Providing and fitting of 8 inch helical hose 200 mm dia for different 2000 GPM/1000 GPM pump under operation at Kabribad Mine Departmental as well as Outsource sump, GRD Project.
Providing and fixing of 6 dia NR Valves at pipe line of 1320 GPM of 3rd and 4th range at sump no. 03 at Jehlitand mine under KDH OCP, NK Area.
Cutting, jointing and laying of 6 inch and 8 inch dia G.I. and M.S. Pipeline for dewatering near Main Sump to outside of the Mine, w.r.t. konar exp. OCP, BnK Area
SHIFTING AND LOWERING OF TWO NO 2000GPM,(B)4000GP M (C) 2000GPM PUMP MOTOR SET COMPLRTE MECHNICAL WITH ELECTRICAL FROM OCP WEST SIDE OF OCP SUMP AT WMC UNDER KATRAS ARE
Upkeepment of 201 belt conveyor deck plat, tail end area, conveyor gallery, sump pump pit of PS-1 section of ROM section at Madhuban Coal Washery under Block-II Area, BCCL.
Shifting of HT 2000gpm pump motor set in another safe side of the sump due to advancement of mine and maintenance of 2000gpm pump at old Ghutway patch3 of Damoda Colliery
Making temporary sand bag check wall across river bed for storage of water including deeping of sump for water supply purpose at ray colliery pump house under Gm Unit Piparwar Area.
COMPLETE REPAIRING OF 400 AMPS. GEC SWITCH OCB 550 VOLT TYPE LIB 2 SL.NO.314742 AT WATER SUMP NEAR 2 PIT AGKCC WITH MATEARIAL AND LABOUR CHARGE BASIS UNDER KATRAS AREA
Providing and fixing of required materials for making arrangement of cooling system and mounting of 2K GPM RKB 250/46 and 336 KW motor at 32 nos Sump under Dakra project.
Dismantling ,rearrangement and extension of 220V OH line , for providing lighting arrangement at OB Dump , Haul Road , near the view point and main sump, in respect of AKK OCP, BnK Area
Shifting and installation of 03Nos. of HT 4000GPM Pump at lower level at 4th Patch sump due to decreasing of water level of all the pumps at Muraidih under AMP Colliery
Erection of 2nd 4000GPM Pump motor set through assembling, transporting and installation in SOCP old coal face sump and erection of its delivery for dewatering of mine at Muraidih, AMP Colliery.
Repairing of leakage in 8/10in dia rusted/damaged pipe line 3rd range and installation of 4000GPM pump motor set at D/L.face old sump of ABOCP mine Block-2 area
Extension of 6 dia M.S. Pipe line at sump no. 03 at jehlitand for safe operation of 1000 GPM Pump, Make M and P of pontoon under KDH OCP, NK Area.
Repairing and replacement of drive line universal joint cross and flange assembly and repairing and fabrication of engine sump guard and transmission line steel tubes 0 2 nos. of dumper 10341.
work of Repairing of leakage in 10/8 inch dia rusted/damaged M.S. pipe line and installed GPM pump set at dragline coal face sump of ABOCP mine, Block-II Area
Cutting of bushes/ shrubs ( 3 times) at Regional Substation, Electrical Substation No. 02, Colony No. 04 Substation near water tank and cutting of tree branches at colony no. 02, 03 and 04 including 440 V O/H lines of Kathara Colliery
Construction of 13 nos water supply scheme with 1 HP DC solar motor pump with existing source of water 2000 LPH steel structure HDPE water tank through the head of 15th finance Zila Parishad chaibasa under DWS Mechanical Division Chaibasa
A Repairing, maintenance and fabrication of Water Tank Leakage proof plate changing work of Water Tanker bearing Reg. no. BRY - 3178 of Dhori (K) Colliery B Repairing of dashboard cabin, seat mechanical work of Truck bearing Reg. No. BRY - 3041
Construction of HYDT 200mm X 165mm Dia x 250.00 Mtrs deep bore well with 1.0 HP DC Solar motor pump complete set and Square Tube Steel Structure and HDPE Water Tank 6.00 mtr Staging Capacity-2000 Ltr. for Tola Lukayatand
Construction of 10 nos water supply scheme with 1 HP DC solar motor pump with existing source of water 2000 LPH steel sturcture HDPE water tank through the head of 15th finance zila parishad chaibasa under DWS Mech Div Chaibasa
Construction of Solar Based Mini water Supply Scheme SVS IN Different Block comprising of suitable steel structure and HDPE Water Tank RCC Framed structure ESR Distribution Line Source and FHTC all complete job in the Different block Group No 6A
Construction of Solar Based Mini water Supply Scheme SVS IN Different Block comprising of suitable steel structure and HDPE Water Tank RCC Framed structure ESR Distribution Line Source and FHTC all complete job in the Different block Group No 16C
Construction of Solar Based Mini water Supply Scheme SVS IN Different Block comprising of suitable steel structure and HDPE Water Tank RCC Framed structure ESR Distribution Line Source and FHTC all complete job in the Different block Group No 2A
Construction of Solar Based Mini water Supply Scheme SVS IN Different Block comprising of suitable steel structure and HDPE Water Tank RCC Framed structure ESR Distribution Line Source and FHTC all complete job in the Different block Group No 3D
Construction of Solar Based Mini water Supply Scheme SVS IN Different Block comprising of suitable steel structure and HDPE Water Tank RCC Framed structure ESR Distribution Line Source and FHTC all complete job in the Different block Group No 1A
Construction of Solar Based Mini water Supply Scheme SVS IN Different Block comprising of suitable steel structure and HDPE Water Tank RCC Framed structure ESR Distribution Line Source and FHTC all complete job in the Different block Group No 4B
Construction of Solar Based Mini water Supply Scheme SVS IN Different Block comprising of suitable steel structure and HDPE Water Tank RCC Framed structure ESR Distribution Line Source and FHTC all complete job in the Different block Group No 15A
Construction of Solar Based Mini water Supply Scheme SVS IN Different Block comprising of suitable steel structure and HDPE Water Tank RCC Framed structure ESR Distribution Line Source and FHTC all complete job in the Different block Group No 8A
Construction of Solar Based Mini water Supply Scheme SVS IN Different Block comprising of suitable steel structure and HDPE Water Tank RCC Framed structure ESR Distribution Line Source and FHTC all complete job in the Different block Group No 1B
Construction of Solar Based Mini water Supply Scheme SVS IN Different Block comprising of suitable steel structure and HDPE Water Tank RCC Framed structure ESR Distribution Line Source and FHTC all complete job in the Different block Group No 7D
Construction of Solar Based Mini water Supply Scheme SVS IN Different Block comprising of suitable steel structure and HDPE Water Tank RCC Framed structure ESR Distribution Line Source and FHTC all complete job in the Different block Group No 16B
Construction of Solar Based Mini water Supply Scheme SVS IN Different Block comprising of suitable steel structure and HDPE Water Tank RCC Framed structure ESR Distribution Line Source and FHTC all complete job in the Different block Group No 6B
Diff.types of jobs such as repairing of old water tank at Shatabdi filter plant, laying and jointing 1inch dia PVC pipe for tanker, fabrication and fixing of safety board and valve repairing and coupling bore and keyway making under Muraidih,AMPC
Consttruction of 08 nos Rural Water Supply Scheme with 1.0 HP DC solar motor pump complete set and 10 house connection with existing source of water, steel structure, HDPE water Tank through the head of 15th finance ZPDP West Singhbhum, Chaibasa
hydrostatic test pump hand operated, material SS-304 , for pressure upto 211kg/cm2, discharge size 3/8" pipe with 1/2 BSP connector both side , plunge - single . output cc/ stroke -8.83 , plunger size 15 mm , water tank size 22 litre
Construction of Potable water Supply Scheme with 03 Nos HYDT 270 mtr deep with 50000 Ltr sump and pump house along with provision of multi stage centrifugal pump with pipe line arrangment
Repairing and reconditioning of A) HT Starter 3.3KV, 105A installed at the reddy sump B) mineline LT Starter SL.no. 1703, 550V, 200A installed at the laiyo filter plant of JOCP, Hzb Area.
Marching of pontoon with 2000GPM pump motor set from existing position to the lower side of the sump and necessary diversion of its delivery range at main patch of Phularitand, AMP Colliery
Fabrication and Erection of 2 Nos Delivery pipe line, Size 8 Length 860mtr each of Pumps to be fabricated and erected from East side Sump of Jarangdih OCP to the konar River
Shifting of 220V Overhead line in the vicinity of 5K ranging from washing plant to 5K quarry sump old and installation of 25KVA 3.3KV/440V lighting transformer at Barmuri OCP Mugma Area
Diversion of 6point6KV overhead line to feeding power to domestic water supply 4000gpm pump motor set due to shifting of pump in another side of the Jharna sump at Muraidih AMP Colliery
DISMANTLING/MAN UAL TRANSPORTATION OF SUMP UPPER BENCH 4000 GPM PUMP DELIVERY SECTION COMPLETE SET.03 NOS.(1) LAKARKA DELIVERY 4000 GPM PUMP SET.(2) ANGARPATHRA DISPENSARY DELIVERY 4000 GPM PUMP SET
LOADING UNLOAIDNG OF PV 3 PUMP MOTOR SEAT FROM CHP AND INSTALLATION AT WEST SUMP INCLUDING MATCHING OF SUCTION AND DELIVERY AND INTER CONNECTION OF 6INCH PIPE TO 2000 GPM PUMPL DELIVERY
Making an arrangement for laying 90Mtr 8 inch dia pipeline for providing deliver pipeline of flow more pump to be shifted to new location installed at quarry Sump, PPR patch Ashok OCP
(1)JOINING OF PIPELINE RANGE 10inch DIA FOR DEWATERING PURPOSE OF AMPL SUMP AT AKWMC. (2.) DISMANTLING TRANSPORTATION AND OF VERTICAL 10inch DIA MS PIPES IN THE EAST SIDE OF AKWMC, OCP
Repairing/reconditioning of skid, base and installation of pump set with provision of v-belt and link belts for pump installation at BKB and quarry 2 sump under Ashok OCP, PPR Area.
Day to Day placing/relocations of 02 pumps running at Quarry 2 sump on as and when required basis to suite the suction head and site condition under Ashok OCP,PPR Area.
Making temporary sand bag check wall across river bed for storage of raw water including deeping of sump for water supply purpose at Ray colliery pump houses under GM Unit Piparwar Area.
6INCH DIA M.S PIPE 75 NOS.450 MTR BRINGING FROM SALANPUR COLLIERY TO WMC AND CARRYING LAYING JOINTING FROM OCP SUMP WEST SIDE TO UPPER SIDE AMBEY GOLAI BHUMI RANGE AT AKWMC