Loading…
Loading…
118 live55 closing this weekmost from National Highways Authority of India and Chief Engineer PWD Faizabad Zone
118 results • Best match
Development/upgradation of existing 4 lane to 6 lane of Lucknow Sitapur section km 412.745 to km 479.327 (Length 66.582 km) of new NH30 in the State of Uttar Pradesh on BOT (Toll) Mode
Dev of 4/6L of AC Kanpur Kabrai GF highway start 0.000 (Kanpur Ring road) to 117.700 near Kabrai Sec1 and Overlay/Strengthen other road safety and improvement works on exist Kanpur Kabrai sec from 7.430 to 130.100 of NH34 in UP Sec2 on DBFOT pattern
Development, Operation and Maintenance of Wayside Amenities 01 O-M site in Odisha and 01 O-M sites in Uttar Pradesh (2 O-M Sites)Khordha - Brahmapur/NH-16/305.225to305.375/LHS/ Berhampur/Odisha
Rectification of Long Term measures of MoRTH identified 03 nos of Blackspots at Iradatganj Naya Pul Naini Bridge Section and Ghoorpur Kasba on NH 30 Old NH27 in the State of UP
RFP for the work of One Time Improvement (OTI) of NH-227A from km 130 to km138 (Barhalganj Town) and km 184 to km 188 (Lar Town) in the State of Uttar Pradesh.
RFP For Construction of Gonda Bypass (western part) of NH 330B to four lane with paved shoulder configuration design length of 20.570 Km under Hybrid Annuity Mode (HAM) in the State of Uttar Pradesh
Short Term Maintenance from km 21.627 to km 34.000, km 65.000 to km 66.000 and km 67.000 to km 69.000 of NH-328A in the state of Uttar Pradesh in the year 2026-27.
Improvement of existing bypassed section of NH 731A from Km. 35.110 to Km. 43.830 (Lal Gopalganj) in total 8.72 Km. length under One Time Improvement policy under EPC mode in the state of Uttar Pradesh.
Strengthening of dilapidated road sections of NH-135C from km. 84.600 to km. 85.290, km. 85.750 to km. 86.950, km. 87.210 to km. 87.360 and km. 105.000 to km. 105.170 for providing safe connectivity under Special Repair.
RFP for the work of Widening and Strengthening from Km 0.000 to Km 38.853 of NH-330D (Sitapur to Kurain Section) to two lane with paved shoulder configuration under EPC mode in the State of Uttar Pradesh.
Improvement of existing bypassed section of NH 731A from km 52.200 to 54.370,57.314 to 57.746, 60.670 to 61.460,65.06 to 68.58, 83.530 to 87.110 and 89.130 to 92.140 (Kaushambi to Chitrakoot Section) in total 13.502 km length under OTI on EPC mode
Construction of CC road, drains, and interlocking work on the side berms from NH-28 Highway via the house of Raghavendra Ram Tripathi and the house of Dr. S. K. Sharma up to the public toilet, and from the house of Chiranjan Dubey up to Prem Kunj in
Construction of a 2 cell grade Separated Structure with 20m span each at Amila Village on NH 29 as a long term road Safety measure on EPC Mode for the package of 4laning of Varanasi Gorakhpur Section of NH-29
Construction work of RCC box culvert
ok
Construction of Light Vehicular Underpass LVUP at Pidhwal Mod as a long term road Safety measure on EPC Mode for the package of 4 laning of Varanasi-Gorakhpur Section of NH-29 Package III in the State of Uttar Pradesh
Deoria se Kasia marg (NH-79) ke chaudikaran avam saundhriyakaran ke kaarya me vadhak patari par lage pol sahit strict light ko ayantra sthan (ward no 05 hospital ke pas ward no 3 shashtrinagar ward no 13 lohiyanagar ward thana get par shifting kary