nizamabad - Jagadalpur road in Jagtial District in the State of Telangana
Consultancy Services for Authority Engineer for Supervision of Construction of Two Lane with Paved Shoulders for Gowrelly to Valigonda Section from Km 0.000 to Km 41.920 Green Field Alignment of NH 930P in the State of Telangana on EPC Mode
Consultancy Services for preparation of DPR for the work Strengthening and Improvement from Km 231.0 to 231.420,232.580 to 236/0,248/0 to 265/400, 290/500 to 294/600 on Hyderabad-Bhupalapatnam Section of NH-163 in the State of Telangana
Consultancy Services for preparation of DPR for I.Widening 2LPS of balance reaches Km 184.840 to Km 190.00 and Km 194.840 to 198.800, II.Construction of additional vent to existing Major Bridge at Km 210.0 to 2 of Nizamabad-Jagdalpur NH 63
Periodical Renewal to Jagityal Karimnagar Warangal Section NH 563 from km 25.0 to 26.2 , 26.4 to 6 , 26.8 to 27.2 , 27.4 to 6 and 27.8 to 35.0 for the year 2020 21 in the state of Telangana under EPC mode.
Conducting survey using Network Survey Vehicle for the work of Widening to 2 lane 4 lane with paved shoulders from Km182 120 to 227 6 of on Haggari jadcherla Road on EPC mode NH O in the State of Telangana
Widening and Strengthening of existing intermediate lane or two lane to two lane with paved shoulders from km 678.555 to km 699.655 of Nirmal to Khanapur section of NH 61 Extended in the state of Telangana under NHO on EPC mode
Carrying out NSV and FWD survey for the work of Rehabilitation and Upgradation of NH 167 from Design Km 187/723 Miryalaguda to Km 234/434 Kodad to 2 lane with paved shoulders in the state of Telangana on EPC basis
Consultancy services for preparation of Detailed project Report for Widening of Existing 2 lane to 2 lane with Paved shoulders from km 279.150 to 290.500 on Hyderabad Bhupalapatnam road of NH 163 in the state of Telangana under EPC mode
Construction of CC Drain and Culvert from Salauddin Shop to NH-65 and Laying of UGD and CC Road from Paparaj House to Saber Bhai House and Balraju (H) to Kairath House at ward No.5 in Sadasivpet Municipality. 2nd Call