Loading…
Loading…
2,584 results • Best match
Construction, of 2 LL GLSR , supplying, laying, testing, commissioning and maintenance of CWPM and distribution and providing FHTCs
State Plan - RWSS to Kunnathukal Pressure gruiting maintenance of GLSR at Kadalanimala by pressure grouting to prevent leak
AS PER BOQ AND TENDER DOCUMENTS
JJM 2021 2024 CWSS to Vamanapuram Nellanad and Manickal Panchayaths Package 6 Design and Construction of 8LL capacity of OHSR 4.5LL Sump and pump house at Perayathumughal 4.5LL OHSR at Thampuranpara and 5.5LL OHSR at Vellanickalpara
JJM Augmentation to ARWSS to Bharanikkavu Thekkekkara Vallikunnam and Krishnapuram panchayaths Package IV Survey Investigation works Construction of 6 LL OHSR and 1 LL Sump at Padayanivattom in Vallikunnam Panchayath Supplying laying 400 mm DI Clear
JJM-WSS to Nannambra GP-Package II-Design Construct 9MLD WTP with OHSR sump cum pump house Compound wall including supply and erection of RW and CW pump set with transformers and allied works-Pipeline Work
GENERAL-MCK-New Casualty Block Phase II-Constructing electrical room ,Laying interlocking paver blocks in the parking yard, Providing protection works above the retaining wall near new lift and constructing a room above sump.-Composite Work
Deposit work of KINFRA Supplying and laying, joining, testing and commissioning of 150 mm DI transmission line from OHSR at Ullumalakunnu to sump at KINFRA Park near Sainik school Kazhakuttom Extra Items and Road restoration work
GENERAL Rehabilitation of Pavannur LI Reconstruction of Sump tank and damaged leading channel of Pavannur LI scheme Between Ch 0 000 to Ch 0 175 in Kuttiyattor Panchayath in Thaliparamba constituency Kannur district General Civil Work
The scope of work includes repair works such as cleaning blocked sewer manhole patch plastering cleaning water tanks vitrified tile etc
8 LL OHSR AT VEERAMALA, CLEAR WATER PUMPSETS FOR PUMPING CLEAR WATER FROM WTP TO EX GLSR AT VEERAMALA AND PRO OHSR AT VEERAMALA, CWPM, DI PVC GI DISTRIBUTION NETWORK FROM EX GLSR AT VEERAMALA, PRO OHSR AT VEERAMALA AND PROVIDING FHTCs IN 2 ZONES
Providing Functional House Hold Tap Connections By Construction Of GLSR And Laying New Distribution Network In Nochad Grama Panchayath.
Construction ,Testing and Commissioning of 18 LL GLSR , Providing FHTCs by Laying New Distribution Lines at Omassery Grama Panchayath
State Plan - RWSS to Kunnathukal - Pressure Groutng maintenance of GLSR at Kadalanimala by Pressure grouting to prevent the leak
Protection work using wire mesh around water tank area in VBI ,Palode.
Renovation of Water supply Pipe line, water tank and pipe line extension
Construction Of Over Head Water Tank for Govt.PolyTechnic CollegeMeenagady at meenangadi gramapanchayath
DRINKING WATER SUPPLY SCHEME PVC WATER TANK AND ITS STEEL PLATFORM WORKS .
JALJEEVAN MISSION (JJM)-COMPREHENSIVE WATER SUPPLY SCHEME TO WANDOOR,TUVVUR,KALIKAVU, KARUVARAKUNDU AND EDAPPATTA PANCHAYATHS INMALAPPURAM DISTRICT-PACKAGE II - 1) CONSTRUCTION OF 34MLD WTP AT AMBALAPPADI 2)CONSTRUCTION OF CLEAR WATER SUMP, PUMP HOUS
ROAD RENOVATION
Concrete drain construction
Road Work
DWSS
Please refer Tender document
BUILDING
Civil Work
ROAD
OLV 2020-21 construction of parapparakunnu SCwater tank and line installation
PROTECTION WORK
Jal Jeevan Mission (JJM)-WSS to PALLICKATHODU PANCHAYATH IN KOTTAYAM DISTRICT-Package 4 (d) - (5th SLSSC) and Construction of 5LL OHSR and Sump Cum Boosting Station at Mathrumala, Distribution system from OHSR at Mathrumala and allied works
Construction of 5 Doctor ESI Dispensary including Internal water supply, Sanitary Installations, UG sump for general purposes, fire fighting and rainwater harvesting, Septic tank, compound wall with gates and Storm water drains, etc. at Chakkorathukulam, Kozhikode, Kerala.
Upgradation of flooring, Replacing of the old and damaged wastewater lines, sanitary and water supply fittings, and providing RCC lining to the existing underground sump (2Nos) in the Type III quarters of EPFO Quarters at Eranhipalam, Kozhikode.
AS PER BOQ AND TENDER DOCUMENTS
Item included in the estimate are Earth work, concrete, concrete ring, PVC pipes etc
Annual Plan 2023-24 PZR BP Pr NO 152/24 THAZHEPRA NAMBULLYKUNNU WATER TANK CONSTRUCTION AT VALLATHOL NAGAR GP-2023-24 PZR BP Pr NO 152/24 THAZHEPRA NAMBULLYKUNNU WATER TANK
Construction of 15 Lakh Litres GLSR at Edakkandikunnu, Laying Distribution system and providing FHTCs in Onchiyam Panchayath - General Civil Work
O and M Water Supply Schemes AMC 2026 27 PWSS Section Malampuzha Washing of Clarifier, Aerator, Back Wash OH Tank and Sump Grass Cutting and Jungle Clearing under Malampuzha Section for the year 2026 27 General Civil Work
OandM Water Supply Schemes Mace of CARWSS to Ranni Pazhavangadi and Vadasserikkara Desilting and washing the Clariflocculator No2 with Flash mixer and Sump in the Water treatment plant and OHSR at Anapparamala Ranni IR No 1603670 Pipeline Work
Jal Jeevan Mission WSS to Chungathara Pothukallu Edakkara and Vazhikadavu Grama Panchayaths in Malappuram District Design and Construction of GL Sump (1 LL) cum Pump House OHSR (1 LL) Pumping Main Suitable Pump sets and Distribution at Kettuungal
Pallithazham link road - Kudivella padhathy _ Construction of Water tank, Well, Pipe line laying
Providing ground water tank and firefighting arrangements at the Dam safety Organization building
Construction of water tank to U K Padi DWSS in ward no . 01
House maintenance (20 Nos), Concrete Road, Water tank, Bore well, Water distribution works.
Interconnection work- pavalla sump to Puthusserimukku-vellallur road
Refer BOQ
Clearing Jungle,demolishing cement concrete,CPVC pipe work,PCC, Hollow block masonry, repair work for plaster,Electrical work- Aluminium power cable, Underground power cable and submersible motor pump etc.
DWSS
Renovation work
road concreting
CONSTRUCTION