Piped Water Supply Scheme Under JJM in Villages SOMLAPUR MALEGAON PASTALAIMAL BAMLA in Block AMLA Distt. BETUL construction of 50 KL -50 KL -50 KL -75 KL overhead tank 12Mtr. Staging
Retrofitting of Pipe Water Supply Scheme FHTC at Village Pindrai Padariya, Chicholi, Dhatura and RCC Overhead tank capacity 75 kl and 12 mtr staging at Subhewada of Block Nainpur District Mandla
Cleaning of over head water tanks in residential and non residential buildings at Bijuri and Baherabandh Sub Area of Hasdeo Area ( For one year)
Installation of Pressure Filter, Providing Sedimentation and Surface Clear Water tanks for proposed C.M. Operation at Baherabandh Mine, Bijuri Sub Area of Hasdeo Area.
CERTAIN REPAIRS TO LEKAGE / SEPAGE OF TOILETS CLEANING OF WATER TANKS FLOORING AND ROOF TREATMENT UNDER AGE B/R III OF GE AWC MHOW.
Custom Bid for Services - STRUCTURAL AUDIT/CONDITION ASSESMENT OF OVERHEAD WATER TANKS AND SUMPS IN BHEL TOWNSHIP BHOPAL Similar Category Hiring of Safety Consultant
Cleanliness of all Water Tank with Hydrogenic Machines for antibacterial disinfection in Municipal Corporation Area
Water Tank Toilet Seat (Odissa Pan) Western Seat Kitchen Sink Wash Besin and PVC Pipe
Construction of Water tank and Paver Block Work At Mokshdham Parisar Ward No. 02, Chand
Work of installing pole near the water tank of Ayurvedic College Shikarpura Ward No. 03.
Construction of a drinking water tank near Shivaji Nagar in Ward No. 10 (Third Call)
Construction of CC Road from Manohar lal house to water Tank at ward no 11dhar
Construction of CC Road From Bus Stand to Water Tank at Ward No. 05 Waraseoni
Construction of Zonal Office under Water Tank in Ward No. 59 under Zone No. 12
In Ward no. 25 Tilak Nagar Industry Area Behind Water Tank WBM. road construction work
ward no 11 construction and fixing of syntax water Tank with plate from near masjid
25 HP W/w Connection for Water Tank at Ward number 15 Gajanan Colony Sausar
Construction of R C C Gate And Water Tank Near Vilas Bari House Partap Pura
Construction of sanjivani Clinic near new water tank at Ravindranath Taigor ward under Zone-16.
CONSTRUCTION OF CC ROAD FROM WATER TANK TO NASIR MISTRI AT BAZARIYA WARD 02 DAMOH
CONSTRUCTION OF HYDRAULIC STOCK PILING WORK NEAR WATER TANK AT KHUNTA TOLA WARD NO 13
Ward no. 37 PCC drain construction from Chandaval water tank to Vindhya Prasad Saket house
Cleanliness of all Water Tank with Hydrogenic Machines for antibacterial disinfection in Municipal Corporation Area
Pavers block installation work around water tank outside garden in Trimurti Nagar at ward 10
Construct ladies bathroom in ambedkar nagar located near water tank at zone 9 ward 45.
Careful demolition (breaking) work of 3.00 lakh gallon water tank situated on the diversion road.
Necessary civil work in aadarsh urinal near BSF water tank in zone 16 ward 3.
CONSTRUCTION OF PATHWAY AT WARD NO 04 NEAR COLLECTORAT COLONEY WATER TANK IEC 3R PARK
Cement Concrete Work Badla Water Tank Premises in Ward No. 38 under Zone No. 19
Construction of Water Tank and Laying of Line in Zone No. 03 under Garden Department.
CONSTRUCTION OF WATER TANK AT WARD 01 NEAR AUKHA BABJI MANDIR AND DEPAL BABJI MANDIR
Construction of Water Tank and Repiar of Toilet and Renovation of Distt. Juj Bunglow Sehore
Cleanliness of all Water Tank with Hydrogenic Machines for antibacterial disinfection in Municipal Corporation Area
Construction of Ref pavers block at mukharji nagar water tank area in w.no.11 dewas
Repair and white washing work of Boundary wall at ward 25 Rajendra Nagar water tank.
Construction of the Boundary Wall for the water tank located in Ward Number 03. Indergarh
Custom Bid for Services - Cleaning of Main dip Sump Intermidian Sump for increase a capacity of Sump preparation of monsoon 202425 in Burhar VI Bottom seam V seam at Damni UG Mine Similar Category Manpower Outsourcing Services - Man-days based
Cleaning of sump at 8D to 12D in between 23L to 25L sump and 50D to 55D in between 21L to 23L sump at M. K. Seam of 5/6 Incline of Jamuna 1/2 Mine of Jamuna UGRO Sub-Area.
Cleaning of 2RE Sump of Burhar VI Bottom seam for increase the capacity of Sump and Construction of 10 Nos. Retaining wall to around 2RE Sump adjacent to 6m. down through Fault of Burhar VI Bottom seam at Damni UG mine
Retrofitting of PWSS under JJM at Village Sathaniya Block Gunour based on TW. i.c. Construction of 100KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire sch
Retrofitting of PWSS under JJM at Village Harira Block Gunour based on TW. i.c. Construction of 100KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme
Retrofitting of PWSS under JJM at Village Mutwakala Block Panna based on TW. i.c. Construction of 100KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire sche
Retrofitting of PWSS under JJM at Village Badwara Block Panna based on TW. i.c. Construction of 200KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme
Retrofitting of PWSS under JJM at Village Nachnaura Block Gunour based on TW. i.c. Construction of 100KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire sch
Retrofitting of PWSS under JJM at Village Gaura Block Gunour based on TW. i.c. Construction of 50KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme.
Retrofitting of PWSS under JJM at Village Ramkhiriya Block Panna based on TW. i.c. Construction of 75KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire sche
Retrofitting of PWSS under JJM at Village Sundara Block Panna based on TW. i.c. Construction of 50KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme.
Retrofitting of PWSS under JJM at Village Rampur Block Gunour based on TW. i.c. Construction of 125KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme
Retrofitting of PWSS under JJM at Village Tidunahai Block Gunour based on TW. i.c. Construction of 50KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire sche
Retrofitting of PWSS under JJM at Village Itwanmahgu and Puraina Block Panna based on TW. i.c. Construction of 75KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of