Loading…
Loading…
610 results • Best match
Jointing of 10 inch dia MS pipe from Narayani sump to outside mine via highwall for monsoon 21-22 (3 delivery)
Cleaning of muck debris in sump of CHP tunnel, loading point, CHP belt in CHP area andtunnel at Churcha Mine R.O.
Work of laying, jointing of Pipeline from Bahanpat Bhatora patch sump to outside the mine towards Bhilai Bazar of Gevra Project.
Work for assistance in pump operation with minor maintenance in pump at Lower Kusmunda Zone sump at quarry of Gevra project.
Arrangement of Power supply for pumping at Narayani sump for 3.3 KV Feeder for the upcoming Monsoon 2024-25 at KOCP.
Laying and jointing of MS pipe line for dewatering activities of LK-1 Sump Lower Kusmunda Quarry of Dipka Expansion Project.
Making ground water storage sump (25000 ltr. capacity) with allied works in project office premises at Gevra Project in Gevra Area
WATER PURIFIRE, PLUMBING AND FITTING, WATER TANK, TRANSPORT, WATER TANK PLUMBING
Providing 100 mm dia G.I. water supply pipe line from over head water tank to MQ/229 with replacement of damaged branch line at Dipka colony of Gevra Area.
Weather coating, cleaning, bottom flooring, Changing GI inlet pipe 150mm dia and repair of steel railing of 3 nos OH Water Tank at Rajgamar Sub area of Korba Area.
Installation of 07 nos. of Borewell with Submersible pump and Sintex water tank at Madwadhoda Village, Banki Mongra Block-Katghora District-Korba under CSR Head of SECL, Gevra Area.
RCC Box Culvert in place of damaged steel puliya over passing nallah to approach raw water sump kumda township of Bishrampur Area.
Work of assistance in pump operation with minor maintenance in main sump of Upper Kusmunda of Dipka Unit at Quarry, Gevra Project.
Providing toe wall adjacent to OB Dump Area and gabion wall around old water sump at Baroud OCM of Baroud Sub Area
Cleaning and removal of loose coal/debris of intermediate and main sump in 4A seam at jhiria UG mine of Hasdeo Area
Pipeline work at east zone (Bahanpath and Bhatora) sump for monsoon 25-26 on as and when required basis in Gevra Project.
Jointing of 8 inch dia MS pipe from departmental coal face sump to OITDS discharge point for monsoon 21-22 (6 delivery)
Providing sump for monitoring coal muck from 10000 Te bunker of M-series including approach drain at Gevra Project of Gevra Area.
Cleaning and removal of malma/sludge of 84LW and 80D sump in V top seam at Baherabandh UG Mine of Hasdeo Area.
Regular cleaning of spillage coal /Malma below and both side of belt conveyor and cleaning of under ground sump at Nawapar U.G.Mine
Cleaning of muck debris in sump of CHP tunnel, loading point CHP belt in CHP area and tunnel at Churcha Mine (RO).
Cleaning of muck/debris in sump of CHP tunnel, Loading point, CHP belt ,in CHP area and tunnel at Churcha mine (RO).
Creation of additional sump page area towards down stream of Laxman Nallah behind East Dozer Section at Gevra Project of Gevra Area.
Custom Bid for Services - 200139380 Online Robotic Cleaning Of Ash water tank in ST I and ST II Ash handling area Similar Category Operation and Maintenance Power House/Power Plant
Installation of 06 no. of Borewell with submersible pump and sintex water tank at vijay Nagar village, block- katghora District - korba under CSR Head of SECL Gevra Area (2nd Call)
Construction of water tank for accumulation of water for LHCM near 9LN galleries in seam A at Kurja Sheetaldhara UG Mine capacity 1200m3 for period of work completion four month
Custom Bid for Services - Online Robotic Cleaning of Ash water tank in ST I and ST II Ash handling area Sipat Similar Category Operation and Maintenance Power House/Power Plant
Installation of 1 No. of tubewell/borewell with sintex Water Tank at Govt.middle School Chhuihapara,korbi Village panchayat korbi, Block-Pali, District Korba, under CSR Activities of SECL Gevra Area
Pipeline works at west zone (Forest patch, UK seam, Sadbhav patch and PnH Ralia) sump for monsoon 25-26 on as and when required basis in Gevra Project.
Cleaning of sump near TRS of Dipka Expansion Project of Dipka area. (Special terms and condition enclosed) ONLY FOR PAPS OF DIPKA AREA
Construction of underground water sump in AAI residential colony at S V Airport Raipur SH Supply of mono block and submersible motor pumps
Day to day installation and shifting of pumps and laying and jointing of pipe line at brahmaputra sump at quarry of Gevra Project.
Work of assistance in pump operation with minor maintenance in pump at Upper Kusmunda Sadbhav patch coal face sump at Quarry, Gevra Project.
Day to day installation and shifting of pumps, laying and jointing of pipe line at Bamhanpath main sump at Quarry of Gevra Project
Fabrication of fourteen number of floating pontoon (drums) by using ten nos drum for repair/ maintenance work at various sump of mine, KOCP.
Installation of 1 No. of tubewell / borewell with sintex Water Tank at Govt.Swami Atmanad Utkrishth School Chhindpur Village Panchayat chhindpur, Block- katghora, District Korba, under CSR Head of SECL Gevra Area.
SUSPENSION BRACKET FOR UNDER SLUNG WATER TANK to IS specification No. IS:2062-2011 E 250 Cu C and to ICF Drawing No. ICF/SK-6-3-461, Alt.-c/NIL
SUSPENSION BRACKET FOR UNDER SLUNG WATER TANK to IS specification No. IS:2062-2011 E 250 Cu C and to ICF Drawing No. ICF/SK-6-3-461, Alt.-c/NIL
Various capital works in Nehru Nagar R and R site/ Village such as 1) Construction of Community Hall 2) Installation of 5 Nos. borewells with Submersible Pump and Water Tanks 3) Providing 5 Nos. Dustbins and 2 Nos. Stages (Munch) 4) Construction of B
Day to day installation and shifting of pumps and laying and jointing of pipe line at forest patch sump at quarry of Gevra Project..
Day to day shifting and installation of pumps at Bamhanpath, Bhatora, Godara patches main sump of Gevra project for a period of 365 days.
Work of assistance in pump operation with minor maintenance in Bahmanpath main sump of quarry for a period of one year at Gevra Project.
Construction of A New sump (Capacity of 50,000 litre) and one pump room in the campus of Regional Office EPFO at Padari, Raipur (C.G.)
Construction of 4 Nos. Retaining Wall and One pump foundation for New Sump for LHCM at 10B(Top) Seam of Haldibari U/G Mine.
Comprehensive Development & Bulk Service for CRPF Sector Headquarter, Palaud at Raipur (C.G.) SH : C/o U.G. Sump, Pump House, Borewell & G.I. Water Supply line.
Construction of Bicycle stand and providing 01 No. of 2000 L Sintex water tank at Government Middle School, Binjhra (Vijaynagar) Village Panchayat-Dhurena, Katghora, Korba under CSR Head of SECL, Gevra Area
Painting of 02 (Two) Nos. of Over Head Tank (OHT) and Fencing around Pump House near TA Office of VVC, SECL, HQ, Bilaspur.
Laying and jointing of 10 Inch dia MS pipe line between Amgaon lower Kusmunda Sump to pump house no. 1 at quarry of Gevra Project..
Day to day installation/ shifting of pump and pump related work at main sump of lower Kusmunda of Dipka Unit at quarry of Gevra Project.
Work of assistance in pump operation with minor maintenance in UK Sadbhav main sump of quarry for a period of one year at Gevra Project.