Construction of Mini RPWS Scheme with RCC Water Tank, DC Solar Motor pump and 5 Years OM etc all complete job in Block Markacho Panchayat Dagarnwan Village Parsabad under D.W. and S. Div JMT on TURN KEY BASIS for the Year 2021-22 (2nd Call)
Construction of Mini RPWS Scheme with RCC Water Tank, DC Solar Motor pump and 5 Years OM etc all complete job in Block Satgawan Panchayat Rajabar Village Chhapari under D.W. and S. Div JMT on TURN KEY BASIS for the year 2021-22. (2nd Call)
Construction of Mini RPWS Scheme with RCC Water Tank, DC Solar Motor pump and 5 Years OM etc all complete job in Block Koderma Panchayat Kaiuabar Gajhandi Village Kaiuabar Gajhandi (Part B) under D.W. and S. Div JMT on TURN KEY BASIS for 2021-22.
Collection from Door to Door Sweeping of Road and Open Surface Clearing of Bush and Grass Cleaning of Drain Cleaning of Roof Cleaning of Water Tank and Disposal of all Garbage at specified place to maintain hygiene and sanitation at B C and D Typ
Construction of Mini RPWS Scheme with RCC Water Tank, DC Solar Motor pump and 5 Years OM etc all complete job in Block Koderma Panchayat Kaiuabar Gajhandi Village Ambakola under D.W. and S. Div JMT on TURN KEY BASIS for the Year 2021-22.
Construction of Mini RPWS Scheme with RCC Water Tank, DC Solar Motor pump and 5 Years OM etc all complete job in Block Koderma Panchayat Kaiuabar Gajhandi Village Kaiuabar Gajhandi (Part A) under D.W. and S. Div JMT on TURN KEY BASIS for 2021-22.
Spl rep to PCC path from records road ain office gate at 17camp SRC static water tank approx 14.5x14.5 mtr at 48I up PI ASC Provn of Lightening conductor at CSD Barrack T1 Trg bn office E305 GSI P461Mandir P480 Gurudwara FWC at PRC
Construction of Mini RPWS Scheme with RCC Water Tank, DC Solar Motor pump and 5 Years OM etc all complete job in Block Jainagar Panchayat Jainagar West Village Irgobad under D.W. and S. Div JMT on TURN KEY BASIS for the Year 2021-22.
Rubber pad for fixing roof water tank to size 10 x 60 x 1050 mm to ICF Drg. No. SCN-6-3-306, Alt-g/8, item No.19. Shelf life period:09 to 12 months from the date of manufacturing. Firm offered make: S
Shifting of 4000 GPM/10UPH 8 pump and 2000 GPM/100 mtr pump along with 10 inch/08 inch dia pipeline from coal face to Box Cut-III sump of ABOCP mine, Block-II Area
Different type of work i.e. pump shifting, pipeline shifting and break down rectification work at D/L coal face sump to Box cut-III Out sourcing cutting zone of ABOCP Mine under Block-II Area
Dismantling, laying and fixing of 10 inch, 8 inch and 6 inch dia MS pipe as and when required for shifting of pumps running at Jehlitand mine Sump No. 04 under KDH Project, NK Area.
Erection of 3 phase 440 volt power supply from nearest source point i.e. Kuyya Colliery Bastacola BCCL for pumping from sump at Baliapur Road for Kujama and Lodna Colony of Kujama Colliery under Lodna Area.
Marching of pontoon with 3000GPM pump motor set in the lower side of the sump due to deceasing of water level and necessary diversion of its delivery range at main patch of Phularitand, AMP Colliery
Diversion of 3.3KV HT OH line for providing space for mining activities and erection of 230 volt LT OH line for proper illumination at the proposed new sump under Ashok Open Cast Project, Piparwar Area.
Shifting of 8 inch dia MS Pipeline with laying, fixing, dismantling, cutting, jointing, bend making etc work for operation of Pumps at Coal face as well as 32 No. Sump under Dakra Project, NK Area
Extension of delivery of 3000GPM and 2000GPM pump installed on the pontoon at main patch sump due to gradual decreasing of water level and maintenance of above pump for smooth operation at Phularitand, AMP Colliery.
Shifting of 4000 GPM/10UPH 8 pump and 2000 GPM/150 Mtr. pump along with 10 inch/08 inch dia Pipeline from coal face to Box Cut-III sump of ABOCP mine, Block-II Area
Shifting 4000GPM Pump 3rd patchsump from damaged pontoon and installation groundlevel and maintenance abovepump andpipe line, recovery of 10inch 8inch dia pipe old deliveryrange 3rdpatch sump, maintenance of 03No pumps and other work of AMPC.
Providing and Fixing of different size of H/D asbestos coated graphite lubricated packing for operation of 2000 GPM pump, 1000 GPM pump 32 No. Sump and washing pump under Dakra Project N.K Area CCL
Dismantling, Overturning, repairing, erection and alignment of pipes supports outside PS-5 i.e. the area in between PS-5 to PS-14 and PS-14 platform sump mouth net under Pump Section of Rajrappa Washery
Shifting of HT 2000gpm pump motor set in the lower side of the sump due to decreasing of water level and other miscellaneous pumping and pipe line works at old Ghutway patch3 of Damoda Colliery
Welding and supply of 8 inch dia flange with 8 inch MS pipe for laying of new proposed pipe line from Crew Sump to outside mines premises for dewatering w.r.t Konar Exp Ocp,BnK Area
Erection of a 6.6kV Overhead Line from the Transportable Sub-Station Site to the Main Sump Pump House Site for the establishing power supply for electric pumps for dewatering at Tetariakhar OCP under Rajhara Area
DISMANTLING , COLLECTION MANUAL TRANSPORTATION OF 10inch PIPES FROM DIFFERENT PART OF OCP TO WEST SUMP 1 STRINGING FOR 3000(1) and3000 (2) DELIVERY DIVERSION and INSTALLATION OF 800 GPM PUMP ON GROUND FOR LAKARKA AT
Laying of a new pipeline delivery range for installation of a pump at Sarna patch (Sump No. 05)near working face of mine for dewatering purpose at Quarry No. 01 under Purnadih OCP, NK Area.
a) Shifting of 2000 GPM pump motor set alongwith diversion and extension of delivery range at coal sump B) Diversion of 8inch dia MS pipe near high wall side at Jamunia patch of ABOCP Mine
Dismantling and changing of damaged base structures of slurry pumps 655-1,2,3 and sump pump along with their motor bases and their proper alignment at (-3) M floor of Washery Building of Moonidih Coal Washery.
Shifting of HT 2000GPM Pump Motor set in the lower side of the sump due to decreasing of water level and other miscellaneous pumping and pipeline works at Old Ghutway Patch-3 of Damoda Colliery.
DISMANTALING ,MANUAL SHIFTING OF 10INCH/8INCH/6INCH PIPES 10INCH NRV/SLUICE VALVE AND pv 2 PUMP MOTOR SET AT WEST SUMP FOR MAKING NEW ROAD TO 800 GPPAND PV2 PUMP AT AKWMC UNDER KATRAS AREA.
Dismantling and laying of 8 dia GI/MS pipe 216 mtr. and 6 dia G.I./M.S. pipe 300 mtr. for dewatering of installation, shifting of 2000 GPM pump at Karipani mine sump location under SDOCM
(1) REPLACEMENT/RENOVATI ON OF FABRICATION ROAD CROSSING PIPES AT DIFFERENT PALCES AT WEST SUMP AND HAUL ROAD (08INCH) AKWMC OCP AT KATRAS AREA.(2) FABRICATION OF BENDS SHORT PIECE,TAPER U AND JOINTING/WELDING
Dismantling repairing replacement of wornout spare parts of PS 1 Sump pump I e Head shaft impeller shaft T T joint and bush of ROM section at Madhuban Coal Washery under Block II Area BCCL
Laying of two ranges of 8 inch dia pipe line each of length 850 mtr for provision of delivery pipe line of pump to be installed at Patch A sump under Ashok OCP, Piparwar area.
Shifting of 4000 GPM/1QUPH 4 pump and 2000 GPM/100 mtr pump along with 10 Inch/08 inch dia pipeline from coal face to Box Cut-III sump of ABOCP mine, Block-II Area
DIVERSION OF 10 inch DELIVERY RAM SETU HAUL ROAD TO AMBEY COAL DUMP DISMANTLING OF ROAD CROSSING / VERTICAL THREE PLAES MAKING 300 MTR 3000 GPM DELIVERY KUMARI JORE WEST SUMP AKWMC OCP UNDER KATRAS AREA
Replacement of existing steel wire mesh door of Type -V quarter with new wooden wire mesh door and replacement of existing damaged ladder of OHT in GPRA, Ranchi Basti, Lamba Line, Sri Vijaya Puram.
Different type of pumping and pipeline work i.e, shifting and installation of 4000 GPM pump and shifting of 10 and 8 inch pipe at JOCP main sump for Dewatery of ABOCP mine, under Block-II Area
Replacing of B/D 1000GPM pump motor set by one 1000GPM pump motor set and Shifting of 1000GPM Pump motor set (Domestic water supply) in upper side of the sump of Albion OCP at Damoda Colliery
Different type of pumping and pipe line works i.e. pump shifting pipe line shifting and B.D. rectification at D.L. Coal face sump to box cut-III out sourcing zone of ABOCP mine under Block-II Area
(1) DISMANTLING AND STACKING OF 10INCH LAKARKA DELIVERY 10INCH BHUMI DELIVERY 10INCH KUMARI JORE DELIVERY AT WEST SUMP AKWMC OCP KATRAS AREA.(2) (I) DISMANTLING/REPAIRI NG AND FABRICATION OF CACH PIPE FROM 4 SEAM DEPARTMENTAL
laying and Erection of 4inch pipe line from main sump to water filling point near view point for alternative arrangement of water supply to crusher and water filling station at Tapin South OCP under Hazaribagh area.
2nd range delivery extension by 8inch/6inch of 4000 GPM 10 UPH4 pump and transporting and laying and jointing of 8inch/6inch MS pipe from old sump to new coal face 1T patch of ABOCP mine
Transporting and installation of 2000gpm pump motor set at old Ghutway patch 3 sump after necessary repairing and erection of its 8inch MS pipe line for dewatering of mine water on the Nalla at Damoda Colliery
02time shifting of HT2000GPM Pump, motor set in another side of the sump along with diversion of its 8inch dia M.S.Pipe line due to advancement of mining activity at Old Ghutway Patch-3 of Damoda Colliery.
Rearrangement and extension of 4 inch and 6 inch dia pipeline in mines for facilitating space for mining operation and shifting of pump on another place in main sump at Tapin South OCP under Hazaribagh area
Erecion of 8 inch dia MS Delivery Pipe Line and 6 inch Dia M.S Suction pipe Line for installation of EST200/250 Pump at Lalgotua Sump for supplying water to Lalmatia Filter Plant of Rajmahal OCP.
Providing and fixing of C.I. foot valve Size-6 inch Heavy duty and G.I/M.S flange 6 inch for operation of pump at coal face as well as 32 No. sump under Dakra Project, NK Area.
Extension of 8 inch dia MS pipeline for shifting of 03 nos. of 2000 GPM pumps and 01 no. of 1000 GPM pump at Sump No. 03 Jehlitand for mine dewatering under KDH OCP, NK Area
Lowering of two HT pump motor set of coal face sump and extension of its suction pipes, shifting of 4000GPM pump motor set of Jharna face and extension of its suction pipe of Muraidih, AMP Colliery