Loading…
Loading…
610 results • Best match
Day-to-day works for shifting of pump motor sets with extension/shifting of pipelines by dismantling, shifting, laying and jointing works and other associated works related to Old Dipka quarry sump on as and when required basis at DEP.
(i)Erection of temporary stopping by old reject conveyor belt in 25ALS/30LSLHCM panel (ii) Preparation of intermediate sump for proper dewatering. (iii) Laying of pipe line etc. in dep. Panel 25ALS/30LS (v) Cleaning and removal of blasted materials
Making of 03 nos. Rest Shelters and 03 nos. Starter Panel sheds for various sump locations for pump section along with Fabrication and Erection of enclosed rainshed for housing of lighting transformer and LT distribution panels at quarry of DEP.
Guarding of pontoons (10 nos.) with railing works, toe guard, fencing of pontoons installed at various sumps of quarry and pragati nagar pond with chain link wire mesh, walkway works on pontoons and painting of pipelines near sump area at DEP.
Dewatering and desilting of LHS 16 Nos. (BK 27, 29, 30, 31, 37, 39, 41, 43, 44, 46, 47, 52, 54, 55, 58, 60) approach road sump of LHS for the period of two years under the jurisdiction of ADEN/Pendra.
Custom Bid for Services - AMC of Water Treatment Plant, RO and Cleaning of Overhead Tanks Similar Category ANNUAL MAINTENANCE SERVICES FOR WATER PURIFICATION AND CONDITIONING SYSTEM (Version 2) Customized AMC/CMC for Pre-owned Products Cleaning, Sanitation and Disinfection Service - Outcome Based
construction of Sump Well 1.5 MLD In ward 12
construction of sump well at BTI chowk ward 01
Transportation of high head pump (1000GPM), Motor, Starter and new pipes from surface to underground and laying of pipeline from surface to 38LE/7D of 40LE sump and Installation of pump, Motor and Starter including foundation work at 37LE/7D at Dhl
Handling, Transport and Other Mining Services - Percentage quote based - Proposal for Monsoon preparation Sump Cleaning in Underground at 56LW Sump in top SeamV of Jhilimili Mine
Day-to-day works for shifting of pump motor sets with extension/shifting of pipelines by dismantling, shifting, laying and jointing works and other associated works related to LK-2 quarry sump on as and when required basis at Dipka Expansion Project.
Erection of temporary stopping by old reject conveyor belt in 39LN and 34LN LHCM panel (ii) Preparation of intermediate sump for proper dewatering. (iii) Shifting of pump along with pipe line. (iv) Laying of pipe etc. in dep. Panel 39LN and 34LN
Regular cleaning of spillage coal Malma below and both side of belt conveyor and cleaning of U.G.Sump at Shiwni U.G.Mine.Location TB-1 Belt TB-2 Belt TB-3belt TB-4 Belt 99 L belt 28D belt 108 L belt 12D 96L Sump.
Dust Suppression by Truck Mounted Tankers (Minimum 9/12/15/18 KL capacity) on Coal Transportation Roads from junction near 223 sump towards Bahanpath LK Patch (NIT 413 face) and towards Bhatora Naraibodh LK-UK Patch (NIT 522 face) at Gevra Project of
Assistance in shifting of pump motor sets, extension/ shifting of pipelines, laying and jointing of pipelines and other associated works related to day to day activities at LK-1 and Old Dipka sump quarry for a period of 180 days at DEP.
Day-to-day works for shifting of pump motor sets, extension/ shifting of pipelines, laying and jointing of pipelines and other associated works related at Old Dipka quarry sump on as and when required basis for a period of one year at DEP.
shifting of Pump 3000 GPM coupled with 425 HP Diesel Engine - 2 Set with pipe line and accessories, starters etc. pump station / sump and installation of pump sets, laying of pipe line with making bends , Nipple etc form Pump station to discharg
Day to day works of installing / shifting of pumps and other related works of working pumps and dewatering of WEST ZONE like Forest Patch, Old Dipka Unit, Sadbhav and UK seam sump at quarry of Gevra project for a period of 365 days.
Work of deployment of 01 no. vehicle mounted mobile lighting tower with smart and silent D.G. set and with (280 x 4 no) LED flood light/ equivalent with 8m or above height telescopic tower for illuminating Bhathura OB face above 223 sump GP.
Transporting, flange welding, shifting, laying and fitting of three range 3 x 2200 RMT of 6 inch dia M.S. pipe line from the main sump of Rahadih Quarry to Budbud quarry patch and 1200 RMT of 4 inch dia M.S. pipe line
(i) Erection of temporary stopping by old reject conveyor belt in -16LS and -23LS LHCM panel (ii) Preparation of intermediate sump for proper dewatering. (iii) Shifting of pump along with pipe line. (iv) Lying of pipe line etc. in dep. Panel -16LS
Day-to-day works for shifting of pump motor sets with extension/shifting of pipelines by dismantling, shifting, laying and jointing works and other associated works related to LK-1 quarry sump on as and when required basis at Dipka Expansion Project.
Dewatering and desilting of LHS 15 Nos. (BK 06, 09, 10, 11, 12, 13, 15, 17, 18, 21, 24, LHS-356, 359, 366 and 365) approach road sump of LHS for the period of two years under the jurisdiction of ADEN/Central/BSP.
Handling, Transport and Other Mining Services - Percentage quote based - For sump cleaning in underground at 12D 27LE and 22D 57L sump in seam II of Pandavpara Mine
Transporting, welding, shifting, laying and fitting of 8 inch M S pipe line for discharging the mine water from sump to surface and within the mine along with the diversion of pipe due to shifting of mine working as per need of mine during monsoon.
Sump cleaning in UG at seam-C and seam-D transportation and installation of one HT pump (1000GPM) in seam A and seam D and transportation of pipe from surface to UG in seam C and seam D at Bijuri Colliery of Hasdeo Area.
Day-to-day works for shifting of pump motor sets, extension/ shifting of pipelines, laying and jointing of pipelines and other associated works related at Lower Kusmunda-1 (LK-1) quarry sump on as and when required basis for a period of one year.
Day-to-day works for shifting of pump motor sets, extension/ shifting of pipelines, laying and jointing of pipelines and other associated works related at Lower Kusmunda-2 quarry sump on as and when required basis for a period of one year at DEP.
Transportation and Installation of 1000 GPM pump with motor at 1Dip/84 L Main Dip Sump including transportation, laying and joining of 6 inch delivery pipe line from 1Dip/50L to 1Dip/84L and 50L East district in Seam 1 combined (Top Seam) at Gayatri
Construction of 24 Nos. Residential Quarters (12 Nos. type III and 12 Nos. type-IV) with 01 lakh litre UG sump, parking shed, development works and E&M services for NIBSM at Baronda, Raipur (C.G.). SH:- Providing of DG set, panels, earthing, cable laying etc.
Construction of CC road from water tank CTPT to punit nishad house at ward no 02 arang
Construction of (i) permanent First aid station at every 500m interval , rest station at 67/80D-81D and 94L/80D-81D and UG office at 100L/80D-81D in, (ii) 12Nos. RCC Retaing walls 3No at entrance of 96LE panel to construct sump and 3 each after
(A) Transportation and laying of Two nos. complete pipelines of 6 inch dia. 1500 mtrs. length each from Kurasia 5th Seam Main Sump to NPH (B) Repairing of 6 inch dia. old pipes by replacement with new pipes and dismantling of old pipes of Kurasia UG
(i)side dressing and cleaning of gallery along 78D from 48L to 101L for laying of GI pipeline for CM operation (ii) construction of 2No RCC pillers at 68L/81D (iii) Cleaning and removal of malma/sludge of 76D/104L and 82D/107L sump (iv) Cleaning
Shifting of existing Pump 3000 GPM coupled with HT Motor-2 Set with pipe line and accessories, starters etc. from existing sump to New sumps and installation of pump sets, laying of pipe line with making 8 inch bends, 8 inch Nipple etc form new Pump
Day-to-day works for shifting of pump motor sets, extension/ shifting of pipelines, laying and jointing of pipelines and other associated works related to (LK-2E and LK-2W) quarry sump on as and when required basis for a period of one year at DEP.
Tricycle or Rickshaw for Carrying Goods (Q3) MSE Exemption for Years of Experience and Turnover
Composter for Solid Waste Management (Q3) MSE Exemption for Years of Experience and Turnover
Stable Bleaching Powder for Household and Industrial use (V3) conforming to IS 1065 (Part 1) (Q3) (3 (3 ))
Electronic Weigh Bridge (Without Civil Work) (Q3)
Fog or Mist Generators (Q3)
Portable RO Plant For Haemodialysis (Q3)
Outdoor Twin Waste Bin (Q3) MSE Exemption for Years of Experience and Turnover
E - Cart for Garbage (V2) (Q3) MSE Exemption for Years of Experience and Turnover
Hopper Tipper Dumper for Garbage (Q2)
Deltamethrin ULV as per IS 15227 (Q3)
Malathion 25% WP (Q3)
Custom Bid for Services - Installation shifting of diesel engine pumps LT pump motor sets on pontoon or surface as per requirement including day to day pumping operation sump coal face for dewatering of quarry at Ambika OCP for 120 Days Similar Category Operation And Maintenance Of Electro-Mechanical Installations
Custom Bid for Services - Dust Suppression by Truck Mounted Tankers Minimum 9121518 KL capacity on Coal transportation road from Control tower via E1 to Y Junction of 223 sump of Gevra Project of Gevra Area Similar Category Hiring of Special Purpose Mining or Earth Moving Machines (Shift Based)
Handling, Transport and Other Mining Services - Percentage quote based - Malma cleaning of Sump Twelve East Panel located in Masan Combined Seam to enhance capacity of sump at Shiwani UG Mine under Bhatgaon Area