Loading…
Loading…
2,253 results • Best match
Construction of Mini RPWS Scheme with RCC Water Tank, DC Solar Motor pump and 5 Years OM etc all complete job in Block Satgawan Panchayat Rajabar Village Mochramo under D.W. and S. Div JMT on TURN KEY BASIS for the year 2021-22
Construction of Mini RPWS Scheme with RCC Water Tank, DC Solar Motor pump and 5 Years OM etc all complete job in Block Domchanch Panchayat Bangakhalar Village Padariya under D.W. and S. Div JMT on TURN KEY BASIS for the year 2021-22
Construction of Mini RPWS Scheme with RCC Water Tank, DC Solar Motor pump and 5 Years OM etc all complete job in Block Markacho Panchayat Dagarnwan Village Asnatari under D.W. and S. Div JMT on TURN KEY BASIS for the Year 2021-22
Construction of Mini RPWS Scheme with RCC Water Tank, DC Solar Motor pump and 5 Years OM etc all complete job in Block Satgawan Panchayat Kothiyar Village Ghursahi under D.W. and S. Div JMT on TURN KEY BASIS for the year 2021-22.
Construction of Mini RPWS Scheme with RCC Water Tank, DC Solar Motor pump and 5 Years OM etc all complete job in Block Markacho Panchayat Dagarnwan Village Pichhari under D.W. and S. Div JMT on TURN KEY BASIS for the Year 2021-22.
Construction of Mini RPWS Scheme with RCC Water Tank, DC Solar Motor pump and 5 Years OM etc all complete job in Block Domchanch Panchayat Dhodhokola Village Kushhana under D.W. and S. Div JMT on TURN KEY BASIS for the year 2021-22.
Construction of Mini RPWS Scheme with RCC Water Tank, DC Solar Motor pump and 5 Years OM etc all complete job in Block Markacho Panchayat Dagarnwan Village Lohabar under D.W. and S. Div JMT on TURN KEY BASIS for the Year 2021-22.
Renovation/repairing of of 03 Nos 7.5HP submersible pump and motor complet set of Dugdha T/Ship, Block-II Area Bore No.6 (Near Peepal Gach) at Sec-II,Bore no. 3 (Near Water Tank) and Bore No.7 (Near Hanuman Mandir)
Construction of Mini RPWS Scheme with RCC Water Tank, DC Solar Motor pump and 5 Years OM etc all complete job in Block Koderma Panchayat Jarga Village Bishunpur under D.W. and S. Div JMT on TURN KEY BASIS for the Year 2021-22
Construction of Mini RPWS Scheme with RCC Water Tank, DC Solar Motor pump and 5 Years OM etc all complete job in Block Satgawan Panchayat Ambabad Village Khawasdih under D.W. and S. Div JMT on TURN KEY BASIS for the year 2021-22.
Construction of Mini RPWS Scheme with RCC Water Tank, DC Solar Motor pump and 5 Years OM etc all complete job in Block Domchanch Panchayat Dhodhokola Village Nalwa under D.W. and S. Div JMT on TURN KEY BASIS for the year 2021-22
Construction of Mini RPWS Scheme with RCC Water Tank, DC Solar Motor pump and 5 Years OM etc all complete job in Block Domchanch Panchayat Parho Village Jorasimar under D.W. and S. Div JMT on TURN KEY BASIS for the year 2021-22
Construction of Mini RPWS Scheme with RCC Water Tank, DC Solar Motor pump and 5 Years OM etc all complete job in Block Koderma Panchayat Jarga Village Jarga under D.W. and S. Div JMT on TURN KEY BASIS for the year 2021-22.
Providing and fixing of 6 inch dia NR valves at pipeline of 1320 GPM pump 2 nd and 3 rd range at sump no. 03 at Jehlitand pump of under KDH OCP, NK Area.
Construction of retaining wall at lower embankment of OB dump at near OB rehandling bypass road and connecting existing triple row hume pipe culvert from intermediate sump to protect earth erosion under ROCP.
Providing and fixing of Coupling bolt, nut, washer and rubber bush and H/D asbestos coated graphite lubricated packing for operation of 1.3 GPM at 32 No. Sump under Dakra project, NK Area
Construction of Drain, Sump, Inspection Chamber and Laying of Horizontal Boring with Pipe for Outlet of Water from Courtyard and Parking area in the Campus of New Jharkhand High Court at Dhurwa, Ranchi.
Laying and fixing of 8 inch and 6 inch dia pipeline for dewatering of new 0.75 MTY new expansion and Sump No. 04 for monsoon preparation work at Rohini OCP under NK Area
Dismantling, repairing, replacement of wornout spare parts of PS-1 Sump pump i.e. head shaft, impeller shaft, T.T. joint and bush of ROM section at Madhuban Coal Washery under Block-II Area, BCCL.
Diversion of LT overhead line(440V) feeding power to pump installed at 42 No old sump/ quarry to provide raw water to filter plant for domestic water supply at TNOCP under Hazaribagh area
Reorganisation and extension of 6 inch dia MS G.I. pipe required for shifting of 1000 GPM and 500 GPM pump at the main sump, due to displacement of water accumulation area bokaro Colliery
Maintenance of 02 nos of HT pump 4000gpm and 1000gpm of main patch sump and leakage repairing in 10inch dia and 6inch dia MS pipe line of main patch of Phularitand AMP Colliery
Laying of pipeline of 150mm from face pump dewatering point to view point for connection with the existing pipeline to discharge water directly from face sump to mines at PEOCP under Hazaribag Area
Re organization Dismantling ,laying and jointing of 8 inch dia pipeline and shifting and lowering of 2000 GPM pump for dewatering of main and middle mines sump w.r.t. konar exp. OCP, BnK Area
Repairing of 2 nos. Induction motors.(A). 335HP, 3.3KV, 1485RPM, Crompton greaves make induction motor installed at purnatand main sump (B). 435HP, 3.3KV 1485RPM, GEC make induction motor installed at Departmental mine AADOCM.
DISMANTLING LOWERING SHIFTING/INSTALLATION (1) 4000 GPM PUMP SET ANGARPATHRA HOSPITAL SIDE (2) 4000 GPM PUMP LAKARKA SIDING DELIVERY(3) 800 GPM PUMP ANGARPATHRA HOSPITAL SIDE WEST SUMP AKWMC OCP UNDER KATRAS AREA.
DISMANTLING/MANUAL TRANSPORTING, LOWERING, SHIFTING 4000 GPM PUMP SET 01 NO. (4000 GPM PUMP) 10INCH DELIVERY KUMARI JORE EAST SIDE II.KUMARI JORE 10INCH DELIVERY WEST SIDE 4000 LAKARKA DELIVERY WEST SUMP AT 3
Mechanical repairing of 360 KW, 480 HP 3.3 KV grade 1445 rpm induction motor attached with 2000 GPM installed at main sump for dewatering purpose in respect of Konar Exp OCP, BnK Area
Dismantling, Repairing and replacement of wornout spare parts of PS1 Sump Pump i.e. head shaft, impeller shaft, T.T. joint and bush of ROM section at Madhuban Coal Washery under Block-II Area, BCCL.
Replacement of ACSR/AAA Rabbit conductors with ACSR/AAA Dog conductors in Feeder No. 06, 6.6 kV feeding power to the pumps operating at Sump No. 03, Jehlitanr under KDH OCP, NK Area
Shifting of HT 2000gpm pump motor set in lower side of the sump due to decreasing of water level and other miscellaneous pumping and pipeline works at old Ghutway patch3 of Damoda Colliery
Laying of one new pipeline delivery range through the culvert towards Quarry No. 02 road for installation of a 1000GPM pump at CKE Face sump for dewatering purpose under Purnadih OCP, NK Area
Shifting of HT 4000gpm pump in another safe side of purba face sump 2times along with diversion of its pipe line in safe route for smooth operation of pumping at Muraidih AMP Colliery
Repairing of leakage in 10/8 inch dia rusted/damaged M.S. pipe line and installed 2000 GPM/150 Mtr Head pump set at dragline coal face sump of ABOCP mine, Block-II Area
Maintenance 2times of 4nos of HT pumps running in the different sump and leakage repairing in 10inch dia and 8 inch dia MS pipe range in various places of Muraidih under AMP Colliery
Dismantling of two Pipeline range 8 inch 10 inch Deco main sump to deco coal face east side (Purba coal face), With pump motor set deco face ABOCP Mine under Block-ll Area
Construction of 2no. Retaining wall against sump at 24 R , 51 LW in CMP W9 panel and 37 LW ,1 MD (Benti Block) in Lower Bachra seam in Churi Colliery, N K Area
Laying of 10 inch dia and 8 inch dia pipe line for revival/restoring 4 ranges of pipe lines for smooth and fast dewatering of Patch A sump under Ask OCP,PPR Area.
COMPLETE REWINDING/REPAIRING OF 300 KW/410 HP, BOTH 3.3 KV AND 6.6 KV RPM 1480 INDUCTION MOTOR MAKE CROMPTON GRAVES, SL.NO.223829874B OF OCP EAST SUMP PUMP AT AKWMC UNDER KATRAS AREA
Extension of 3.3KV HT OH 2.5 MVA field feeder lines in new eastern sump side for providing power to the 2000GPM pump-motor set and 581 electric shovel of JOCP under HZB Area.
Shifting of HT 2000gpm motor set in upper side of the sump due to increasing of water level and other miscellaneous pumping and pipe line works at old Ghutway patch3 of Damoda Colliery
MANUAL TRANSPORTATION OF 10INCH PIPES OF 3000 GPM (I) AND (II) DELIVERY OF WEST SUMP AND STACKING AT NEW DIVERSION SITE 300 MTR 350 MTR 650 MTRS. AT OCP AKWMC UNDER KATRAS AREA
Dismantling, withdrawal, transporting, installation 2000GPM pump from 3rd patch sump to SOCP main patch including dismantling, transporting, laying, jointing 10inch dia pipeline for discharging mine water of SOCP main patch of Muraidih, AMPC.
Maintenance/Tensioning of loose conductor 6 span 440v lighting line from TSS 4204 to BKB old sump including replacement of damaged pin insulator/shackle insulator / stay set etc as required under Ashok OCP.
Maintenance of 4nos of HT pump of MOCP Jharna face and 3rd patch coal face sump and leakage repairing in 10inch dia MS pipe line in various places of Muraidih under AMP Colliery
Re-handling of spilled coal or slurry from tail end of 133A and B to RGB sump, Exhaust fan house and behind 116A and B tail end of Pre-washery of Kedla Washery.
77 pump motor set complete with electrical and mechanical shifting/ lowering from upper side to lower side of sump water level and re-installation at WM OCP west side AKWMC under Katras Area.
Laying and fixing of 6 and 4 dia MS pipes for installation of 500 GPM pump for tanker point near 19 no. coal stock at main sump of under KDH OCP, NK Area.
02times marching of 4000GPM Pump motor set of Jarlahi sump and maintenance of the above pump along with diversion of its pipe line due to mining activity at Phularitand, AMP Colliery, Barora Area.
Re-organization of domestic water supply 6inch/4inch dia pipe Range from Albion OCP Sump to Ramgarh Jharia main line through eco-restorattion site Near Feeder Breaker of Damoda Colliery under Barora Area.