Loading…
Loading…
3,503 results • Best match
Maintenance, Repairs and Renual of Kotha Agraharam Water Tank and its Surrounding Area in Vizianagaram Municipal Corporation Under 14th Fc 2019-20 BG (Est.cost : 24.40 Lakhs). (Guniting work and Supply, Delivery of specials)
Providing CC Road from Mangalampalli Lazar House to Rotary Water Tank in Sthupam Bazar 7th Main Road Nara Chandrababu Naidu Colony (Lenin Nagar) 29th Ward in Piduguralla Municipality under SCSP Grant 2016-17
Providing CC Road in 19th ward from water tank CC Road (H.No: 2-27/1/3) to Koyya Hotel Ahammad House (Suranna Thota) (H.No: 2-90/4/A/2) in Atmakur Nagara Panchayat
Supply and Delivery of Spare 15 HP Submersible motor and pump set, panel board, 3crore flat copper cable and fuse units to existing bore well at Ganapathi nagaram water tank in 28th ward
Providing internal CC drains and culverts from E.P.No.79/B/4 to E.P.No.79/B/10 back side of Water tank at Mutyamamba Colony (hill lock area) in Ward.No.94 (GGMP) (2nd call)
SDSTPS - 3X800 MW - Labour charges for repainting the corroded surfaces of Pipe Rack 9B from Ash slurry pump house-switch gear room to Over Head Water Tank and part of Pipe rack-9C
Providing Internal CC Road from Bukka Peddi Reddy house to OHSR new (Water Tank) at Isukachintalapalli Kotturu Village of Chakrayapeta GP in Chakrayapeta Mandal in YSR Kadapa District, Estimate Cost Rs.11.50 Lakhs.
Providing internal CC drains and culverts from E.P.No.79/B/4 to E.P.No.79/B/10 back side of Water tank at Mutyamamba Colony (hill lock area) in Ward.No.94 (GGMP) (3rd call)
Repairs & Providing of Ward Sachivalayam building at Sugali colony Community hall (east side) in 30th ward, Sugali colony community hall (north side) and Pandaripuram Water tank office in 31st ward in Chilakaluripet Municipality
Repairs & Relaying of Damaged 600 mm dia RCC UGD Sewer pipe line on Matta Samuel Road (Water tank Road) 7th Division (AE-9 Section) at Work Division-3 area.1st Call General Funds
Providing Motor for Water supply to Toilet block, Iron Grills, Flooring, Sanitary items and Electrical Supply, PVC Water Tank for 1000 Liters at Sri Jagannadha Swamy Temple, Vadali(V), Mudinepalli(M), Eluru District
Maintenance, Repairs and Renual of Kotha Agraharam Water Tank and its Surrounding Area in Vizianagaram Municipal Corporation Under 14th Fc 2019-20 BG (Est.cost : 24.40 Lakhs). (Guniting work and Supply, Delivery of specials)
Laying of CC roads at Rehabitation Colony UP, Gosala jn., (from water tank to D.No.11-170/F43/1 and D.No.11-170B/4 to D.No.11-170/20/1) in Division.No.98
Repairs & Relaying of Damaged 600 mm dia RCC UGD Sewer pipe line on Matta Samuel Road (Water tank Road) 7th Division (AE-9 Section) at Work Division-3 area.1st Call General Funds
Laying of CC roads at Rehabitation Colony UP, Gosala jn., (from water tank to D.No.11-170/F43/1 and D.No.11-170B/4 to D.No.11-170/20/1) in Division.No.98
SDSTPS - 3X800 MW - Labour charges for repainting the corroded surfaces of Pipe Rack 9B from Ash slurry pump house-switch gear room to Over Head Water Tank and part of Pipe rack-9C
PROVIDING PILOT WATER SCHEME (3.00 HP SUBMERSIBLE MOTOR, 5000 LITRES PLASTIC WATER TANK AND G.I. PIPES) AT PEDDAPALLI, WARD NO. 20, IN YELAMANCHILI MUNICIPALITY UNDER 15TH FINANCE COMMISSION GRANT 2020-21(1ST INSTALMENT)
Formation of New G.I Pipe Line Network in Harijanawada & Replacement of Old PVC Main Line Part With CI Pipes and Fittings At Gummadi Thota Water Tank in KAnuru Circle of YSR Tadigadapa Munciipality.
Replacement of existing old damaged 150mm dia AC feedermain with 200mm/160mm dia HDPE feeder main from BLG17/16, SS-59 Belagam water tank to D No.519 YKM Colony of Parvathipuram Municpality
Formation of New Gi Pipe Line NetWorking in Harijanawada and Replacement of Old PVC Main line Part with CiPipes and Fitting at Gummadi thota Water tank in Kanuru Circle of Ysr Tadigadapa Municipality.
Supply & Arrangements to Sunna Vaddi Programme ( hiring of Chairs, tables, carpet, air cooler, white sealing, Stage, Zoomers, Sofas and Others) at Kathalageri infront of Water tank, Guntakal Municipality under General Fund 2023-2024
Supply, fixing and installation of 200 LPD Solar water heater with 2 nos of flat plate collectors and suitable SS 304L hot water tank incluing provision of Backup heaters, , MS stand, hose connectors
Construction of Burrial ground cremation ,site levelling ,shed and sump to R&R Tekuru Site at P.Narayanapuram-1 (V)of Jeelugumilli (M) in West Godavari District (1/2) Sub work:Construction of Burrial ground cremation ,site levelling ,shed and sump to R&R Tekuru Site at P.Narayanapuram-1 (V)of Jeelugumilli (M) in West Godavari District (1/2)
Construction of Burrial ground cremation ,site levelling ,shed and sump to R&R Tekuru Site at P.Narayanapuram-1 (V)of Jeelugumilli (M) in West Godavari District (1/2) Sub work:Construction of Burrial ground cremation ,site levelling ,shed and sump to R&R Tekuru Site at P.Narayanapuram-1 (V)of Jeelugumilli (M) in West Godavari District (1/2)
Construction of 6 nos of Gents and 6 nos of Ladies toilets with individual OHT and Septic tank at Sabari Labour colony, SDSC SHAR
Structural Design and Construction of New Office Building (Basement plus G plus 4 including water supply, sanitary installations, Drainage, storm water drains, terrace water tanks, underground sump, levelling, internal roads and paths, compound wall, Bulk Services and External Development works etc. and Providing IEI and Fans, Street lighting, Pump Sets, Fire Fighting with Wet Riser and Sprinkler System, Automatic Fire alarm system, 13 passenger Lift, Substation, DG Set, UPS System, VRF VRV AC system, CCTV System, Grid Interactive Solar Power Plant, CCTV system, LAN networking system, EPBX system and AV system for Mercantile Marine Department at Harbour Road, Visakhapatnam
Transportation of water to unserved areas through hire tankers connecting to AV Naidu Colony Sump for the period of 29-09-2018 to 30-11-2018
Transportation of water to unserved areas through hire tankers connecting to Rami Reddy Layout Sump for the period of 29-09-2018 to 30-11-2018
Transportation of water to unserved areas through hire tankers connecting to Rama Rao Colony sump for period of 15 days in the month of March 2019
Transportation of water through hire tankers connecting to Rama Rao Colony sump for the period of 10 days in the month of July and Aug 19
Constructions of Residential Quarters for Junior Civil Judge at Kaikaluru in Krishna District Sub Work Providing septic tank and sump with pumpsets valves Borewell Dispersion trench.
Construction of Urban Primary Health Center near MR Palli Over Head tank (in the premises of Library Sump) in Ward No. 19 in Municipal Corporation, Tirupati.
Transportation of water to unserved areas through hire tankers connecting to Rami Reddy layout sump from Dec-18, Jan-19 and Feb-19 under General funds
Construction of Clear Water Sump of 500 KL (Interim dia 19.6m dia depth 3.25m) at Head Water Works compound in ward no 25 of Gudivada Municipality
Laying of 160 mm Dia HDPE Pipe line from Municipal office Sump to Old CPI colony in the town Under 14th Finance Commission Grants 2016-17
Construction of (a) Additional Underground Sump (b) RCC Storm water drain & (c) Extension of Internal Roads and Providing parking arrangements at Vidyut Soudha Compound, Gunadala, Vijayawada
Transportation of water to unserved areas through hired tankers connecting to AV Naidu Colony sump for the period of 16-7-2017 to 31-7-2017
Operation and maintenance of 4 MLD sewerage treatment plant at Bakkannapalem, Sevanagar, Kommadi K3 and Gayatri Nagar sump cum pump house for the year 2017-18
Transportation of water to unserved areas through hired tankers connecting to Rami Reddy layout sump for the period of 1-7-2017 to 15-7-2017
Providing power supply and pumpsets for 400 KL sump well at Simhadripuram village of CPWS Scheme to Pulivendula and other habitations Est.Cost of Rs.10.00 Lakhs
Supply erection and commissioning of 30 HP Open Well Submersible pump sets in Sri GT Pushkarini and other sump wells in WW II Sub Division Tirupati
Urgent Repairs to 2 No water pumpsets (open well submersible & Mono block) at water sump in the premises of Four Court building complex, Kurnool (3rd Call)
Transportation of water to unserved areas through hire tankers connecting to Rami Reddy layout sump for the period of 01-08-2017 to 15-08-2017
Constructions of Residential Quarters for Junior Civil Judge at Kaikaluru in Krishna District Sub Work Providing septic tank and sump with pumpsets valves Borewell Dispersion trench.
Transportation of water to unserved areas through hire tankers connecting to AV Naidu Colony Sump for the period of 01-08-2017 to 15-08-2017
Transportation of water to unserved areas through hire tankers connecting to P&T Colony Sump for the period of 16-09-2017 to 30-09-2017
Construction of Sump cum-pump house with motor and pumping main from old STP singhnagar to 40 MLD STP Singhnagar. (14th Finance Commission Grant) (6th call)
Transportation of water to unserved areas through hire tankers connecting to SBI Colony sump for the period of 20 days in the month of Aug-19
Transportation of water to unserved areas through hire tankers connecting to AV Naidu Colony Sump for the period of 01-09-2017 to 15-09-2017
Transportation of water to unserved areas through hire tankers connecting to AV Naidu Colony sump for the period of 16-09-2017 to 30-09-2017