Loading…
Loading…
4,233 results • Best match
Short Term Maintenance Contract work from Km 114.975 to Km 118.688 and Km 119.666 to Km 127.766 and Km 128.828 to Km 137.684 of NH_117 under National Highway Division_I, P.W._Roads_Directorate, West Bengal. Job No. NH-12_WB_2025_26_STMC_01.
Drawal of new 11 KV UG cable to cross National Highways at Barasuli to effect the NSC iro Arpan Sengupta LT bulk consumer under Jhargram Division
CONSTRUCTION OF DRAIN FROM THE HOUSE OF ACHINTA SENGUPTA TO NATIONAL HIGHWAY AT BIRPARA I GP IN MADRAIHAT BIRPARA PS UNDER ALIPURDUAR ZILLA PARISHAD
Installation / erection of Holding structure and fitting fixing banner for awareness messages 3D printing on National Highways (8m X4M) Four Number under Kalimpong Forest Divison. 244053/ nos
Request for Empanelment (“RFE”) issued by National Highways Infra Trust (NHIT) for Empanelment of Agencies/Firms for Rigid Pavement works at Project sites under SPVs of NHIT.
Improvement of road by Cement Concrete from 81 National Highway to Dakshin Kashipara Mosque at Kashipara under Malatipur Gram panchayat .
Construction of the Road from Debipur GT Road to Abujhati National Highway Road within Memari-I Block Length 10.920 km
Dismantling Re-Construction of Drain from Sibdas Banerjee house to national highway sub lane within wards no -19, under D.M.C.
Patch Repairing work in between different locations of stretches from Ch 298.00 km to Ch 301.00 km under Durgapur NH Sub Division of National Highway Division No III in the district of Paschim Bardhaman during the year 2023-24
Short term restoration work at Valley side at Ch. 42.50 km damaged due to eroding effect of river Teesta on 19.06.2024 of NH-10 under National Highway Division-IX in the District of Kalimpong during the year 2024-25.
PR work from km 221to225 IRQP from km 225to232PR from km 232to260 km 266to271 Except km 247.066to 248.040 From km 269.067to269.598 258.226to258.99 km 267.060to267.440 of NH-60 under NH Divn III in the Dist of Bankura WB during the year 22 23.
CONSTRUCTION OF CC ROAD FROM NATIONAL HIGHWAY TOWARDS H-O CHANDAN DAS PART 13-228, FALAKATA II GP WITHIN FALAKATA P.S.
Consultancy services for AE for Construction of Descoped Portion of Binnaguri Bypass in Binnaguri Mouza of NH-27 (Old NH-31D) from Chainage 17.500 to 23.000 of old NH-31D in the District of Jalpaiguri West Bengal on EPC Mode under NH(O)
Repairing Bituminious Road from Maynaguri Natun Bazar to National Highway via Sahidgarh HS School at Khagrabari GP within Maynaguri PS
Custom Bid for Services - Provision of SERVO Branded Multicolour Digital Wall Painting along the National Highways State Highways and other importantStrategic Locations as identified under West Bengal State Office
Creation and Maintenance of Avenue Plantation along NH-19.
Construction of Common Work Shed, Common Covered Sitting Area, GP-Tilpara, Suri I beside National Highway near Tilpara Samshan Ghat. (2nd CALL)
Construction of PCC Road from tower next to National Highway No. 16 to Baidyanath Mandal at Chandipur G.P. under Uluberia-I Block
Emergent repairing and restoration work in stretches between 47.300 km to 48.100 km of NH 131A under National Highway Division No.VII
Emergent Potholes Repairing Work in stretches in between Ch. 00.00 Km to 0.40 km, 9.50 km to 10.00 Km, 21.40 km to 27.00 Km. of NH Burdwan N.H. Sub-Division under National Highway Division No-III in the district of Purba Bardhaman
Emergent repairing of Bituminous Pavement in between km 203.450 to Km 203.950 and providing speed breakers on different link road within ROW in between km 207.00 to Km 210.00 of NH-60 in the district of Bankura under National Highway Division-III dur
Periodical Renewal work from km 181to205.2(Except km 181.636to182.132, from km 193.25to195.406 and From km 203.255to203.45) of NH-60 under NH Div No III in the Dist of Bankura West Bengal during the year 2022-23 (Job No. TA 14 WB 2022 23 )
Construction of PCC Road from National Highway to house of Paresh pal at jugpur under Billwagram GP Under Nakashipara Dev. Block (Fund Rashtashree)
Repairing of Road by Ordinary Cement Concrete at Bhiringi from Kishor Sangha Club to Connecting National Highway Within Ward no-19 under DMC
Construction of Concrete drain from Gate-I of Suri-I Dev Block towards National Highway under Karidhya GP under Suri-I Panchayat Samiti
Development, Operation and Maintenance of Wayside Amenities on different section of National Highways on Lease Basis in the states of Uttar Pradesh, Odisha, West Bengal, Bihar on O and M basis
Development, Operation and Maintenance of Wayside Amenities on different section of National Highways on Lease Basis in the states of Uttar Pradesh, Odisha, West Bengal, Bihar on O and M basis
Development, Operation and Maintenance of Wayside Amenities on different section of National Highways on Lease Basis in the states of Uttar Pradesh, Odisha, West Bengal, Bihar on O and M basis
Development, Operation and Maintenance of Wayside Amenities on different section of National Highways on Lease Basis in the states of Uttar Pradesh, Odisha, West Bengal, Bihar on O and M basis
Development, Operation and Maintenance of Wayside Amenities on different section of National Highways on Lease Basis in the states of Uttar Pradesh, Odisha, West Bengal, Bihar on O and M basis
Consultancy services for preparation of Detailed Project Report for Repair and Rehabilitation of 22 twenty two nos Bridges and Culverts of NH14 Old NH 60 NH 114 Old NH 2B NH 114A under National Highway Division No XII PW Roads Directorate
Development of 4 laning of Barasat-Barajaguli Section of NH-34 (New NH-12) from Km. 31.000 to Km. 48.679 in the district of North 24-Parganas in West Bengal on EPC Mode under NH(O) on EPC Mode
Repairing of Bituminous Road by Premixed carpeting With Seal Coat from J.P Avenue to National highway at Ambagan Within Ward No-28 Under DMC
Engagement of user fee agency through EQ for Kalapathar FP at km 14.550 on Bankura Purulia Section of NH 314 Old NH-60A in West Bengal
Consultancy service to obtain access permission from NHAI at NBSC, Siliguri
Short Term Maintenance Contract STMC work from Km 34.000 to Km 56.000 Km 64.000 to Km 80.000 and Km 94.500 to Km 111.710 Km. of NH 117 New NH12 under National Highway Division I in the district of South 24 Parganas during the year 2025 26.
Evacuation of settled ash 170000 cum from the Ash Pond, transportation and disposal in eco friendly manner from Sagardighi Thermal Power Station to Omarpur Flyover project site of NHAI at NH 12
Engagement of user fee collection agency on the basis of etender for Ghogarkuthi fee plaza at Chainage 801.120 of NH No. 31(New NH 17) in Pundibari Bakshirat stretch from km 770.85 to km 815.435 of NH 31 in the state of West Bengal
CONSTRUCTION OF PCC ROAD AT CHANDA PASCHIM BAURIPARA, FROM MITHUN BAURI HOUSE TO NATIONAL HIGHWAY 19, SERVICE ROAD,PS-122, WITHIN WARD NO-09, UNDER AMC
Electrical Installation work and SITC of RAC for proposed office of the Executive Engineer ,National Highway Planning and Design Division IV,Public Works Road Directorate at Khadya Bhawan,Central Block,8th Floor,Kolkata-87___EI work
Emergent Roof treatment, subsequent repairing of damaged internal wall and restoration of roof of Cycle Garage at National Highway Division No-VI office at Anatheswar Road, Krishnagar, Nadia under Krishnagar N.H Sub Division of National Highway Divn
Valley side protection works from Ch. 25.80 km to km 26.65, km 26.75 to km 27.20 and 27.41 km to 27.48 km to restore damages by flash flood in 2023 of NH-10 under National Highway Division -IX in the Dist. of Kalimpong on EPC mode - 2nd call, Job-548
Construction of Black top road from Kalaighata Bottala towards Aishtala 34 No National Highway within Habibpur and Ramnagar-I GP within Ranaghat-I Block in the district of Nadia
DEVELOPMENT, OPERATION AND MAINTENANCE OF WAYSIDE AMENITIES ON DIFFERENT SECTIONS OF NATIONAL HIGHWAY ON LEASE BASIS IN THE STATES OF UTTAR PRADESH, JHARKHAND AND WEST BENGAL ON DBOT BASIS
DEVELOPMENT, OPERATION AND MAINTENANCE OF WAYSIDE AMENITIES ON DIFFERENT SECTIONS OF NATIONAL HIGHWAY ON LEASE BASIS IN THE STATES OF UTTAR PRADESH, JHARKHAND AND WEST BENGAL ON DBOT BASIS
DEVELOPMENT, OPERATION AND MAINTENANCE OF WAYSIDE AMENITIES ON DIFFERENT SECTIONS OF NATIONAL HIGHWAY ON LEASE BASIS IN THE STATES OF UTTAR PRADESH, JHARKHAND AND WEST BENGAL ON DBOT BASIS
Emergent repairing and Restoration Work In Stretches between 39.800 km to 42.900 km of NH 131A under National Highway Division No VII in the District of Malda during the year 2023to24
Engagement of user fee agency through E-Tender at Kalapathar Fee Plaza at km 14.550 on Bankura Purulia Section from km 0.000 to km 83.562 of NH 314 (Old NH-60A) in the State of West Bengal
Engagement of user fee agency through E-Tender at Mejia Fee Plaza at km 267.250 on Dhaldanga - Mejia Section from km 221.000 to km 271 of NH 60 (New NH-14) in the State of West Bengal
Advance and creation work and subsequent 4 (four) years maintenance of 6609 nos. plants of Avenue Plantation along National Highway-2 from Kalyaneshwari Check Post to MV Rampur Check Post.