Temporary pump house shed at sump for mine water dewatering at Saraipali OCP under korba area.
Providing two numbers pump shed near sump in mines of Dipka expansion project of Dipka Area
Malma Cleaning, removal of debris , silt from sump Sector A (Extension)/Sector-F at Rajnagar OCM.
Work of Pipeline at Old Dipka Sump of Gevra project for a period of 180 days.
Cleaning of Main Sump in 4A Seam (Quty.9297.63 in 5/6 Incline at Rajnagar R.O.Colliery
Making 3 Nos. pump foundation beside sump at various location at Gevra Project of Gevra Area
Extension of existing feeder 6.6 KV HT Overhead line to supply power for pump operation of upcoming monsoon 2026-27 due to shifting of sump locations (LK-1 and Old Dipka Sump) at Quarry of Dipka Expansion Project.
Providing RCC water tank of capacity 50000 litres and 25000 litres for mobile crusher near tanker at Dipka expansion project of Dipka Area
Providing two Nos. Tube well near ground water tank of silo of new CHP of Dipka expansion project of Dipka Area(Re-tender)
Installation of 01 no. of Tubewell/Borewell with Submersible pump and Sintex water tank at Birda R and R site of Gevra Area
Cleaning, maintenance and painting of 03 Nos Over Head Tank and 04 Nos Underground Sump.
Sump cleaning in U/G at Seam-A and Seam-C at Bijuri Colliery of Hasdeo Area.
Cleaning of debris/malma along gallery of intermediate sump in UG in 4A seam of W.JKD. Colliery
Construction of 10 nos. Sectionalisation Stoppings Near 84L Sump Area in East block of churcha mine RO
Providing pipe line, sump and pump house for fire fighting system at Regional store of Gevra Area.
Cleaning and removal of muck/debris of 23L Main sump of 10B seam at Haldibari UG Mine.
Cleaning and removal of muck/debris from 23L sump at 10B (Top) seam at Haldibari UG Mine.
Cleaning and removal of muck/debris of 23L main sump of 10B seam at Haldibari UG Mine.
Cleaning of coal slurry/debris from UG sump(using for settling of water) at West JKD Colliery
Cleaning of muck from 43LE main sump in seam 0 at Rehar U/G mine Bishrampur Area.
Laying /jointing of MS pipeline and installation of Pump Sets etc for dewatering activities from LK-2A Sump and TRS Sump to discharge point or any other suitable location as per requirement during up-coming monsoon of Dipka Expansion Project.
Shifting, diversion, extension and rearrangement of pipelines from Sri Ram Dumping to LK-1 quarry sump and laying of one pipeline from sump to below neem vatika road crossing area by dismantling, handling, laying and jointing of pipeline at DEP.
Facility Management Services - LumpSum Based - Industrial; Assistance in pump operation with minor maintenance in JK Pond UK Sadbhav main Sump and Brahmaputra main sump at Quarry of Gevra project for a period of 01 year; Consumables to be provided by..
Electrical portion of works "Construction of 20 unit Type-II,6 unit Type-III,10 unit Type-IV Quarters, Service buildings, ADEN, ADEE,ADSTE & ARM offices and Officers Rest House, Overhead Tank, Pump House, RPF Barrack and other miscellaneous work" at Baikunthpur Road(BRH)
Electrical portion of works "Construction of 20 unit Type-II,6 unit Type-III,10 unit Type-IV Quarters, Service buildings, ADEN, ADEE,ADSTE & ARM offices and Officers Rest House, Overhead Tank, Pump House, RPF Barrack and other miscellaneous work" at Baikunthpur Road(BRH)
Providing Shed over the Water Tank and cement concrete pavement of HEMM washing area at Excavation Workshop of Dipka Expansion Project of Dipka Area.
Installation of 02 Nos. Deep Bore Hole with Submersible Pump and Water Tank for Aadivashi Hostel/ Ashram Hardibazar under CSR Head of Gevra Area
PRESSURE FILTER (210 LPM) WITH CLEAR WATER TANK(85000 Ltr) AND PUMP HOUSE AT GAYATRI UG MINE OF RGK SUB AREA OF BISHRAMPUR AREA
Cleaning of packed malma / slurry/debris from sump of old pillars in 5A seam at West JKD Colliery.
Work of day to day shifting and installation of pumps at Bamhan path main sump of Gevra Project.
Making temporary sump by stone pitching, Gabion baffle walls along L series at Gevra Project of Gevra Area.
Cleaning of 5Dip sump in 10B seam in 7/8 incline at Rajnagar RO Colliery of Hasdeo Area.
Desilting of part of JK pond for enhancing retaining capacity of sump at Gevra Project of Gevra Area
Making temporary sump by stone pitching, Gabion baffle walls along L series at Gevra Project of Gevra Area.
Arrangement of delivery pipelines of 8/10/12 inch dia. For dewatering of Barkutta sump at Kusmunda OCP.
Cleaning of culvert and sump near TRS of old Dipka mine of Dipka expansion project of Dipka Area
Cleaning of debris /malma/Coal slurry along gallery of main sump in UG in 5A Seam of W.JKD.Colliery
Sump cleaning in UG at seam A, seam C and seam D at Bijuri Colliery of Hasdeo Area
Cleaning of mud/mulma at main sump of in No. V Seam of NCPH Colliery R-6 Mine.
Work of Pipeline in west zone (Department UK, department E and F, Forest Patch, JK Pond, Khusrudih, Old Dipka Sump) and LK zone sump on as and when required basis of quarry section at Gevra project for a period of 180 days.
Construction of sedimentation tank and clean water tank with installation pressure filter for CM work in Pandavpara Mine at Jhilimili Sub Area of Baikunthpur Area
Providing 08 Nos of water tank for trolly mounted fixed type fog Canon at different place of Bhatgaon Area and Jagannathpur OCP under Bhatgaon Area.
Covering of top of raw water tank, aeration tank with G.I. sheet and painting work at filter plant of Domnara colony of Chhal sub area
Installation of 01 no. of Tubewell/Borewell With Submersible pump and Sintex water tank at Birda R and R site of Gevra Area (2nd call)
Cleaning, removal of muck/debris from 0L and 34L sump in UG of 4A seam at Haldibari UG Mine.
Making temporary sump by stone pitching, Gabion baffle wall along L-1 series at Gevra Project of Gevra Area
Re-support of inspection route of water dam and near sump galleries in No. V Seam of Kurasia Colliery.
Diversion of 3.3 KV OverHead line to new Area of Sump No.2 at Amgaon OCP of Bishrampur Area.
Cleaning and removal of muck/ debris from 0L Main sump in UG of 4A seam at Haldibari UG Mine
Assistance for Cleaning of sedimentation chamber/ sump / nozzles and other pump related work of CHP, KOCP for 360 days.