Loading…
Loading…
3,503 results • Best match
Transportation of water to unserved areas through hire tankers connecting to P&T Colony sump for the period of 01-09-2017 to 15-09-2017
Punganur Municipality - Transportation of Water through Private tankers for NGOs Colony Sump in 23rd ward in Punganur Municipality for months of June Part and July 2020
Transportation of water to unserved areas through hire tankers connecting to AV Naidu Colony Sump for the period of 01-09-2017 to 15-09-2017
Providing Internal Water Supply and Distribution line including Construction of Sump, Pump Room and OHSR at EMC-1 Kurakalva (V), Renigunta (M), Chittoor District.(2nd Call)
Laying of 110mm dia PVC Pipe lines 6kg/cm2 for interconnecting Bores from NLF SCHOOL & GAJJALAKUNTA to Ramarao colony Sump in 4th WARD IN MADANAPALLE MUNICIPALITY
Laying of 110mm dia PVC Pipe lines 6kg/cm2 for interconnecting Bores from NLF SCHOOL & GAJJALAKUNTA to Ramarao colony Sump in 4th WARD IN MADANAPALLE MUNICIPALITY
Laying of 110mm dia PVC Pipe lines 6kg/cm2 for interconnecting Bores from NLF SCHOOL & GAJJALAKUNTA to Ramarao colony Sump in 4th WARD IN MADANAPALLE MUNICIPALITY
Laying of 110mm dia PVC Pipe lines 6kg/cm2 for interconnecting Bores from NLF SCHOOL & GAJJALAKUNTA to Ramarao colony Sump in 4th WARD IN MADANAPALLE MUNICIPALITY
Laying of 110mm dia PVC Pipe lines 6kg/cm2 for interconnecting Bores from NLF SCHOOL & GAJJALAKUNTA to Ramarao colony Sump in 4th WARD IN MADANAPALLE MUNICIPALITY
Laying of 110mm dia PVC Pipe lines 6kg/cm2 for interconnecting Bores from NLF SCHOOL & GAJJALAKUNTA to Ramarao colony Sump in 4th WARD IN MADANAPALLE MUNICIPALITY
Laying of 160 mm Dia HDPE Pipe line from Municipal office Sump to Old CPI colony in the town Under 14th Finance Commission Grants 2016-17
Transportation of water to unserved areas through hire tankers connecting to Rama Rao Colony sump for the period of 16-09-2017 to 30-09-2017
Transportation of water to unserved areas through hire tankers connecting to Rami Reddy Layout sump for the period of 16-09-2017 to 30-09-2017
Providing Internal Water Supply and Distribution line including Construction of Sump, Pump Room and OHSR at EMC-1 Kurakalva (V), Renigunta (M), Chittoor District.(3rd Call)
Transportation of water to unserved areas through hire tankers connecting to Rama Rao Colony sump for the period of 01-09-2017 to 15-09-2017
Annual maintenance of Electrical and Mechanical Equipment at Sump cum Sewage pump house at Mangalapalem, Kondayavalasa of Ward No. 57 for the year of 2021-22
Transportation of water to unserved areas through hire tankers connecting to AV Naidu Colony sump from Dec-18, Jan-19 and Feb-19 under General Funds
Repairs to the existing fire fighting system and providing water pipe line from Sapthagiri sump to over head tank in KKC ( Main ) and Asthanamandapm at Tirumala
Punganur Municipality - Transportation of Water through Private tankers for NGOs Colony Sump in 23rd ward in Punganur Municipality for months of June Part and July 2020
Transportation of water to unserved areas through hire tankers connecting to Rama Rao Colony sump for period of 15 days in the month of March 2019
Providing power supply and pumpsets for 400 KL sump well at Simhadripuram village of CPWS Scheme to Pulivendula and other habitations Est.Cost of Rs.10.00 Lakhs
Supply & Installation of 75 HP pump Set at Block - B STP near GG Dam area for pumping of treated Water to sump at Kasuvu mandapam, Tirumala
Supply and delivery of submersible pump sets, with accessories connecting to Gandhi Puram Area under P&T Colony sump in 24 th Ward in Madanapalle Municipality
Providing of water Sump, wall putty painting in front elevation and SS Railing to Staircase, footpath tiles to UPHC at Muzaffar Nagar in wad no.31
Fabrication, Supply and Erection of Water Level Indicators fixing at Clear Water Sump and Back Wash and Gandhi Nagar ELSR and Fixing of Gate in NMC
Construction of Septic Tank for Toilets, Water Sump, Watchmen Room and Painting to Compound wall in Sabari Sri Rama Kshetram in Division No.34 of NMC
Construction of Sump for Rapid Filling Pumpsets at Old SS tank and Repairs to New SS tank Ramp under Summer Action Plan 2025 in Gudivada Municipality
Construction of Offtake Sluice, Pump and Sump for proposed construction of harvesting tanks 3 nos in ICAR-IIOPR, Pedavegi (V) and (M) of West Godavari District
Laying of 110 mm dia PVC Pipe Line from Janmaboomi Colony bore and weavers colony bore water supply to Ramarao colony sump in 3rdward Madanapalle Municipality
General funds 2024-25-Laying of 200 mm dia HDPE Pipeline from Durganagar colony entrance to Durganagar colony Sump in 16th ward in Chittoor Municipal Corporation.
Transportation of water to unserved areas through hire tankers connecting to Rami Reddy Layout Sump for the period of 29-09-2018 to 30-11-2018
Essential Repairs to Septic tank, Bio-medical Waste Room Shed, Sump, R.O plant shed at CHC, Challapalli in Krishna District. Est. Rs.40.00 Lakhs (2nd call)
Construction of Clear Water Sump of 500 KL (Interim dia 19.6m dia depth 3.25m) at Head Water Works compound in ward no 25 of Gudivada Municipality
CONSTRUCTION OF DRAIN SUMP SS SHELTERS MUD MOTORS FOR LIFTING DRAIN WATER AT BSNL TRAINING COLLEGE COMMERCIAL ROAD (WARF ROAD) OF 27TH DIVISION KAKINADA MUNICIPAL CORPORATION.
Providing of water Sump, wall putty painting in front elevation and SS Railing to Staircase, footpath tiles to UPHC at Shareen nagar in wad no.29
Laying of 110mm dia PVC Pipe lines 6kg/cm2 for interconnecting Bores from NLF SCHOOL & GAJJALAKUNTA to Ramarao colony Sump in 4th WARD IN MADANAPALLE MUNICIPALITY
Providing Pumping main from bore well to sump in Beach area in Pallepalem(H) of Pedaganjam GP in Chinaganjam Mandal of Bapatla District,Est.Cost.Rs.10.00 Lakhs
Supply and delivery of submersible pump sets, with accessories connecting to Gandhi Puram Area under P&T Colony sump in 24 th Ward in Madanapalle Municipality
Transportation of water to unserved areas through hire tankers connecting to Weekly Market Sump for the period of 20 days in the month of October-2019
Laying of 1000mm dia DI K7 pumping main to draw 10 MGD of raw water from KBR-I to Gajuwaka, Aganampudi Collection sump and pump house.
Providing pumping line from Bupesh Guptha Nagar Outfall Drain Sump to Chalasani Nagar DP station in 16th division Work division-III area.1st Call General Funds
Providing of water Sump, wall putty painting in front elevation and SS Railing to Staircase, footpath tiles to UPHC at Shareen nagar in wad no.29
Transportation of water to unserved areas through hire tankers connecting to Rama Rao Colony sump for the period of 16-09-2017 to 30-09-2017
Transportation of water to unserved areas through hire tankers connecting to P&T Colony sump for the period of 01-09-2017 to 15-09-2017
Shifting of SCADA (Instrumentation & Automation) from the existing location to the nearby water sump at M/s. MAG LEISURES (Radisson Blu Resort), Rushikonda, Visakhapatnam (2nd Call)
Providing 200mm Dia HDPE water pipeline from R&B reservoir ele.pole no:13w/21 to Anasagaram water tank Dr.NO:455(for improvement of water supply 1st,19th and 20th wards) in Nandigama Nagar Panchayat.
Providing water Supply for Construction of Houses in YSR Jagananna Housing colony at RS No 273/5B2 of SWLA Layout-2 opposite water tank main road at Markondapadu of Chagallu Mandal, Est.Rs.20.00 Lakhs
Providing of Cremation Platform & Shed, Construction of Water Tank & Providing Water Supply Facility and Construction of Compound wall to 19th Ward Burial Ground Utilizing of the 16th Ward Public in S.No.1/2 Extent.
Repairs and Maintenance to Fire Fighting Vehicle (Regd.No.AP31 TM 0299) with replacement of Fire Water Tank , Foam Tank and miscellaneous works etc., relating to Operation of Fire Fighting system, APIIC, APSEZ, Atchuthapuram, Visakhapatnam Dist.
Construction of CC Drains from Mangalampalli Lazar House to Rotary Water Tank in Sthupam Bazar 7th Main Road NARA CHANDRABABU NAIDU COLONY (LENIN NAGAR) 29th Ward of Piduguralla Municipality under SCC Grant 2018-19