Loading…
Loading…
2,251 results • Best match
REPAIR/CLEANING OF WATER SUPPLY OH WATER TANKS, UG SUMPS, TANKS AND REPAIR/MAINT OF EXTERNAL MAIN PIPE LINES AT MH NAMKUM AND KHOJATOLI UNIT AREA UNDER GE RANCHI
Departmental Estimate for the work- Reorganisation and Extension of 3.3 KV overhead line at due to extension of A. CRE Sump, B. Main Sump and C. EKG face under AKKOCP, BnK Area.
Dismantling, transporting and installation of one set of pontoon with 3000GPM pump motor set from main patch sump to Jarlahi sump and erection of its pipe line at Phularitand under AMP Colliery.
Shifting of 4000gpm pump of SOCP coal face sump and replacing of B D 2nd 4000gpm pump of SOCP coal face sump and 2000gpm pump of MOCP pumping face of Muraidih Colliery
Shifting of 8inch dia pipeline from one side to other side (clear along haul road) for the smooth dewatering from the departmental patch sump ner 12 no. sump in respect of AADOCM
Laying of 8 inches additional pipe range at new eastern side sump for continuous dewatering sump water in order to extract OB/Coal from 3rd-4th seam under JOCP under HZB Area
Lowering of 3nos of HT pump 02 nos 4000gpm pump and 1no 2000gpm turbine pump motor set of 3rd patch sump due to decreasing of water level and shifting of 2 nos of HT pump of MOCP Jharna sump in east side of the sump and erection of their pipe line fo
Re-Organization/extension of 3.3KV and 220 V oh line due to advancement of 02 nos of departmental shovel, pump running at mid sump and main sump in respect of AKKOCP, BnK Area.
Laying and fixing of 6 inch and 8 inch MS/GI pipe in Sump No. 04 and newly created Sump No. 01 for dewatering and firefighting in respect of Rohini Project, NK Area
COMPLETE DISMANTLING/INST ALLATION OF 2 NOS PUMP MOTOR SETS(1)10 INCH LAKARKA DELIVERY and WEST SUMP (2) 6 INCH DELIVERY EAST SUMP FIRE FIGHTING LINE OF AKWMC OCP UNDER KATRAS AREA
Extension of 6 inch and 8 inch dia MS pipelines at Sump no. 03, Jehlitanr for operation of 1000GPM and 2000GPM pumps on platform at Sump No. 03 under KDH OCP, NK Area.
Dismantling, erection and extension of Pole and 3.3KV OHTL for supplying power to Shovel No. 03 and 05 and pump at Coal face sump and 32 No. sump under Dakra Project, NK Area
SPL REPAIRS/REPLACEMENT OF LIGHTENING PROTECTION SYSTEM FOR MRS, SPL REPAIRS TO COOLING APPLIANCES , SPL REPAIRS/REPLACEMENT OF CABLE AND CONNECTED ACCESSORIES NEAR OVERHEAD TANK OF OFFR MESS AND PROVN OF AC FOR NEW EXCHANGE IDSR GE DIPATOLI
Changing of seal kit of Bucket cylinder and Rep. of damaged reserve water tanks pre-cleaner and muffler assly. of Tata Hitachi Shovel, Exc-2961 of Govindpur Ph-II OCP.
Vertical Sump Pump with motor accessories as per specification attached for clarifier area. (Q3)
Vertical sump pump with motor accessories for leach pit as per specification attached. (Q3)
Construction of chatt ghat at Nirsa OCP near sump under Lakhimata Group of Mines.
INSTALLATION AND DISMANTLING OF PUMPS AT WEST SUMP AT AKWMC OCP UNDER KATRAS AREA
Repairing of guard wall at top periphery of sump near Lohandia basti under ROCP.
Assistance in operating pump and maintenance from Lalghutua sump for filtration plant at Lalmatia.
Part repairing of 2000 GPM pump installed at main sump under Konar Exp OCP
Repairing of BHM and CD dilute pump sump cover structure of Dugda Coal Washery
Repairing and Heightening of sump wall of water filling point under ROCP.(2nd call)
Fabrication of three nos of pontoon at different sump of AADOCM project Dhori Area
Assistance in operating pump and maintenance from Lalghutua sump for filtration plant at Lalmatia.
Urgent providing pump foundation at main sump of 4TB quarry of KOCP, Hazaribagh Area
Sump pump dismantling / overhauling and refitting at different place inside Moonidih Coal Washery premise.
Repairing of boundary wall, sump and pump house of loyabad dispensary under sijua area
Repair and maintenance of different capacity sump dewatering and firefighting pumps of Sirka Colliery
Emergency work in Quarantine Centre (Covid-19) of Pipe Line and water tank fitting at VTC, Sudamdih under E.J. Area.
Construction of Deep boring Solor power with water tank in momin tola in Bhatbhanga Santhali panchayat, block - taljhari , dist - sbg
Providing and fixing PVC Water Tank, laying of UPVC pipe and misc. sanitary fittings at different places under Barora Area
Cleaning and removing sluge, silt etc from drain near water tank, pump house, Administrative building and control room under RCHP.
Providing and fixing of water tank for R.O water connection in CISF colony under GM unit A-C Area, CCL
Providing water tank and repair of Toilet and better drainage facility at Ajay Atithishala under Kargali OCP of BnK Area
Dismantling and errection of existing over head street lighting line from DAV to water Tank location, Prem Nagar, GRD Project.
Renovation of water supply pipe line , water tank and dismantling of damage structure behind camp at PCW under EWZ Area
Repair of Water Tank Platform to the Qtr No. M-76 situated at Birsa nagar under Rohini Project, NK Area.
Construction of RCC Drain at Kadru Basti (Madrasa Gali) from Water Tank to mumtaj alam house under Ward No- 43
Making toilet septic tank water tank and providing PCC at campus of chandor basti Anganwari Kendra Tetulmari under Sijua area
FENCING AROUND WATER TANK AT FILTER PLANT AND REPAIRING CROSS OVER CULVERT FOR CABLES NEAR SUB STATION UNDER WJA, MOONIDIH
LEAKAGE REPAIRING OF 4 INCH PIPE NEAR WATER PLANT GTC AND NEAR WATER TANK GTC AT AGKCC UNDER KATRAS AREA
Repairing of roof of quarter no E131 to E170 along with common water tank at Basudeopur colliery under Sijua area
Providing and laying 50mm dia pvc pipe line from water tank to putkee colony at Loyabad colliery under Sijua area
REPAIRING OF WATER SPRYING PIPE LINE AND LEAKED WATER TANK OF HM1035 WATER TANKER SL NO 291 OF KDH PROJECT
Repairing of damaged water tank utilized for water supply and sprinkling of all roads KKC Link siding under Barora Area.
Water Sprinkler Application Mounted on Water Truck Cabin Truck with Water Tank Bidder Turnover (Last 3 Years) 5 Lakh (s)
SPL REPAIR TO OHT TANK NO 04 AT DIPATOLI POCKET UNDER GE DIPATOLI
Repairing of Prabhu Make 3.3KV DOL starter, CTR-200-100/5A, Sl. No-132 installed at face Sump which is controlling of 1000 GPM pump at face sump of Topa Project under Kuju Area.
Three times shifting of 02nos.of 4000GPM HT pump (as and when required) in lower side of the sump due to decreasing of water level of 3rd Patch and Jharna sump of Muraidih AMP Colliery.