Loading…
Loading…
2,252 results • Best match
Construction of Bathroom Arrangement with Polythene Sheet Covering, PVC Water tank and Open kacha Soakpit With Drain for Lok Sabha Election 2024 under D.W. and S. Div. Pakur GROUP NO. BATH 01
Construction of Bathroom Arrangement with Polythene Sheet Covering, PVC Water tank and Open kacha Soakpit With Drain for Lok Sabha Election 2024 under D.W. and S. Div. Pakur GROUP NO. BATH 04
Fabrication of water tank of 2000 cu feet capacity by cutting and welding of old iron material from scrap yard for water sprinkling and dust suppression of NLG siding under Govindpur Area
Erection of 2inch and 1inch dia PVC pipe line from ECO restoration water tank to plantation site near NICCO Plant for providing water to plants of Muraidih, AMP Colliery under Barora Area.
Providing submersible pump of 1 HP, water pipe line to washroom and two 1000 ltr. Capacity water tank UPGM School Dumerbera under Ara Colliery of Kuju Area under CSR Scheme 2024-25.
Drilling and installation of 01 Deep Bore Well including providing and lowering submersible pump motor with complete Electricals, Provision of water tank and Pipeline at Bukbukka Village under Dakra Project, NK Area.
Construction of Bathroom Arrangement with Polythene Sheet Covering, PVC Water tank and Open kacha Soakpit With Drain for Lok Sabha Election 2024 under D.W. and S. Div. Pakur GROUP NO. BATH 03
Construction of Bathroom Arrangement with Polythene Sheet Covering, PVC Water tank and Open kacha Soakpit With Drain for Lok Sabha Election 2024 under D.W. and S. Div. Pakur GROUP NO. BATH 02
FIXING ARRANGEMENT OF FRP WATER TANK FLAPS FOR LHB SCN WIDER WINDOW COACHES. FOLLOW COLOUR SHADE AS PER MD46271 DTD 18.01.2021), as per Drawing: LS43157 ALT b, PACKING INSTRUCTION NO.PI020 VER1.0 OR
Construction of Deep Boring with OHT(Over Head Tank), Laying of Pipe Line and Stand Post near Chaitadih Gopal Das house Samudayik Bhavan .
Construction of Deep Boring with OHT(Over Head Tank), Laying of Pipe Line and Stand Post at Bus Dippo Muhalla 20 no. Koldiha.
Construction of Deep Boring with OHT(Over Head Tank), Laying of Pipe Line and Stand Post near 6 no. Peshrabahiyar Chandan Paswan house
SPL REPAIR TO OHT TANK NOS 03 AND 05 AND 07 AND 08 AT VARIAOUS LOCATION OF DIPATOLI MIL STN UNDER GE DIPATOLI
Construction of Deep Boring with OHT(Over Head Tank), Laying of Pipe Line and Stand Post Near Patari Harijan Muhalla and Thakur Tola
Construction of 6 Nos. Type-V Qtrs. G Plus 3 including water supply and sanitary installation, RCC cum SMC panel over head water tank of capacity 2,00,000 ltr. underground RCC sump of 3,00,000 litre capacity, electrical substation, other civil development work providing internal EI including compound light, LT feeder pillars and laying cables and development work of electrical for ICAR-IIAB at Garhkhatanga Ranchi SH: Providing services of vehicle on hire basis for official use of ADG, Patna (HQ-Kolkata) at Kolkata.
Water Supply Pipe Line External Work
Construction of RCC Toe wall along OB embankment way towards unloading haul road or towards intermediate sump for protection of toe from erosion under ROCP.
Complete repairing and overhauling star delta starter 415 V for 500 GPM pump near main sump for dewatering purpose in respect of AKKOCP, BnK Area
Shifting of 2000GPM/160 mtr pump along with 8 inch dia pipeline from coal face to 9 seam sump of ABOCP Mine, Block-II Area
Shifting of 4000GPM pump along with 10inch/8inch dia pipeline from Deco coal face to Boxcut-III sump of ABOCP mine of Block-II Area
Diverting/Extension of 8/10 inch dia M.S. Pipe line for range -1 from Deco main -sump to Deco coal face of Block-II Area
Leakage repairing in 10in/8in dia MS pipeline , due to rusted damage of existing pipeline at BOCP main sump o ABOCP Mine , Block-II Area
Shifting of 2000GPM pump along with 10/8in dia pipeline from Deco coal face to Box cut -III sump of ABOCP Mine Block- ll Area
REPLACEMENT /RENOVATION OF ROAD CROSSINGS AT DIFFERENT PLACES AT WEST SUMP AND TYRE GOLAI 8 (EIGHT) NOS (10INCH AND 8INCH) AKWMC OCP AT KATRAS AREA.
Repairing of 8/8 DME,1000 GPM , Make M and P , 100 mtr head pump installed at mine sump of Jharkhand OCP under Hazaribagh Area.
Custom Bid for Services - Hiring of 100 HP Diesel Pump for removing water from Sump in 08 no Mines under Chitra colliery under Chitra Colliery
Construction of sump pit, renovation of Electrical sub-station no. 3 and reclamation and renovation of catchment near the said sub-station at Turamdih Mill
Dismantling repairing /replacement of damaged 8 dia ms pipes of 8 dia ms pipe line of main sump pump of under KDH OCP, NK Area.
Repairing and rewinding of 50KVA, 3.3KV/440, Electric Corporation make Sl. No. 298/1 Transformer installed at face sump at Topa OCP under Kuju Area.
Repairing and fixing submersible pump set in deep bore hole at near sump at platform no.01 of Bachra siding under CHP CPP Piparwar Area.
Repair and maintenance of 02 nos motor installed in 3P sump and 02 nos motor installed for face pumping under SDOCM Project of Dhori Area
work of construction of two nos. retaining wall against sump 1MD 44LW AND 55L 5MD in Benti Block (Lower Bachra seam) at Churi UG colliery.
Trench cutting for laying MS Pipe (3 nos. 14 inch dia) for discharge sump water through MS Pipe towards DMZ near UTA mor under ROCP.
Replacing of both the Turbine pump of Muraidih River side sump with 2000GPM motor set and other miscellaneous job of Muraidih Patch under AMP Colliery.
Providing and fixing of bearing housing, DE and NDE of 1000 GPM RKB Pump, Make Kirloskar running at 32 No. Sump face under Dakra Project
Repairing of 10 and 8 dia m.s. pipe line of 1320 GPM pump at sump no. 03 at Jehlitand mine under KDH OCP, NK Area
DELIVERY DIVERSION OF 6inch DIA PIPE 300 MTR. OF QUARY SUMP TO 40 NO. OF AKWMC (BURIED)(INCLUDING DISMENTLING OF OLD DELIVERY ) UNDER KATRAS AREA
10 INCH NEW DELIVERY FROM WEST NEW DELIVERY FROM WEST SUMP TO AMPL MAIN HAUL ROAD (KUMARI JORE) 900 MTR AKWMC OCP UNDER KATRAS AREA
Minor electrical repairing and break down attending of JOCP main sump and Haul road O/H line work etc. ABOCP mine under Block-II Area
LEAK REPAIRING OF 6INCHDIA AND 4INCH DIA DELIVERY RANGE FROM 2 PIT AGKCC TO SUMP EARTH DIGGING AND TAKING PIPES AT AGKCC UNDER, KATRAS AREA.
Providing and fixing of gland bush and denting of cable entry boxes of starters installed at Jehlitand and main sump under KDH OCP, NK Area.
DIVERSION OF OVER HEAD LINE 6.6 KV FEEDER NO. 4 NEAR AMPL VIEW POINT RAM SETU TO WEST SUMP AT AKWMC OCP UNDER KATRAS AREA.
LOWERING UP OF WEST SUMP and DELIVERY DIVERSION (4 PUMPS) AND 10INCH AND 6INCH DELIVERY DIVERSION 60 MTR EACH AT AKWMC OCP UNDER KATRAS AREA
Repairing/Reconditioning of DOL starter 440 volt sl no. RH/EnM/02 installed at sump no. 04 in respect of Rohini Project, N K Area.
Partial repairing of star delta starter 550V for 500GPM pump near main sump for dewatering purpose in respect of Konar Exp. OCP under BnK area
Shifting of 4000GPM pump motor set of Jharna face for 04 times with gradual increasing of water level of the sump under Muraidih, AMP Colliery.
Sump cutting and trench in intake no. 02 and 03 at Damodar River to maintain adequate quality of water supply under GM Unit, NK Area.
Construction of Toe wall along road embankment lower side from existing toe wall towards near UTA sump for protection of toe from erosion under ROCP.
Construction of Guard wall at Top edge of Sump from existing guard wall near Lohandia basti to main road Basdiha along mines edge.(2nd call).
Construction of Guard wall at Top edge of Sump from existing guard wall near Lohandia Mandir to along Lohandia basti (L-175 mtrs) under ROCP