Loading…
Loading…
2,587 results • Best match
Super sediment filter 3m 3hr, Super Iron removal filter, Super activated carbon filter 3m 3hr, Chemical dosing pump with container, water tank aquatech 10000 ltr capacity, Foundation work for tank and WTP, Electrical and plumbing work, Monthly chemical filling charges consumables
This estimate is prepared for the urgent maintenance of new block and additional block of PWD rest house, Changanassery. Provision is given for new curtains, Rectify Roof sheet of new block , 12mm plastering with floating coat , PVC water tank etc.
RCC 1 1.5 3 in wall centering and shuttering for columns steel reinforcement for RCC work steelwork in built up tubular trusses GI roofing sheet laying PVC Rainwater pipe supplying and fixing Urinal basin polyethylene water tank Aluminum works part
laying paving block in front yard concreting yard below open stair to prevent water logging installing sink in kitchen a stand to place pvc water tank over head etc in anganwady no 40 and compound wall maintenance in anganwady no 41
Jal Jeevan Mission- Kasaragod District - West Eleri Panchayath-Constuction of Sump cum Pump house, OHSR, laying distribution system, providing FHTCs in Koovappara and Kurukoottipoyil area.-R C C and Pipe line work
Site development, Indoor stadium, Sump, Pump room, Borewell, Substation civil works, Swimming pool, Septic tank - 50-100 users Electrification for Indoor stadium, Substation, Swimming pool, Floodlighting, street lighting, Filtration and Fire fight
construction of retaining wall
Govt Secretariat Anticipated plumbing and sanitaryworkWater Tan cleaning and all other allied works for clearing blockages in bathrooms toilet and premises of secretariat campus for the period from June to August 2025 26
Desillting liquid mud, removal of liquid mud, cleaning gallery,man mazdoor for manual operation of shutter and valve,cost of HP motor, cost of hose pipe, repair of main gate and building, providing chain link fencing near the left side of dam
Jal Jeevan Mission- Kasaragod District - WSS to Puthige Panchayath and Bela Neerchal villages in Badiadka panchayath(Reappropriation)-Puthige panchayath-Construction of 60000 LL sump cum pump house, erection of pumpsets,pumping main, distribution
KLC Section 2Running Contract Urgent repairs in the existing pipes valves and allied workcleaning of sump and over head tanks in KLC campus garden for the period of six months from December 2022
JAL JEEVAN MISSION Augmentation of ARWSS to Bharanikkavu Thekkekkara Vallikunnam and Krishnapuram Panchayath Package IV Design Survey Investigation works Construction of 6LL OHSR and 1 LL Sump at Padayanivattom in Vallikunnam Panchayath Supplying
Upgradation of Government ITI Ettumanoor with Main Building Civil Works, Smart Class Rooms, Sump Tank Civil Works , Front Gate With Security Cabin Civil Works,Compound Wall, Roads And Ancillary Works, HVAC, Furniture etc
Pipe Line Replacement Extension of various size pipes and providing 1500 FHTCs, Construction of 2LL OHSR and Sump at Kulappully, 1.50MLD Water Treatment System at Mundaya, Source improvement - PACKAGE III-General Civil Work
Construction of Ambalanagar Parasparyam project Neelmbari flats 80 nos at Ambalanagar Trivandrum Building works Water supply and sanitary works security cabin compound wall and land development sump and sewage treatment plant civil work
Design and Construction of 9 MLD WTP, 9m dia well cum Pumphouse, 5LL OHSR at Mulamkunnu,Construction of sump cum Boosting station at Syonkunnu,Providing Pumpsets, Laying Pipelines, providing FHTCs and allied works.
Construction of LIFE Tower 44 units at Vijayapuram Kottayam Sub Work External works for Sump Septic Tank Rain Water Harvesting Tank Compound Wall External Lighting Pathway Retaining Wall Well Shed for Generator DGetc
Construction of Pump House
Building
Dismantling edge concrete BM patchBC overlay
for urgent special repairs and maintenance of Staff and Principal quarters at Model Residential School Keezhmad Aluva
Providing water supply connection to Govt Technical High School Kulathoor including supply and fixing of water tank having a capacity of 750 litre (3 Nos) Double coat ISI marked supplying and laying for pipe of diameter 50mm for a length of 10m
C/o Administrative Building for CRCK, NIEPMD including internal sanitary Installations, Water supply, Drainage, Internal roads, storm water drain, 2 Nos Septic tank, 2 Nos UG sump, Compound wall, Gate and Security cabin, Internal Electrical Installation & Fans, Lightning conductors , Wet riser . Automatic Fire Alarm, Lifts & VRF type Air Conditioning system, HT service Connection with Metering cubicle , RMU, Unitized substation, Cubicle panels, DG set, HT & LT cables, Street lights etc. at Chevayoor, Kozhikode , Kerala. SH: Providing Internal EI, Fittings to tailoring unit at terrace and Audiology room.
Construction of LIFE Tower 44 units at Kadambur Kannur Sub Work External works for Sump Septic Tank Rain Water Harvesting Tank Compound Wall External Lighting Pathway Retaining Wall Well Shed for Generator DG etc
Academic Block 1 New construction, Vertical expansion of HSS academic block First and Second floor, Synthetic court and Gallery, Water supply and sanitary works, Sump tank, Septic tank, External water supply and Electrical works
O and M Water Supply Schemes Mace of various water supply schemes under water supply section No2 Attingal Washing and cleaning the sump GL Tank OH Tank etc 3 times Part 2General Civil Work
Drainage facilites for 400M track and foot ball turf ground preparation ,drainage layers, grassing etc for 11s football turff,preliminary base formation of synthetic track, sump and pipelines for watering grass, sprinkler system, etc
Jal Jeevan Mission (JJM)-2021-22-Amboori Panchayath-Providing and laying Precast concrete tiles and Constructing returning wall around the Kurushumala Sump cum Pump House for avoid landslides.-Jal Jeevan Mission-General Civil Work
Construction, testing and Commissioning of 0.5LL OHSR at Thamarassery an da22LL OHSR, 0.25LL sump cum pump house at Kattippara and Supplying, laying, testing and Commissioning of distribution system and providing Functional Household Tap Connect
The structure is a RCC framed structure with Column foundation and walls with cement concrete block. Provisions for Water supply and Sanitary fittings arrangements and Under ground sump tankare also included in this estimate
COOLING WATER EXPANSION TANK 1000 LTR, COOLING WATER EXPANSION TANK 200 LTR, LUB. OIL SERVICE or STORAGE TANK 500 LTR, COOLING WATER EXPANSION TANK 500L, COOLING WATER EXPANSION TANK 100L, LUBE OIL SUMP TANK 150L
Upgradation of Government ITI Chengannur with Main Building and Hostel building Civil Works , Existing Class Room Converted To Smart Class Rooms , Sump Tank Civil Works, Roads And Ancillary Works, Land Development ,External Water Supply , etc
JJM 20232024 Kottukaal Grama Panchayath Design and Construction of 6.00 LL capacity of OHSR 2.5 LL Sump pump house Design supply erection commission of CF Pump transformer Power allocationand electrification of pump house at Punnaku
CWSS to Kovalam tourist area, Vizhinjam Corporation area, Kalliyoor and Venganoor Grama Panchayath- Supply, erection, and commissioning of 20HP open well submersible pumpset at clear sump for back washing of 21.9 MLD WTP at Vellayani
Ground Development works - Demolition works, Retaining wall, Compound wall, Protection wall around pond, Drain, Bore well, Indoor Stadium, Security Cabin, OH Tank, Sump tank and Pump room, Solar System, Flood lighting work and Electrification works
Providing Functional Household Tap Connections to all households of Kumaramangalam panchayaths in Idukki Supplying and laying Distribution lines in Zone II Construction of 2.10 LL capacity Sump cum PH at Choozhamkudipara and Road restoration Works
Construction of Sump Cum Booster Station at Kambipalam,GL Tank at Memal,Supplying and laying clear water pumping main from Manjalampuram to Kambipalam,Manjalapuram to Kelakam Junction towards Poovathinchola, Kambipalam to Parathode and Kambipalam to
JJM- WSS to Edamalakkudy Panchayath in Idukki Dstrict- Design and Construction of Raw water Pumping Main, WTP, Clear Water Sump Cum Pump House Clear Water Pumping Main, GLSRs, Distribution Lines and Providing FHTCs at Parappayar
PWD WORKS
(a)Design,Construction of floating Pump house at Malankara Reservoir,(b)RWPM (c) Valve Chambers bridge work etc, (d) 27LL sump cum BS, (e)Transformers and transformer rooms, (f) restoration of roads (g) other related works
Construction of LIFE Tower 44 units at Chemmanad Kasargod Sub Work External works for Sump Septic Tank Rain Water Harvesting Tank Compound Wall External Lighting Pathway Retaining Wall Well Shed for Generator DG Electrical Room etc
Design and construction of 1.5LL RCC Sump, placing 1MLD Plate Settler WTP near Pattambi bus stand area. -and Renovation of existing pump houses, Supply , erection and commissioning of pumpsets and its allied works -General Civil Work
Construction of LIFE Tower 42 units at Karimannoor Idukki Sub Work External works for Sump Septic Tank Rain Water Harvesting Tank Compound Wall External Lighting Pathway Retaining Wall Well Shed for Generator DG ElectricaL Room etc
Upgradation of Government ITI Chalakkudy with Main Building Civil Works , Existing Class Room Converted To Smart Class Rooms , Sump Tank Civil Works , Front Gate With Security Cabin Civil Works , Compound Wall , Roads And Ancillary Works etc
1)45 MLD WTP(Lamella type),(2) Clear Water Sump etc at Neeloor,(3)Supplying and Laying part of RWPM from Pothichottupara to WTP (4) 150mm/200mm/450mm/700mm DI K9 Pumping/Conveyance mains from WTP
Building plan area-42.5m x 21.5m, comprises isolated/combined footings, Plinth beam, pedestals, CLP tank foundation-2Nos, Pump foundation-10nos, Area Sump, Grade slab, area drain, earthwork, Plinth protection etc. as per detailed drawing and BOQ.
The provisions included are painting, Tile rwork, p i p e f i t t i n g , w a s h b a s i n , w a t e r closet,carpenter,plumber, masons, wood cutting, Grass cutting, water tank cleaning, septic tank cleaning etc.