Loading…
Loading…
3,501 results • Best match
Construction of Water Tank and Drilling of Tube well at Sub Mandi Yard Udankhedi. Distt Rajgarh
Purchasing and Installation of Water Cooler with RO, Water Tank, Ceiling Fan as per NIT Notification
Fabrication supply and erection of overhead (MS) water tank (capacity 24000 ltr.) at Tawa colony Harda
Electrification work in approach road of Constructed Hostel near Dunnhill Water Tank, Vanshswaroop Ward No. 29
Paver Block Flooring work near Vishram Bhawan Water Tank, Sudharnyas Colony, Vishram Baba Ward No. 44
Retrofitting of PWSS of FHTC Constructions of RCC OHT 50 K.L. Capacity with 15 mtr staging at Village Majhgaon and Sumpwell 20 K.L. at Village Medhi and laying and jointing of Pipeline at Village Saraswahi, Aamadadar, Padarpani and Mohgaon of NIWAS
Retrofitting of PWSS of FHTC Cons of RCC OHT 50K.L at Village Ramgadhi and Sumpwell 50 K.L Maldha 10000 ltr HDP Tank at Putarra and laying and jointing of Pipeline at Village Atariya, Saliwada Mal, Jaitpuri and Delha of Block Nainpur
New Piped Water Supply Scheme at Village Shamsherpura,Padligusai,kanarkhedi Block Biaora, Dist. Rajgarh based on tube well including installation of electric submerssible, centrifugal water motor pump and Construction of RCC Overhead tank of cap
Design and Construction of G1 and G2 Administrative Building, Canteen Building, Overhead tank, Cycle Stand , Open Shed and other miscellaneous left over building works including Electrification at Katni in connection with Katni Grade Separator Proje
CONSTRUCTION OF Boundary Wall At Near OHT Bazar Ward GARHAKOTA
Providing and fixing railing in Stairs in Sump at Jhingurda Project.
Piped Water Supply Scheme at Village Bomya block Barwani inc. installation of motor pump , construction of 20 kl Sumpwell and 50 KL RCC OHT , laying and jointing of pipe line etc work with 90 days trial run and 09 months operation and mainttenence
Piped Water Supply Scheme at Village Sondul block Barwani inc. installation of motor pump , construction of 20 kl Sumpwell and 100 KL RCC OHT , laying and jointing of pipe line etc work with 90 days trial run and 09 months operation and mainttenence
Retrofitting of PWSS of FHTC (UNDER JJM) 75 kl RCC OHT 12 mtr Staging and 20 KL Sumpwell at Villege Sunehramal and 40 KL Sumpwell at Villege Surajpura and Laying and Jointing of Pipeline at Villege Jamunpani, Piparpani, Deori, Pondimal of Block Mandl
Retrofitting of PWSS under JJM at Village Dwari Block Gunour based on TW. i.c. Construction of 100KL and 50KL RCC OHT, SumpWell 20 KL, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme.
Piped Water Supply Scheme at Village Kusamri block Rajpur inc. installation of motor pump , construction of 20 kl Sumpwell and 75 KL RCC OHT , laying and jointing of pipe line etc work with 90 days trial run and 09 months operation and mainttenence
Renewal of B.T. Road at ghandi Chowk to rampuri tiraha, ranvijay chowk to Circuite house and Strengthening of C.C. Road at Railway Road to Gopal Bari house, Dilip Radium shop to Near fajilganj OHT, lal Godown to ganesh mandir, jwalamukhi gate to jwal
PWSS under JJM at Village Barshobha, Bhadar and Bamhori Block Gunnor based on TW. i.c. Construction of 50 and 125KL RCC OHT, Sumpwel 20KL, pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of enti
Retrofitting of PWSS of FHTC Constructions of RCC OHT 100 K.L 15 mtr staging and 20 kl Sumpwell at vill Paraswah and 2 Nos 30 KL Sumpwell at vill Kathaidih and laying and jointing of Pipeline of Block Ghughari of District Mandla
Retrofitting of PWSS of FHTC (UNDER JJM) RCC OHT 100 KL 12 mtr Staging and 20 KL Sumpwell at Villege Achli, 50 KL Sumpwell at Villege Paijwara, Tindni, 40 kl Sumpwell at Villege Kathotiya and Laying and Jointing of Pipeline of Block Mandla
Piped Water Supply Scheme at Village Bazad block Rajpur inc. installation of motor pump , construction of 20 kl Sumpwell and 50 KL RCC OHT , laying and jointing of pipe line etc work with 90 days trial run and 09 months operation and mainttenence
PWSS under JJM at Village Mangrailakhurd, Kushedar and Bhatanwara Block Gunour based on TW. i.c. Construction of 02 Nos. 75KL RCC OHT, Sumpwel 30 and 20 KL, pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commission
Retrofitting of PWSS of FHTC Constructions of RCC OHT 75 K.L 15 mtr staging and 2 Nos 20 kl Sumpwell at vill Kuntidadargaon and 20 KL Sumpwell at vill Lodha, Chitapakhana and laying and jointing of Pipeline of Block Ghughari of District Mandla
Retrofitting of PWSS of FHTC Constructions of RCC OHT 75 KL Capacity with 12 mtr staging at Village Tatri, 40 K.L Sumpwell.at Village Bhongadwar and laying and jointing of Pipeline at Village Tuiyapani as per BOQ of Block Nainpur of District Mandla
Execution of different works for installation of new MS panel protection boxes with electrical works as per scope of work to make water supply from tube wells and sump well such as taking out of old damaged MS panel protection boxes, wooden boards an
Operation and Maintenance of 4 Nos 40 HP centrifugal Pump for Filling of 1000000 Ltrs Capacity of 2Nos. Over Head tank, 2 Nos. Sump of 200000 Ltrs Capacity and distribution Water Supply Pipe Line of 85 Km. Length with Minor Repair Work at Rehabilita
Operation and Maintenance of 4 Nos 40 HP centrifugal Pump for Filling of 1000000 Ltrs Capacity of 2 nos. Over Head tank ,2 Nos sump of 200000 Ltrs capacity and distribution of Water supply pipe line of 95 km length Rehabilitated Site Nisarpur tehsil
Procurement of Spares of VARAT make Sump pump model no. 65VWS-2 installed at minus level and trolley mounted pump model no. 50VHN-2 for unit no. 3 and 4of PH-II at SGTPS, MPPGCL, Birsinghpur (As per Tender Schedule) on single offer basis.
Retrofitting of PWSS under JJM at Village Khamariya Block Gunnor based on T.W. i.c. motor pump, construction of 30 KL RCC Sump well, laying and jointing pipe line, etc i/c cost of all material and labour with 90 Days Trial Run Commissioning period.
Operation and Maintenance of 4 Nos 40 HP centrifugal Pump for Filling of 1000000 Ltrs Capacity of 2Nos. Over Head tank, 2 Nos. Sump of 200000 Ltrs Capacity and distribution of Water Supply Pipe Line of 85 Km. Length with minor Repair Work at Rehabil
Different works to be performed for installation of new MS panel protection box to make water supply from tube wells and sump well such as taking out of old damaged MS panel protection box, wooden board and angle iron stand including taking out of el
Operation and Maintenance of 4 Nos 40 HP centrifugal Pump for Filling of 1000000 Ltrs Capacity of 2 nos. Over Head tank ,2 Nos sump of 200000 Ltrs capacity and distribution of Water supply pipe line of 85 km length Rehabilitated Site Nisarpur tehsil
Flanges welding of 200 mm dia MS pipes, loading at KOC work shop on departmental vehicles an unloading , transporting and laying at central sump and dismantling of 200 mm dia MS pipes line from eastern part of quarry for dewatering at Kanchan Open Ca
Operation and Maintenance of 4 Nos 40 HP centrifugal Pump for Filling of 1000000 Ltrs Capacity of 2 nos. Over Head tank ,2 Nos sump of 200000 Ltrs capacity and distribution of Water supply pipe line of 30 km length at Rehabilitated Site Nisarpur - I
Custom Bid for Services - Cleaning removal of silt malma accumulated coal and slurry coal along the haulage track lines loading point in 8 Rise panel drainage galleries in adjacent panel of UK Bottom Seam sump area of MK Seam of Meera Incline KG Su..
Retrofitting of JJM at Village Kirangi Mal OHT 75 KL Capacity 15 meter staging Village Patangarh OHT 75 KL Capacity 12 meter staging Block Karanjiya Distt. Dindori
Construction of CC Block Pavers at Namo Garden, located near the Water Tank in Ward No. 08
motor repairng, wood wool change, painting of coolers, water pump repairing, fan bearing change, water tank change
New Piped Water Supply Scheme at Village Chukalya ,Tareni 59,Nalyakhedi Block Biaora, Dist. Rajgarh based on tube well including installation of electric submerssible, centrifugal water motor pump and Construction of RCC Overhead tank of capacity
Chain Link Fenching of Padmanabh Nagar OHT Premise Under Zone no12
CASING PN 110 F MM NVE 65 315, IMPELLER CLOSED PN 212 F MM NVE 65 315, COVER UPPER PN 410 F MM NVE 65 315, WEAR RING CASING PN 501 F MM NVE 65 315, WEAR RING IMPLR PN 503 F MM NVE 65 315, GB BUSH PN 508 F MM NVE 65 315, SLEEVE IMPELLER PN 511 F MM NVE 65 315, SLEEVE HEAD PN 513 F MM NVE 65 315, SB LANTERN RING PN 518 F MM NVE 65 315, SHAFT PN 566 F MM NVE 65 315, BEARING HOUSE PN 701 F MM NVE 65 315, STUFFING BOX PN 725 F MM NVE 65 315, SB GLAND PN 730 F MM NVE 65 315, COVER BEARING ME PN 741 F MM NVE 65 315, SB GREASE CUP PN 851 F MM NVE 65 315, NUT IMPELLER PN 938 F MM NVE 65 315, NUT BEARING PN 941 F MM NVE 65 315, COUPLING FLEXIBLE PN 904 F MM NVE 65 315
CONST AND COMM OF PWSS OF VILLAGE CHIMNAKHARI OF BLOCK BARGHAT OF DISTT SEONI I/C CONST OF 20/30 KL R.C.C. SUMPWELL, CONST OF 125 KL AND 12 M STAGING RCC OHT, I/C ALL COST OF MATERIAL AND LABOUR WITH FHTC UNDER JJM
Naveen Nal Jal Yojna and Naveen Nal Jal Yojna and Retrofitting of PWSS of FHTC (UNDER JJM) Costruction of RCC OHT and Sumpwell and Laying and Jointing of Pipeline at vill Dudum Mal, Dudum Ryt, Paylimal, Pondi and Sangwa as per BOQ of Block Nainpur
Retrofitting of existing Piped Water Supply Scheme of village Nandiya Kalan Gorakhpur and Jhiri Nawalgaon of Block Chhapara District Seoni INC of 20 30 KL RCC Sumpwell const of 50 75 KL RCC OHT 12 Mtr INC all cost OF LAB And MAT under JJM
Retrofitting of PWSS of FHTC Constructions of RCC OHT 75 KL with 12 Mtr Staging and Sumpwell 20 KL at Villege Khatiya Narangi and Sumpwell 40 KL and laying and jointing of Pipeline at Village Indra (F.V.) as per BOQ of Block Bichhiya District Mand
Operation and Maintenance of 4 Nos 40 HP centrifugal Pump for Filling of 1000000 Ltrs Capacity of 2 nos. Over Head tank ,2 Nos sump of 200000 Ltrs capacity and distribution of Water supply pipe line of 85 km. length with Minor Repair Work at Rehabili
CONST OF C.C.ROAD FROM JHANDA CHOWK TO DEV MAHARAJ, SHAHID NAGAR, BABBLU BHAI HOUSE TO GALI NO 01 AND GALI NO 02, MEDICAL ROAD TO DURGA MANDIR GALI, KABITPURA BESIDE SUMP TANK, YADAV PURA IN WARDS NO.08 AND 14 ZONE NO.05 PACKAGE NO.20
Providing and Fixing of two nos. open well mono block motor pumps of 15 H.P., 40 to 45 meter head and 1000 to 1500 LPM discharge at Posti Khana sump-well and making connection of outlet pipe with existing distribution network in ward no. 09, Vidhans
Construction of 300 KL Capacity of RCC Over head tank and 150 KL Capacity Sump well, Pump House and connection in the main line of water supply of 3.2 Hect. Land Including laying of Pipe line and fixing for connection, provision and fittings 2 NOS of
C/o 2 Dormitories i/c Warden residence for Boys & Girls, 2 nos. class room & 1 no Hall for school Building and 1 no. Borewell for EMRS at Sohagpur, Shahdol (M.P.) i/c Internal Water Supply, Sanitary Installation, Drainage, Internal and External ... UG sump etc