Loading…
Loading…
3,491 results • Best match
Retrofitting of PWSS under JJM at Village Raniganj Purwa Block Panna based on TW. i.c. Construction of 50KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire
Survey, Investigation, Design and Construction of PWSS under JJM at Village Majhgawan Shekh, Balgaha, Hinauta Mishra and Bakulaha Block Gunour based on TW. i.c. Construction of 50 KL and 75KL 12m staging RCC OHT, 20KL Sump Well , pipeline, etc i/c c
Retrofitting of PWSS under JJM at Village Gaura Block Panna based on TW. i.c. Construction of 100KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme.
New Piped Water Supply Scheme Under JJM at Village Suniyamar Mal, based on Tube wells, Construction of R.C.C. OHT 50 KL Capacity 12 meter Staging and Sump well 20 Kl capacity with brick masonry pump house Village Karauda Ryt. Block Bajag Distt.- Di
Retrofitting of PWSS under JJM at Village Devri Block Panna based on TW. i.c. Construction of 100KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme.
Retrofitting work of JJM Village Barsod mal- Atariya mal/Ryt Over Head Tank (ESR/OHT) 150 KL ,Village Bhanpur Mal R.C.C. sump well 20 Kl capacity with brick masonry pump house, Village Bijaura Mal Block Bajag Distt. Dindori based on Tube well
Retrofitting of PWSS under JJM at Village Pagra Block Gunour based on TW. i.c. Construction of 75KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme
Survey, Investigation, Design and Construction of PWSS under JJM at Village Majhgawan Shekh, Balgaha, Hinauta Mishra and Bakulaha Block Gunour based on TW. i.c. Construction of 50 KL and 75KL 12m staging RCC OHT, 20KL Sump Well , pipeline, etc i/c c
Retrofitting of PWSS under JJM at Village Manikpur Kala Block Gunour based on TW. i.c. Construction of 50KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire
Retrofitting of PWSS under JJM at Village Murachh Block Panna based on TW. i.c. Construction of 50KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme.
Retrofitting of PWSS under JJM at Village Maheba Block Gunour based on TW. i.c. Construction of 300KL RCC OHT, 50KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme
Retrofitting of PWSS under JJM at Village Gadokhar Block Gunour based on TW. i.c. Construction of 100KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire sche
Retrofitting of PWSS under JJM at Village Sakariya Block Panna based on TW. i.c. Construction of 50KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme
Retrofitting of PWSS under JJM at Village Umri Block Panna based on TW. i.c. Construction of 150KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme
Retrofitting of PWSS under JJM at Village Jardhoba Block Panna based on TW. i.c. Construction of 75KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme
Retrofitting of PWSS under JJM at Village Badagaon Block Panna based on TW. i.c. Construction of 250KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90 Days Trial Run Commissioningperiod of entire schem
Retrofitting of PWSS under JJM at Village Bhatiya Block Gunour based on TW. i.c. Construction of 75KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme
Retrofitting of PWSS under JJM at Village Tikariya Block Gunour based on TW. i.c. Construction of 75KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire schem
Retrofitting of PWSS under JJM at Village Saleha Block Gunour based on TW. i.c. Construction of 75KL RCC OHT, 30KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme
Retrofitting of PWSS under JJM at Village Dubahiya, Itwan Tilha and Amsil Block Panna based on TW. i.c. Construction of 50KL RCC OHT, Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning perio
Retrofitting of PWSS under JJM at Village Dwari Block Gunour based on TW i.c Construction of 100 KL and 50KL 12m staging RCC OHT, 20KL Sump Well , pipeline, etc i.c cost of all material and labour with 90Days TrialRun Commissioning period of entire
Retrofitting of PWSS under JJM at Village Girwara Block Panna based on TW. i.c. Construction of 100KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme
Retrofitting of PWSS under JJM at Village Sunwari Block Pawai based on TW. i.c. Construction of 100KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme
Retrofitting of PWSS under JJM at Village Manaur Block Panna based on TW. i.c. Construction of 50KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme.
Retrofitting of PWSS under JJM at Village Duraunha Block Gunour based on TW. i.c. Construction of 50KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire schem
Retrofitting of PWSS under JJM at Village Chikalhai, Pagra Chhota and Khamri Block Gunour based on TW. i.c. Construction of 50KL RCC OHT, Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning p
Retrofitting of PWSS under JJM at Village Purana Panna Block Panna based on TW. i.c. Construction of 100KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire
Construction of WBM Road From Patera Road to OHT, Near Pertol Pump and Constrution of Pipe Culvert Near OHT in ward no 01
Retrofitting work of JJM Village Chandwahi OHT 75 KL Kanchanpur Mal and Ryt OHT 75 KL and Village Gutalwah Block Shahpura Distt. Dindori
Annual Repairing of different pipe line at Gaughat OHT.
Supply work of Hand breaker at Dakshin kshetra OHT
RCC Road Repairing at Ward 51 Jwahar Nagar OHT.
Construction of Sump well in Ward 32 Kamla Nehru Park.
Annual Repair Work of Hydrant at Various Dug/Sump Well.
329800069 BEARING COLUMN FOR GALIGHAR VERTICAL SUMP PUMP 21/2"
Custom Bid for Services - sump cleaning at Rajendra UG MIne
Construction of Sump well in Ward 26 Near Manji Baba.
Procurement of Spares for OWS Sump Pump on OEM basis
Providing and errection of Single-PhaseSubmersible Motorpumpsand Rotational Moulded Polythene Water Tanks including Construction of Water Huts,Providing and Laying of GI Pipelines
P/L paver block at park near jain nagar OHT and asha rai house to vinay jain house jain nagar w-06,z-20
CONSTRUCTION OF TEEN SHED FOR BHUSHA, KHANOTE WATER TANK WORK AT GAUSHALA. UNDER MUNICIPAL COUNCIL JOURA DISTT. MORENA SECOND CALL
Retrofitting of Pipe Water Supply Scheme FHTC at Village Khursipar (B), Ramdeori, Ballamdungariya, Kokiwada and RCC Overhead tank capacity 50 kl and 12 mtr staging at Alipur of Block Nainpur District Mandla
Piped Water Supply Scheme Under JJM in Villages Chopanikhurd, Beldhana, Umadla, Kolgaon, Dedvakund, Malani, Lamghati, Themgaon in Block Bhiansdehi Distt. BETUL 50KL 75KL overhead tank 09 Mtr. 12Mtr. Staging and 20KL Sumpwell
Providing of Laying Jointing of Retrofitting of Piped Water Supply Scheme Under JJM in Villages KHEDISAWALIGARH in Block BETUL Distt. BETUL construction of 300 KL overhead tank 12Mtr. Staging and 20KL Sumpwell
CONSTRUCTION OF BT RENEWAL COAT AT WARD NO 09,11,12 AND 13 FACTORY AVANTIKA GATE TO SHRI RAJU JOSHI TO SAGUN GARDAN TO MISHRA TALAB AND WARD NO 13 NEAR OVERHEAD TANK RAISEN
Overhauling Repairing of 2 Nos 5000 GPH and 3 No. 10000 GPH Pressure filter and repair of settling tank, raw water tank and filter water tank floor at Rajendra, Khairaha UG and colonies under Rajendra Sub Area
Construction of 02 Nos.Water tank and Laying of pipe line (4 inch dia) from Surface ground water tank to UG water tank For filter water supply to SHCM and LHCM in Khairaha UG Mine of Sohagpur Area
P and L water supply pipe line from MP Jal Nigam Pariyojana, construction of new surface water tank and repairing of old surface water tank and P and F 2HP Submercible Pump at 132kV S/s Tejgarh.
Procurement of conical strainer/screen installed on primary water tank at 2x600 MW Units, SSTPP, MPPGCL, Dongalia.
Construction of Shope at Ward no. 24 near Water Tank Shahdol as per NIT And Estimate