Loading…
Loading…
6,373 results • Best match
Renewal work with General Repair of NH-3 to Chheetapura to Nadim Road
WORK 69 NP BADLAPUR 09 CONSTRUCTION OF INTERLOCKING ASHWANI SHUKLA TO NH 731
Special Repair of Etawah Agra Old NH 2 km 8 to Butar Road
Repair of Damaged embankment of Chidiyapur Samipur NH-34 nehar Seva Road ODR
Repair of Paliya Shahjahanpur Hardoi Lucknow Road NH 731 Ch 255.8 to 259.4
Special repair work of Parwai link road from Jhansi-Gwalior road NH-44
Special Repair of work of NH-3 Digner Nehar Patri Gangraua Gutila Road
Repair work of minor bridge located at Km 8 of NH-56 (ODR)
NH 2 SE THAIRA MAURYA BASTI SAMPAR MARG KE VISESH MARAMMAT KA KARYA
Filling of Pot Holes and Repair work of NH-227A in Km.117
Renewal with normal repair on NH-235 Sadikpur Railway Crossing to Ghungrala road
Construction work of NH-28 to Jolha Tola Link road in Dist Kushinagar
Steel Pipeline crossings at five locations across NH under Udham Singh Nagar GA
Work of One time improvement/ maintenance of old NH-24 (Rampur City Portion).
Filling of Pot Holes and Repair work of NH-227A in Km.116
Renewal of NH 76 to Kalwara Link road Km 1 and 2(800)
NH 74 khanpur pokhra se baram baba tak sampark Marg ka nirman karya
ADVANCE FIELD PREPARATION, LANDSCAPING BEAUTIFICATION PLANTATION MAINTENANCEOF PLANTATION MEDIAN FOR FIVE 5 YEARS INCLUDING YEAR OF PLANTATION IN PIU-PRAYAGRAJ UNDER REGIONALOFFICE UP EAST VARANASI
Repair work of damaged (Sapna Talkies) Damola river bridge situated in Km 36 of old NH 73 (New NH 344) to Km 13 of Sarsawa road via Gagalheri Saharanpur.
Flood Damage Repair 2020-21 on NH-92 in Km. 11.00 to 14.00, 19,25,34,39,41, 44,54, 71,72, 76 to 78 under Jurisdiction on NH Division, PWD, Etawah in the State of Uttar Pradesh.
Development of New ASite Retail Outlet at location Between Km Stone 118 and 120 on Gajraula Joya Road NH 9 Old NH 24 on LHS Distt Amroha under Moradabad DO UPSO II
Providing and installing W metal beam crash barrier at selected locations from km 23 to km. 33 in hilly stretch on NH-72A(New NH-307) in the State of Uttar Pradesh
Work of construction of minor bridge (3-Cell RCC Box Structure) over Mohand River on NH-72A (New NH-307) in km 26 (No. 26/6) in the State of Uttar Pradesh.
One Time Improvement of km. 0.410 to 3.000 of NH-235 (New NH-334) in total Length of 2.59 km for the financial year 2023-24 in the State of Uttar Pradesh.
Operation and Maintenance of Lucknow-Ayodhya Section from Km. 8.000 to Km. 137.970 Stretch of NH-27 (Old NH-28) Total Length 129.970 Km in the State of Uttar Pradesh-3rd Call
STMC work of NH-321 Kiraoli-Kagarol from Km 0.000 to 15.010, STMC Work of NH-91A Etawah-Bela-Kannauj Road from Km 41.000 to 66.000 in the State of Uttar Pradesh.
Supplying and Erection (Fixing/Installation) of Pre-Fabricated Office Container of Various Sizes as per the drawing provided by the NHAI along with various necessary civil works and general electrical works at Various Locations along Eastern Peripher
SHIFTING OF EXSITING 33 KV 11 KV LT LINE FROM NH-27 GORAKHPUR BYPASS
Special repair work from km 29 of NH 73 road to Chamarikheda road
Special repair work from Km 43 of NH 73 to Sadak Dudhli marg
Development of New A RO at Location Between KM Stone No. 103 and 109 on NH-44, RHS While going from Jhansi to Sagar, District- Lalitpur under Kanpur Divisional Office of UPSO-I
Development of New A Site RO at Location Village - Talramgarh (Between Km Stone 267 and 275, RHS on NH-27 from Lucknow to Gopalganj, Distt. Gorakhpur under Gorakhpur Divisional Office of UPSO-I
Proposal: NRO “Between KM Stone 234 & KM Stone 238 on NH-31” at Mouza- Iniyar, District: Begusarai, Bihar. RO is located on NH- 31 which is a major National Highway of our Nation (having total spread of 968 KM) which provides gateway to the states of ... with NH -12 ... with NH -27 ... on NH -31” ...
As Per NIT
Maintenance of NH 730 under the Short Term Maintenance Contract on percentage rate basis for the year 2023-24 under the jurisdiction of NH Division, PWD, Siddharthnagar in the State of Uttar Pradesh.
Maintenance of NH-330 under the Short Term Maintenance Contract on percentage rate basis for the year 2023-24 under the jurisdiction of NH Circle PWD Lucknow in the State of Uttar Pradesh
Emergent Maintenance of New Four Lane Agra Bypass Section from Km. 00.00 to Km. 32.00 connecting Km. 176.80 of NH-2 to Km. 13.03 of NH-3 in the State of Uttar Pradesh
Widening and strengthening work of Meerut Pauri (NH-34) road from Kaserukheda drain to Modipuram (NH-58) road via Meenakshipuram, Mamepur Lalsana Sheelkunj Colony road chainage from 0.000 to 3.170 (other district road)
Short Term Improvement and routine maintenance of Naini cable stayed bridge with approaches from Km minus 1.117 to Km 4.293 on NH 27 New NH no 30 At Allahabad in state of UP
Improvement of Highway in front of New High Court Building, Lucknow and development of Ayodhya Bypass, NH-27 (old NH-28) as a Model Stretch on EPC Mode in the State of UP
Periodic Renewal work from Km. 41 to 55 Ch. 40.000 to 55.000 and Km. 70 to 95 Ch. 69.000 to 95.000 of NH-330D in Uttar Pradesh of NH-330D under EPC mode
Maintenance of NH 334DD under the Short Term Maintenance Contract on percentage rate basis for the year 2023-24 under the jurisdiction of NH Division, PWD, Ghaziabad in the State of Uttar Pradesh
Special Repair of NH 931 Chaura To Shunil Singh Ke Ghar Tak Link Road
Under renuwal in the year 2024 25 Work at NH 2 to Madawali Road
Construction of Faizabad Raibarely NH 330A to km 82 to Pure Paltan Link Road
R/o NH-24 Km-464 toTrilokpur road Km-2 to Gulalpur link road.
RENEWAL OF NH 509 KM 197 VIA ROHAI KORNA CHAMRUA HATHRAS DAUJI KOTA ROAD
Construction of Karchhana Kohdarghat NH-135C marg to Siska hote hue Bhadratali Link road
Construction of NH-31 to Gram Sarairaichanda at Ajad Yadav House in Distt. Jaunpur
Construction of Vented CauseWay at NH-24 Harsukh Majra to Illar Rasulara link road