Retrofitting of PWSS of FHTC Constructions of RCC OHT 125 K.L and 30 KL Sumpwell at vill Kalpi and 20 KL Sumpwell at vill. Dhanwahi laying and jointing of Pipeline as per BOQ of Block Bijadandi of District Mandla
Retrofitting of PWSS under JJM at Hinauta and Makhra Block Panna based on TW. i.c. motorpump, Construction of 50KL RCC OHT, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme
Retrofitting of PWSS under JJM at Kakrahta Block Gunour based on TW. i.c. motorpump, Construction of 75KL RCC OHT, 20KL SumpWell, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme
Retrofitting of PWSS under JJM at Khaptaha Block Panna based on TW. i.c. motorpump, Construction of 75KL RCC OHT, 20KL SumpWell, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme
Retrofitting of PWSS under JJM at Pali Block Gunour based on TW. i.c. motorpump, Construction of 100KL RCC OHT, 20KL SumpWell, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme.
Retrofitting of PWSS under JJM at Diya Block Panna based on TW. i.c. motorpump, Construction of 75KL RCC OHT, 20KL SumpWell, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme
Retrofitting of PWSS under JJM at Sili Block Gunour based on TW. i.c. motorpump, Construction of 200KL RCC OHT, 20KL SumpWell, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme.
Construction of 3 lakh litre capacity Over Head Tank with 20 mtr. staging height and Demolishing/Dismantling of existing 3 lakh litre capacity OHT with 20 mtr. staging height as per dismantling methodology as per NIT condition at AG colony Shastri ... capacity OHT i/c ...
CONSTRUCTION OF BT ROAD AT WARD 21 FROM MADHUR AANTA CHAKKI TO WATER TANK MANDIDEEP
Paver Block Flooring work near Sulabh Complex and Water Tank in Udiya Mohalla, Jagjivanram Ward
BED, BEDSHEET PILLOW BLANKET, MATTRESS, WATER COOLER, Water Tank, FRIDGE, CHAIR, TABLE, COMPUTER, SO (Q3)
Construction of Boundarywall near Vishram Bhawan Water Tank, Sudharnyas Colony, Vishram Baba Ward No. 44
NEAR THE WATER TANK IN FRONT OF SHIV MANDIR TEKRI SHOP NO. 8 UR Femail
SPL REPAIR TO EXISTING BDY WALL AT FAFA ASC LINE (RWA), SPL REPAIR TO OVER HEAD WATER TANK WITH CAP OF 1200 LTRS OF STATIC WKSP EME AND PROVN OF INTERLOCKING PATH WAY AND FOOTH PATH AT JCO SINGLE LIVING ACCN AT BLDG NO-74, 75 AND 76 OF DEMO BN UNDER
Repair and maintenance of various building consisting repairing of assembly stage i/c shed construction, replacement of old damaged sewer line of residential building repairing of boundary wall including provision of new gate and raising of boundary ... of water tank at ...
Retrofitting of PWSS of FHTC Constructions of RCC OHT 75 K.L. Capacity with 12 mtr staging at Village Bori and Summpwell 20 KL at Villege Makke and laying and jointing of Pipeline at Village Sagoniya of Block Nainpur District Mandla
Retrofitting of Pipe Water Supply Scheme of FHTC Constr. of RCC OHT 100 K.L. Capacity with 9mtr Staging, Constructions of 20 K.L. Capacity Sumpwell and laying and jointing of Pipeline at Village Jaidepur and Jaharmau of Block Nainpur District Mandla
Retrofitting of PWSS under JJM at Imaliya Bhurekhan and Suhajni Block Gunour based on TW. i.c. motorpump, Construction of 75KL RCC OHT, 20KL SumpWell, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of ent
PWSS at Village RAWANWARA Block PARASIA based on mini pump houses, submersible pumps, laying and jointing of rising mains, construction of 75 kL R.C.C. OHT, laying and jointing of pipe lines, household tap connections, with 24 Months Operation and Ma
Retrofitting of PWSS of FHTC and / Naveen Nal Jal Yojna (UNDER JJM) Costruction of RCC OHT, Sumpwell and Laying and Jointing of Pipeline at vill Budla, Imaliya, Orai Mal, Simaiya, Semikol Tola (Badhar) as per BOQ of Block Mandla, Mohgaon, Bichhiya
REPAIR REPLACEMENT OF EXTERNAL WATER SUPPLY REPAIR MAINT OF PUMP MOTORS BOREWELLS COMPREHENSIVE MAINT OF SCADA SYSTEM CLEANING OF OHT UG SEMI UG SUMPS DG SETS SOLAR WATER HEATERS AND REPAIR OF PUMPS CH PLANT SI LINES UNDER GE BHOPAL
Retrofitting of existing PWSS of village Joba (Patlon) and Patharkathi of Block Lakhnadon INC CONSTRUCTION of 20,30 KL R.C.C. Sumpwell AND 75 KL R.C.C. OHT 12 Mtr. staging, INC all cost OF LAB MAT 90 days trial run UNDER JJM
Retrofitting of PWSS of FHTC (UNDER JJM) 50 kl RCC OHT 15 mtr Staging and 20 KL Sumpwell at Villege Keolari and and 20 KL Sumpwell at Villege Bhanpur and Laying and Jointing of Pipeline at of Block Mawai District Mandla
Providing of Laying Jointing of Retrofitting of Piped Water Supply Scheme Under JJM in VILLAGE Titvi, kunkhedi, Bakka, MahatpurJawra, of BLOCK BHIMPUR Distt. BETUL 04 Nos. construction of 75-75 Kl, 50-50 Kl OHT 12 mtr stagging 20KL 30Kl Sumpwell
Retrofitting of PWSS under JJM at Village Barachh Block Panna based on TW. i.c. motorpump, Construction of 225KL RCC OHT, 20KL SumpWell, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme
Retrofitting of PWSS of FHTC Constructions of RCC OHT 50 K.L. at Village Maniksara, Khamerkheda and 75 K.L. Capacity at Village Chargaon Mal and laying and jointing of Pipeline at Village Kukra and Samnapur of Block Bijadandi of District Mandla
Naveen Nal Jal Yojna and Retrofitting of PWSS of FHTC (JJM) Costruction of RCC OHT and Sumpwell and Laying and Jointing of Pipeline at vill Atariya, Binori, Dharanchi, Khamhariya, Khirsaru, Lutmara, Pipariya and Boriya as per BOQ of Block Nainpur
Retrofitting of PWSS under JJM at Village Dadwariya Block Panna based on TW. i.c. Construction of 50KL RCC OHT, Sumpwell cum pumphouse 20KL, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme
Design, Construction and Retrofitting of PWSS under JJM at Village 1.BACHHODA 2.SIMROL 3.ALOTJAGIR 4.BANJARI 5.BHUWASA 6.GURLA 7.NAWADA 8.KARONDIYA 9.GHUDAWAN Block KHACHROD including construction of OHT, Sumpwells , laying and jointing of pipe line
Retrofitting of PWSS under JJM at Village Garhi Padariya Block Panna based on TW. i.c. motorpump, Construction of 175KL RCC OHT, 20KL SumpWell, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire sch
Retrofitting of PWSS under JJM at Village Phulwari Block Panna based on TW. i.c. Construction of 50KL RCC OHT, Sumpwell cum pumphouse 20KL, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme
Retrofitting of PWSS of FHTC Constructions of RCC OHT 50 K.L. Capacity with 15 mtr staging at Village Ramhepur and Sumpwell 20 K.L. at Village Sajpani and laying and jointing of Pipeline at Village Bisandhar of Block Ghughari of District Mandla
Providing of Laying Jointing of Retrofitting of Piped Water Supply Scheme Under JJM in VILLAGE Bela, Khamapur, Dori, Palaspani of BLOCK BHIMPUR Distt. BETUL construction of 4 Nos. 75Kl, 50-50-50 Kl OHT 12, 15 mtr staging 20KL Sumpwell
Retrofitting of PWSS of FHTC (UNDER JJM) Construction of RCC OHT 75 KL and 20 KL Sumpwell at Vill. Khirahni and Laying and Jointing of Pipeline at Vill Bariha, Dhutka, Baghrodi and Gubri as per BOQ of Block Bichhiya District Mandla
INSTALLATION OF 01 Nos. 7.5 HP SUBMERSIBLE MOTER PUMP SET OVER TUBELS AFFECTED WITH WATER LEVELS AND PURCHASE LAYING OF JOINTING 50 MM RISING MAIN FORM SOURCE TO OHT OF GOVT. JAWAHAR NAVODAY SCHOOL PRABHAT PATTAN BLOCK PRABHAT PATTAN BETUL DISTRICT
Retrofitting of PWSS under JJM at Village Makrandganj Simariya Block Panna based on TW. i.c. motorpump, Construction of 125KL RCC OHT, 20KL SumpWell, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of enti
Retrofitting of Piped Water Supply Scheme in Villages- Gonglai, Khodseoni -I and II, Hatta - I and II, Linga - I and II, Four Villages Block Balaghat, Including Construction of RCC OHT 50 KL 12 Mtr. Staging, At Village Khodseoni - II, Linga - II,
Retrofitting of Piped Water Supply Scheme in Village Thanegaon I, Thanegaon II, Madanpur I, Madanpur II, Sonjhara I, Sonjhara II and Nagjhar Seven Village Block Waraseoni, Including Construction of RCC OHT 75 KL 12 mtr. Staging At village Thanegaon I
Retrofitting of PWSS of FHTC Constructions of RCC OHT 75 KL with 12 Mtr Staging and Sumpwell 20 KL and laying and jointing of Pipeline at Village Kanhari Kala and Khalaudi Ryt as per BOQ of Block Bichhiya District Mandla
Retrofitting of PWSS of FHTC Constructions of RCC OHT 75 K.L. Capacity with 12 mtr staging and Sumpwell 20 K.L.at Village Padariya and laying and jointing of Pipeline at Village Koko Ryt as per BOQ of Block Bichhiya of District Mandla
Retrofitting of PWSS under JJM at Village Kamtana Block Gunour based on TW. i.c. motorpump, Construction of 225KL RCC OHT, 20KL SumpWell, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme
Retrofitting of PWSS under JJM at Village Chhaparwara Block Gunour based on TW. i.c. Construction of 75KL RCC OHT, Sumpwell cum pumphouse 20KL, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire sch
Construction of forest beat office, over head tank (OHT) & Raising of height of boundary wall at forest area to prevent entry of wild animals and development work at IIT Indore (MP) Subwork/Packages: Providing Services of Computer Operator and Messenger for day to day office work at IITIPD-I, CPWD, indore (MP)
Design, Construction and Retrofitting of Piped Water Supply Scheme under Jal Jeevan Mission at Village - 1.Tinchha 2.Berchha 3.Morod 4.Muhadi 5.Nehru 6.Ghudia 7.Nayapura Block Indore i/c constn of Overhead Tanks, laying and jointing of pipe line etc
GADORA (construction of 150 KL R.C.C. OHT 15 Mtr. staging), HUSAINPUR (construction of 100 KL R.C.C. OHT 12 Mtr. staging), PIPARAI (CONSTRUCTION OF 75 KL R.C.C SUMPWELL AND CONSTRUCTION OF 225 KL R.C.C. OHT 15 MTR. STAGING) MAITHANA (construction o
Execution of different works for installation of new MS panel protection boxes to make water supply from tube wells and sump well such as taking out of old damaged MS panel protection boxes, wooden boards and angle iron stands including taking out of
Selection of a Contractor and Empanelment of Contractors to perform different works to be performed for installation of new MS panel protection box to make water supply from tube wells and sump well such as taking out of old damaged MS panel protecti
Design, Construction and Retrofitting of Piped Water Supply Scheme under Jal Jeevan Mission at Village - 1. Banediya 2.Chander Block Depalpur including construction of Overhead tank, Sumpwell, laying and jointing of pipe line etc.
Submersible Pump 7.5 HP, Submersible Pump 01 HP, Starter 10 HP, Starter 02 HP, Water Tank 500 Litre, Water Tank 1000 Litre, Cable 4 MM, Rope, PVC Column Pipe 2 inch, Foldable Pipe 1 inch, Cable 6 MM
laying of Cable in HDFC pipe and Surface