Repairing /overhauling and refitting of damaged two nos. Sump-pump and rectification/repairing of its wornout /damaged delivery pipe at Mohuda Coal Washery.
DIVERSION OF OVER HEAD LINE 6.6 KV FEEDER NO. 2 NEAR AMPL VIEW POINT TO WEST SUMP AT AKWMC OCP UNDER KATRAS AREA
Repairing of 3.3KV, DOL Starter of 1000 GPM, Make Mineline, Sl. No. Missing installed at 32 No. Sump under Dakra Project, NK Area
DISMANTLING , LOWERING , STACKING AND TRANSPORTATION OF 8INCH/6INCH VERTICAL DELIVERY OF AMPL VIEW POINT AND WEST SUMP AT AKWMC OCP UNDER KATRAS AREA
Providing and fixing of 6 inch dia flange for laying the pipeline for dewatering the departmental quarry old sump west side. Coal face
Re-handling of spilled raw coal/slime behind tail drum of 133A and B to RGB sump of Pre-Washery at Kedla Washery
Shifting/installation of 02 no 1000 GPM and 01 nos 2000 GPM at 3P quarry sump in r/o SDOCM Project, Dhori Area.
Supplying and fixing of tyre coupling set and coupling bolt for running pumps at mine sump of Tapin South OCP under Hazaribagh Area
DIVERSION OF 6INCH DELIVERY OF 77 PUMP 200 METER ALONG WITH PUMP SET AND ELECTICALS AT WEST SUMP AKWMC,OCP UNDER KATRAS AREA
Repairing of 3.3KV DOL starter Sl. No. missing, Local Sl. No. 04 at A Block (Khilawan Dhaura) Sump under GM Unit, NK Area.
ERECTION OF 6.6 KV OVER HEAD LINE DUE TO FACE ADVANCEMENT AND NEW ROAD MAKING OF AMPL SUMP AT AKWMC UNDER KATRAS AREA
ERECTION OF 3.3 KV OVER HEAD LINE BELOW AMPL HAUL ROAD FORWARDS WEST SUMP FOR OPERATION OF PUMPING AT AKWMC OCP KATRAS AREA.
Repair and maint of 3.3KV OH line feeding power from Karipani sub-station to Karipani main sump pumping station in r/o SDOCM
Shifting 4000GPM and 2000GPM pump west coal face sump with delivery diversion as per installation place at 1T coal face under ABOCP Mine
Cleaning of In-take well sump, providing approach ramp and connection of pipeline with VT Pump at IWSP under GM Unit BnK Area
WELDING OF FLANGES N 250 NOS 6INCH PIPES FOR NEW 6INCH DELIVERY Kumari Jore to west sump of AKWMC OCP UNDER KATRAS AREA
Transporting, laying and fixing of 8 inch dia. Pipe for newly decided sump for dewatering of Departmental patch in respect of Rohini Project.
DIVERSION OF OVER HEAD LINE 3.3 KV BELOW AMPOL VIEW POINT TOWARDS WEST SUMP FOR OPERATION OF PUMPS AT AKWMC UNDER KATRAS AREA
Cutting of sand mixed earth for raw water channel and sump near damodar intake well point under Jarangdih colliery. (8 times a year)
COMPLETE REWINDING/REPAIRING OF 400 KW/3.3KV/1491 RPM INDUCTION MOTOR SR.NO.3E 33100612 MARATHON MAKE INSTALLED AT OCP SUMP, AKWMC UNDER KATRAS
Shifting 4000 GPM and 3200 GPM pump west coal face sump with delivery diversion as per installation place at JOCP under ABOCP Mine
Erection of new 3.3KV Overhead line from shatabadi substation to main patch sump of leftout patch B of AMP Colliery under Barora Area.
DIVERSION,SHIFTING AND EXTENSION WITH REINSTALLATION OF 10INCH. DIA DELIVERY RANGE AT KALIMATTI SUMP FOR DEWATERING OF MINES WATER AT BASANTIMATA-DAHIBARI COLLIERY.
Custom Bid for Services - Dewatering of re-handling patch sump of the mine Similar Category Operation And Maintenance Of Other Machines And Plants
Custom Bid for Services - dewatering and rehandling of pump sump of the mine Similar Category Operation And Maintenance Of Other Machines And Plants
Day to day rep. and maint. of 3.3kV OHTL by dismant, erect, extn, branch extn and repos. of pole and 3.3kV OHTL for supplying power to Shovel No. 3 and 5 and Pump at 32 No. sump and coal face sump as and when req. during the f.y 22-23 under Dakra OCP
Construction of Deep Boring with OHT(Over Head Tank), Laying of Pipe Line and Stand Post Inside Peshrabahiyar Harijantola Anagan Badi Kendra.
Construction of Deep Boring with OHT(Over Head Tank), Laying of Pipe Line and Stand Post near C.C.L. gate Prem Paswan house.
Construction of Deep Boring with OHT(Over Head Tank), Laying of Pipe Line and Stand Post Down the Rahmat Nagar Nilam Lodge.
Construction of Deep Boring with OHT(Over Head Tank), Laying of Pipe Line and Stand Post near Peshrabahiyar Imambada (near Old Tanki) .
Construction of Deep Boring with OHT(Over Head Tank), Laying of Pipe Line and Stand Post at Dandidih Tola Bhargadha Harijan Tola.
Diversion of 11 KV OHT Line for safety of the line at South Tisra at Amal.NT-ST-JG Colliery under Lodna Area.
Construction of Deep Boring with OHT(Over Head Tank), Laying of Pipe Line and Stand Post near Morgiya Tangri Dandidih Kali Manda.
Repair of cracked C-Frame chassis, Plateform, water tank mounting bolts, nut replacement, Hydraulic motor mounting repairing and water sprinkler system of water sprinkler SI.NO. 28265 of Purnadih Project, NK Area
Lifting, renovation/repairing and lowering of 7.5 HP submersible pump and motor complete set of Bore no 3 (Near water tank) at Sec-I of Dugdha T/ship, Block-II Area
Fabrication as bore frame, coupling bore, pump motor welding of damaged portion siding water tank, 2inch dia PVC pipe and fencing work at siding at Phularitand AMP Colliery under Barora Area.
Fabrication of water tank of 2000 cu feet water sprinkling and welding of old iron material from scrap yard for water sprinkling and dust suppression of SLG siding under Govindpur Area
Complete cabin and water tank spray painting and writing of CIL No., manufacturer name, maintenace status and safety marking symbol by 3D radium sticker of WS28015 water tanker of Bokaro OCP
Cleaning of underground clean water tank, sedimentation tank, primary Clarified tank and channels of IWSS Dakra and Rohini Filter Plant under GM Unit, NK Area.( For a period of One Year).
Laying of Pipe Line and Providing of PVC Water Tank and other work at Swalambi Swrojgar Society Mukunda (Jhargraft)old NTC workshop Gokul Park and Near Durga Mandir under Lodna Area.
DESERT AIR COOLER, MIN. WATER TANK CAPACITY 125 Litres, NOMINAL AIR CAPACITY 6000 m3/hr, PLASTIC BODY, FLOOR STANDING WITH INTEGRAL CASTER WHEELS, MOSQUITO BREEDING PROOF, HONEYCOMB PADS, FAN MOTOR RP
Supply, installation, testing and commissioning of controlled hot water tank and cleaning system of capacity 1200 LTR for cleaning of filters and radiators of WAG-9 locos as per Annexure-I .
REP REPLACEMENT CLEANING OF WORNOUT SEWAGE LINE, MANHOLE INCL CLEANING OF SEPTIC TANKS AND CLEANING OF OVER HEAD WATER TANKS AT TEMPLE LANE, STN HQ, MH MDC SHO, MES, ASC, ASRI AND DAD REP MAINTENANCE TO DRAIN, CULVERT AND MISC WORK AT RAMGARH CANT
Dismantling, shifting and installation of 500 GPM pump along with pipeline work for matching installed at 3 no. old Makoli sump under Tarmi OCP
Repairing/fabrication of engine sump guard, repairing/fabrication of coolant Iine steel tubes 02 nos. and mounting of the guard of W/T-28007
COMPLETE REWIDNING/REPAIRIN G OF 350 KW/3.3KV/ 1491 RPM INDUCTION MOTOR SR.NO.F330166/1 MARATHON MAKE INSTALLED AT OCP SUMP AKWMC UNDER KATRAS AREA
Dismantling of LT and HT overhead line with its accessories from mines sump area and light line installation near view point of Kargali OCP.
Cutting of garland drain along the haul road from coal face area to Karipani main sump under SDOCM Project for 4 months. (Monsoon period).
Electrical repairing and maintenance O/H line and cable work of JOCP main sump and Haul road of ABOCP mine under Block-II Area
Dismantling and Diversion of 300 mtr, 150mm MS/GI pipeline from main sump to 10 no. Coal Stock at TTK OCP under Rajhara Area.