Loading…
Loading…
610 results • Best match
Laying and jointing of 10 inch dia MS pipe line from bamhanpat main sump to outside discharge of the mine at quarry of Gevra Project..
Malma cleaning, removal of debris from main sump in 5D/10L in 10B seam of 7/8 Incline at Rajnagar RO Colliery of Hasdeo Area
Making of drain along main riding from -46L to -32L/14R fo drainage of water towards -32L sump in 4A seam at Jhiria UG Mine.
Day to day shifting and installation of pumps at East Zone (Bahanpat, Bhatora, 522, Brahmaputra) sump of Gevra Project for a period of 365 days.
Assistance required for maintenance of pipe line for dewatering of 5LW sump for clearance of Shivpur approach-route from West Block of Churcha Mine (RO).
Construction of 500 Bedded girls hostel G plus 3 i.c. future vertical extension upto G plus 6 building UG sump, boundary wall at NIT, Raipur.
Supply of drinking water to various OHT by running operation of submersible pump at GM office Dipka Area. (For a period of 02 years)
Augmentation of Water Treatment Plant to improve quality of water at BMY Settlement (The Augmentation Work shall primarily involve Construction of 01 nos. R. C. C. Overhead Raw Water Tank of capacity 2,27,000 litres, Construction of 01 nos. R. C. C. ... Filtered Water Tank of ...
Making 2 Nos of temporary Pumping shed at main sump and coal face near at Parsodikala patch at Amera OCP of Bishrampur Area For Monsoon preparation
Shifting, laying, jointing of MS pipes of 10 inch dia. for LK1 sump for dewatering activities of Dipka Expansion Project within a period of 90 days.
Work of Assistance in pump operation with minor maintenance in pump at Bamhanpath main sump at Quarry of Gevra Project for a period of 365 days.
Jointing of 8 inch dia MS pipes from Narayani sump to 25 no. coal stock via high wall for Monsoon 22-23 (3 delivery) at KOCP
Diversion and shifting of 6.6 KV HT overhead line feeder no. 60 at KCC chowk for supplying power to Old Dipka Sump at Dipka Expansion Project.
Work of assistance in pump operation with minor maintenance of HT pumps installed in sump between TA pond and Sadbhav dumping at Dipka Unit, Gevra Project.
Providing and fixing water tank covered by red sand stone slab at residential building (Type A,B,C) to protect entering of bird, snack etc at Urja nager and Shaktinagar township Jarhi of Bhatgaon Area.
Installation of 04 Nos. Bore well with water tank for Dhurena and madwadhora Village and Community Toilet with 02 Nos. Dust Bins at Vijay Nagar and Ganga Nagar Village Under CER Head at Gevra Area
Cleaning of Malma and muck debries from incline no. 01, incline no. 02 and sump of Ketki Under Ground mine of RGK Sub Area of Bishrampur Area.
Preparation and cleaning of 34LS/-1Dip sump area in Seam A at Kurja UG Mine quantity of work 5048.96m3 and time period. of work is six month.
CONSTRUCTION OF 50 KLD CAPACITY HIGH LEVEL RESERVOIR (OVERHEAD TANK) 15 METER STAGING NEAR JALSAN TALAB WARD NO. 05 KURUD
Overhauling of pressure filter and maintenance work of shed and boundary wall, dismantling of old structure, surface dressing and cleaning of water tank of pump house of old CHP of Dipka expansion project of Dipka Area
Construction of 1 No RCC underground water tank of 270000 litre capacity at 77D/71L for supply of clean water under pressure to CM panels in V-Top seam at Baherabandh UG Mine of Hasdeo Area.
Strengthening of coal transportation road from the junction of weigh bridge No. (19 and 20) towards NCC Sump No. (2) junction at KOCP of Kusmunda Area. (Re-Tender)
Providing, laying and fixing rain gun sprinkler around coal stock yard and along main road from MIL Sump to State Highway Road at Jampali OCP of Raigarh Area
Work of Day to day shifting and installation of pumps at West Zone sump (PnH, Forest Patch, UK Sadbhav) of Gevra project for a period of 365 days.
Day to day installation and shifting of pumps and laying and jointing of pipe line at sadbhav patch no. 1 (hardibazar side) sump at quarry of Gevra Project..
Shifting, diversion, extension of pipeline arrangement from Old Dipka quarry sump to Chandni Chowk junction by laying and jointing of pipeline for dewatering purposes at Dipka Expansion Project.
Supplying and placing of OB sand filled cement bags along rain cut beside roads, embankment, pumping sump at Amgaon OCP for monsoon preparation of Bishrampur Amgaon Sub Area
Supplying and placing of OB/ sand filled cement bags along rain cut beside roads, embankment, pumping sump at Amgaon OCP for monsoon preparation of Bishrampur Amgaon Sub Area.
Extension and diversion of delivery pipelines and installation / re-installation of Pump Sets etc. for dewatering activities at LK-2(B) Sump of Quarry of Dipka Expansion Project.
Supplying and placing of OB sand filled cement bags along rain cut beside roads, embankment, pumping sump at Gayatri UG mine for monsoon preparation of RGK Sub Area.
Installation of 01 No of Tubewell/ Borewell with Submersible pump at near OHT Gevra Basti Village, Block Katghora District Korba under CSR Head of SECL, Gevra Area.
Regular operation of pump, mixing, dozing of oil and grease trap at ETP and cleaning of slurry from sump in excavation workshop of Dipka expansion project of Dipka Area
Preparation of sand bag for protective work i.e. making temp. Retaining wall and temp. sump for CM panel at 10B (Top) and 4A (Bottom) seam at Haldibari Ug Mine.
Pipeline work in Central patch (522,107, Godhara and LK central) Sump on as and when required basis of quarry section at Gevra project for a period of 180 days.
Drilling of 01 No. Boreholes from surface to UG in 37L/40D from surface to underground near sump at Rehar UG Mine of RGK Sub Area of Bishrampur Area
Comprehensive development and bulk service for CG, CRPR, Arang Raipur C.G. SH: Construction of UG Sump, pump house, borewell and Miscellaneous work for 59 Nos. Qtrs. at Plot B.
Overhauling of pressure filter and maintenance work of shed and boundary wall, dismantling of old structure, surface dressing and cleaning of water tank of pump house of old CHP of Dipka expansion project of Dipka Area (Re-tender)
ADDN/ALTN TO OFFICE ROOM NO 305, ROOM NO 205, BLDG NO 077, PROVN OF SECURITY GRILL FOR WATER TANK AND REPAIR/REPLACEMENT OF FLOORING PANELLING AND TOILET OF OL BRANCH INSIDE VIJAY DURG UNDER GE(VD) KOLKATA
Installation of 01 no. of Tubewell/ Borewell with Submersible pump near OHT Gevra Basti Village, Block-Katghora District-Korba under CSR Head of SECL, Gevra Area. (2nd call)
Assistance in pump operation with minor maintenance in pump at old Dipka CHP pond and Ralia side patch sump at Quarry of Gevra Project for a period of 365 days.
Day to day shifting and installation of pumps at LK Zone (LK1 And LK2) sump as and when required basis in the Gevra Project for a period of 365 days.
Placement of OB/ sand filled cement bags near pumping sump, River side barrier and along road side to prevent rain cut at Amera OCP for monsoon preparation of Bishrampur Area.
Providing Gabion pedestal for supporting the mine water discharge pipeline from LKSM to West MTK and 522 sump to near Laxman workshop discharge point at Gevra Project of Gevra Area
Preparation of UG Sump at main dip 40L/1D for dewatering of waterlogged area in proposed depillaring panel 39LN and 34LN(LHCM panel) in seam A at Kurja UG Mine.
REPAIRS TO FLOORING, ROOFING, SANITARY FITTINGS, PLASTERING, PLINTH PROTECTION, CEILING, CLEANING OF WATER TANK, NECESSARY PLUMBING WITH FITTINGS AND OTHER MISC B/R WORKS AT CQA(I) RESIDENTIAL AND TECHNICAL AREA RAIPUR DDN UNDER GE (I)(P)(FY) KANPUR
Hiring of 05 No 10 wheel truck chassis mounted mist blower fog cannon along with min. 25 KVA DG Set and 12 KL Water Tank and suitable no of nozzles...for 3 years...for Chhal OCP, SECL, Raigarh Area
EPAIRS TO FLOORING, ROOFING, SANITARY FITTINGS, PLASTERING, PLINTH PROTECTION, CEILING, CLEANING OF WATER TANK, NECESSARY PLUMBING WITH FITTINGS AND OTHER MISC B/R WORKS AT CQA(I) RESIDENTIAL AND TECHNICAL AREA RAIPUR DEHRADUN UNDER GE (I)(P)(FY) KAN
Work of day to day installation/ shifting of pump and other related work for working pumps and dewatering the sumps of LK Amgaon main sump of Gevra Project for 365 days.
Transportation of 04 Nos. HT Pumps, Motors , Starters (from UG to surface and surface to UG) and Installation of 02 Nos. HT Pumps (1000 GPM) in main sump, Kurasia UG Mine.
Extension and diversion of pipe line by welding and laying of 10 inch X 6 mtr M/S Pipe towards NCC sump for dewatering of existing water for mining activity KOCP