Loading…
Loading…
2,998 results • Best match
Supply Steel body wood wool pads Evapor [ Supply Steel body wood wool pads Evaporative Desert Cooler Normal Air delivery - 3000 cubic per hours power consumption - 250W, Tank Capacity - 60 Ltr. Drain Plug, sheet thinness 0.8mm, Sump Tank Thickness 1.0mm. Fan speed 3 steps. type of blade plastic (HIP) Floor standing without caster wheels, Filter pad wood wool pads, Min length of ISI Connecting cable with 3 pin modular . plug top 5/6 Amp 2.5 mtr. Weight 17 kg , Operating Volt 240 volt AC, 50 Hz, warranty One year, Size 802x863x685 mm. Make Crompton, Symphony, Champion, Havells and similar]
Supply Steel body wood wool pads Evapor [ Supply Steel body wood wool pads Evaporative Desert Cooler Normal Air delivery - 3000 cubic per hours power consumption - 250W, Tank Capacity - 60 Ltr. Drain Plug, sheet thinness 0.8mm, Sump Tank Thickness 1.0mm. Fan speed 3 steps. type of blade plastic (HIP) Floor standing without caster wheels, Filter pad wood wool pads, Min length of ISI Connecting cable with 3 pin modular . plug top 5/6 Amp 2.5 mtr. Weight 17 kg , Operating Volt 240 volt AC, 50 Hz, warranty One year, Size 802x863x685 mm. Make Crompton, Symphony, Champion, Havells and similar]
Pipeline Extension- 63mm Dia.to 110mm Dia,and its related works and Functional House Tap Connections (FHTC) works, Reparing of Pump House, Staff quarter, OHT in Existing W/S Distribution main with all materials, labour, t and p etc. Complete
Pipeline Extension- 63mm Dia.to 110mm Dia,and its related works and Functional House Tap Connections (FHTC) works, Reparing of Pump House, Staff quarter, OHT in Existing W/S Distribution main with all materials, labour, t and p etc. Complete
Pipeline Extension- 63mm Dia.to 110mm Dia,and its related works and Functional House Tap Connections (FHTC) works, Reparing of Pump House, Staff quarter, OHT in Existing W/S Distribution main with all materials, labour, t and p etc. Complete
Survey Soil investigation Design Supply of all materials labour T and P etc. for Construction Erection Completion Testing and Commissioning of Water Supply Works such as OHT Tube well Rising Main Distribution System Pump House in Phulpur NP Azamgarh
Pipeline Extension- 63mm Dia.to 110mm Dia,and its related worrks and Functional House Tap Connections (FHTC) works, Reparing of Pump House, Staff quarter, OHT in Existing W/S Distribution main with all materials, labour, t and p etc. Complete
Pipeline Extension- 63mm Dia.to 110mm Dia,and its related works and Functional House Tap Connections (FHTC) works, Reparing of Pump House, Staff quarter, OHT in Existing W/S Distribution main with all materials, labour, t and p etc. Complete
Pipeline Extension- 63mm Dia.to 110mm Dia,and its related worrks and Functional House Tap Connections (FHTC) works, Reparing of Pump House, Staff quarter, OHT in Existing W/S Distribution main with all materials, labour, t and p etc. Complete
Pipeline Extension- 63mm Dia.to 110mm Dia,and its related works and Functional House Tap Connections (FHTC) works, Reparing of Pump House, Staff quarter, OHT in Existing W/S Distribution main with all materials, labour, t and p etc. Complete
Pipeline Extension- 63mm Dia.to 110mm Dia,and its related works and Functional House Tap Connections (FHTC) works, Reparing of Pump House, Staff quarter, OHT in Existing W/S Distribution main with all materials, labour, t and p etc. Complete
Pipeline Extension- 63mm Dia.to 110mm Dia,and its related works and Functional House Tap Connections (FHTC) works, Reparing of Pump House, Staff quarter, OHT in Existing W/S Distribution main with all materials, labour, t and p etc. Complete
Pipeline Extension- 63mm Dia.to 110mm Dia,and its related works and Functional House Tap Connections (FHTC) works, Reparing of Pump House, Staff quarter, OHT in Existing W/S Distribution main with all materials, labour, t and p etc. Complete
Pipeline Extension- 63mm Dia.to 110mm Dia,and its related worrks and Functional House Tap Connections (FHTC) works, Reparing of P.H., S.Q., OHT in Existing W/S Distribution main with all materials, labour, tools and plants etc. Complete in Deoria.
Pipeline Extension- 63mm Dia.to 110mm Dia,and its related worrks and Functional House Tap Connections (FHTC) works, Reparing of P.H., S.Q., OHT in Existing W/S Distribution main with all materials, labour, tools and plants etc. Complete in Deoria
Pipeline Extension- 63mm Dia.to 110mm Dia,and its related worrks and Functional House Tap Connections (FHTC) works, Reparing of Pump House, Staff quarter, OHT in Existing W/S Distribution main with all materials, labour, t and p etc. Complete
Pipeline Extension- 63mm Dia.to 110mm Dia,and its related worrks and Functional House Tap Connections (FHTC) works, Reparing of P.H., S.Q., OHT in Existing W/S Distribution main with all materials, labour, tools and plants etc. Complete in Deoria.
Survey design supply of all material and labour Tand P etc for construction of OHT CWR Pump house staff quarter boundary wall distribution system PLC SCADA auto mation work including commissioning testing and trial run with defect liability period
Pipeline Extension- 63mm Dia.to 110mm Dia,and its related worrks and Functional House Tap Connections (FHTC) works, Reparing of Pump House, Staff quarter, OHT in Existing W/S Distribution main with all materials, labour, t and p etc. Complete
HDPE Pipe 2 inch, HDPE Pipe 1 inch, Motor Pump 20HP, Panel Board 20HP for motor pump, Solar Heater 500 ltr, Sintex Water tank 5000ltr, Socket 1 inch, Elbow 2 inch, Elbow 1 inch, Nipple 1 inch, Union 1 inch, Float Valve 50mm, Cement, Sand, Agg 20cm, PPC Block, Quick setting compount
4 MM Heavy Galvanized Iron Sheet with Fittinh Charge for Training Logistics Cabin, 2 MM Heavy Galvanized Iron Sheet with Fittinh Charge for Training Logistics Cabin, 1 MM Heavy Galvanized Iron Sheet with Fittinh Charge for Training Logistics Cabin, ... Layer water Tank with ...
Wooden almirah, Washbasin rack, Kitchen Rack, Kitchen cupboards, Kitchen Self, Basin Self, Peg Table, Dining Table with six Chairs, Appointment Board, Cap and Cane Stand, Trophy Stand, Plastic Water Tank, Door Mesh, Instant Geyser, Geyser High Duty, Invertor with Battery and Stand, Staff Room 4 seater Work Station, W S Chairs, Storage
AIC marking boards, VSL marking boards, 6 ft marking poles, Water tank steel, Bracket for batteries, Weapon carry brackets, Marking store box, Red flasher, LED static blinker, Veh follow me lights with plate, Jerry can bracket, Pole carrier 04 per veh, DZ marking boards, Angle iron, HHTI Bracket, Traffic control light sticks
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - 132KV SS Kirawali Agra; Complete rewinding of 3 7KW 1430 RPM 50 117 3 phase 415 V sump pit motor installed 132kV S/S Kirawali Agra; Which includes dismantling of motor a..
Electrical work in connection with Provision of First foot over bridge with cover shed at 5 Station of N.E.Railaway LJN Div, Provision of essential items for Goods shed like Tarpaulin , Major Improvement work like Extension of PF No. 02 & water ... RCC OHT , ...
Improvement to passenger amenities at JKNI Halt station, Major improvement work like extension of PF no.2, water supply pipeline and sanitation & Provision of RCC OHT (50000 Gallon) with 01 no. deep tube well (900') etc. at SDDN in LJN Division, ... RCC OHT (50000 ...
CONSTRUCTION OF OHT CWR PH AND OTHER BUILDING WORKS AND SUPPLY LAYING JOINTING OF RM DS HHC TWs REBORE PLC SCADA AUTOMATION WITH REPAIRING AND FUNCTIONING OF EXIST WATER SUPPLY INFRA FOR SATURATION COMM TESTING TRIAL RUN HAND OVER TO NPP ETAH
Construction of 1 No deep tube well, RCC OHT 175KL and 15m staging Laying and Jointing of approx 5891 meter of Distribution System and 30M Rising Mains and Bye Pass comprising of DI and PVC pipes House connections Pump House Boundary Wall
Construction of 1 No deep tube well RCC OHT 350KL and 18m stagin Laying and Jointing of approx 23200 meter of Distribution System and 30M Rising Mains Bye Pass comprising of DI and HDPE pipes House connections Pump House cum chloronome Boundary
Welding Rod, Seal Kit Lift Cylinder, Hose Tank to feed Pump, Hose Feed Pump to Dual Filter, Hose Dual filter to Injection Pump, Hose Sump to Pump, Hose Lift Cylinder, Cable Engine Stop, Seal Kit Lateral Steering Cylinder Assy, Stud Nut, Hydraulic pipe, Hydraulic Seal
Custom Bid for Services - Mechanized cleaning of Admin building, Staff Canteen, Main Lab, Sectional Offices & Intensive cleaning of Toilets, Urinal, Washbasin, water cooler and Cleaning and de-silting of underground & open drains, manhole, and sump o.. Similar Category Cleaning, Sanitation and Disinfection Service - Outcome Based
As per tender documents
Wall Clock, Medal, Digital Clock, GOC Stick Cane, Coaster Wooden, Coaster Steel, Solo Mobile Stand, Solo Pen Stand, Large Towel, Medium Towel, Small Towel, Computer Table, Inner Cloth, Washbasin, Towel Stand, Steel Tank, Steel Tap, Wooden Washbasin ... Stand, Water Tank Stand, ...
Plaster for Courtyard and Porch, Excavation, Wall and Concrete passage, Scrubbing, Plaster of wall, Dismantling, Painting, Water Tank 1000L, 4 inch pipe, Repair of Toilet with commode, Repair of 1 Bathroom, Light points in Rooms, Light points in Hall of size 30 feet into 18 feet, Change over Switch, 4 way TPN, Rewiring, Window work Welding and wire mesh
Feed laoding Tray, Washing Tub, Stand for Drying feed, Trolly for loading and unloading, Platform for feed Sliding frame, Cover rack for recovering unused and uncut feed, Tub for Trolly, Water Tank with Iron Stand with plumbing piping shower tapping etc, Water treatment plant with RO system for cleaning purpose, Miscellaneous work Wall cutting Roof after cementing
Construction of 1 No deep tube well RCC OHT 100KL and 12m staging Laying and Jointing of approx 6934 meteKM of Distribution System and 30 M Rising Mains and Bye-Pass comprising of DI and PVC pipes House connections Pump House cum chloronome Bounda
Strengthening of 36.00m wide road in sector-1, Chanakyapuri to Prevesh Vihar and Strengthening of 30.00m wide road OHT chauraha, sector 3 to Meerut nala under Ht line and Strengthening of Roads in Block A and Block B of Somdutt City in Scheme No. 11,
Drinking Water Cooler Drinking Water Cooler ( 24 ) Technical Specifications Specification Specification Name Values Allowed Values CAPACITY/ENERGY TYPE Storage - Cooling Capacity Litres/Hour 40 Liters/hour 40 Liters/hour, 60Liters/hour, 150 ... 1/2 Water Tank sheet ... - Water Tank cover ... - Water Tank cover ...
SET OF CON ROD BEARING STD, CONNECTING ROD BRG SET FOR PIVOT DIA 32, GASKET INTAKE MANIFOLD, GASKET WATER PUMP, GASKET THOTTLE BODY, OIL SUMP GASKET, PART KIT POWER STEERING, SIDE COVER GASKET, HOSE 8X300, FRONT ANTI ROLL BAR KIT, PISTON RING KIT, VALVE KIT, SEAL VALVE STEM
Mixer and Grinder 230V or 50HZ oblique 750W Make Philips, Hot and Cold Invertor Split AC 2 Ton Make Voltas, Stabilizer 4kw for AC 2 Ton, Wall Mounting RO Water purifier System Production Rate 20 Ltr per Hrs Single Phase 230V AC 50Hz, Air Cooler, ... inch Water Tank Capacity ...
Ridger Complete as per specification alongwith one extra hub with Bearing, Nut Bolt, Washer 9.52 mm, Washer 6.35 mm, Harrow Bush 152.40 mm, Harrow Nut, Harrow Cup Nut, Harrow Inner Lock, Harrow Pipe Side Plate by Round Plate, Square Rod 25.40 mm For ... Pipe, Water Tank 500 ...
Chalk, SR Register, Student Attendaance Register, Trachers Dairy, Duster, Chart paper, Form, Register, Whitner, Marker Board, A4 Paper, Gum, Pen, Stapler, Scissor, Wall Clock, Lock, Calculator, Stamp pad, Phenyl, Chuna, Phool Jadhu, Dustbin, Wiper, ... Danka, Water Tank 500ltr, ...
Iron Stap Ladder Pkg, Wall Painting Par Mtr, Lathe Machine Repairing, Plastic Water Tank 750 Ltr, Subersible Pump Repairing 2hp, Copper Wire 16 Mm Mtr, AC Stalation Gas,copper Pipe 2 5 Ton, Pandent Holder 6 Amp, Batten Holder 6 Amp, LED Bulb 30 Watt, LED Bulb 40 Watt, Mobil Oil Par Ltr, Grease Par Kg, Wall Pvc Pannel Par Sqr Fit
Long Body Tap, Short Body Tap Bib Cock, a Angle Valve, Pillar Cock CPVC, Basin Mixture, Basin Jali, Waste Pipe Wash Basin, Sink Jali, Extension Nipple, Ball Valve, Ball Cock, 2 Way Angle Valve, 2 Way Bib Cock, Jet Sprey PVC, Helfa Set, 1Pcs. Seat ... Socket, Water Tank Cover ... 500Ltr., Water Tank Cover ...
Piston Rod of No 332 Y7750, Earthing Complete set, Paint OG Green Asian Paints, Grease High Grade, Repair kit for collapsable water tank including valve, Drag Drill bit of Rig borewell, Fuel water separator SS304 acrylic glass, Maal truck clutch plate, Maal truck wiper blade, Break light, Front main mirror, Truck Side Mud Guard, Compressed Air Filter Compressor, Hydraulic Oil STAROL Hydstar AW 68
Border Painting and writing work at clasrooms, Grass cutting work backside of four workshop and at frant of it lab par sqr mtr, Workshop and classroom cleaning work par day, Fan repair, Water tank cleaning par tank, Window glass repair without glass par sqr fit, Solar battery stand manufacturing work par pcs, solar plate and battery bank cleaning work par pcs, Cleaning of campus par sqr mtr
CP Mixer centre hole basin mixture 15MM w oblique o pop up waste system Make Prayag oblique Pearl, Stainless steel knob lock for door lock Make Classic oblique Crown, Bib cock 20mm Brass Make Prayag oblique Pearl, Lid for Sintex for 1000 ltr, PVC ... PVC water tank with ... PVC water tank with ...
M - Seal as per IS 9197 (Q3), Sinks (Q3), European Pattern Toilet Seat Vitreous China (Q3), Toilet Seat - Indian Style Squatting Pan (Q3), Urinal Bowls as per IS 2556 (Part 6) (Q3), Sinks/Wash Basins - Vitreous China as per IS 2556 (Part 4) (Q3), ... PVC Water Tank triple ... PVC Water Tank triple ... PVC Water Tank triple ... PVC Water Tank triple ...
The work of complete general AN Round the clock wise cleaning , shifting of spilled/slurry coal to coal yards , cleaning of bunkers and track hoppers from inside, removal of chocking chutes, crushers etc, checking and operation assistance of all
Cooler Exhaust Fan with inbuit fully enclosed Motor Voltage: 230V AC single phase. No. of Poles: 6, SPARE FOR DESERT COOLER: DESERT COOLER BODY OF 22 SWG G. I. SHEET. SIZE OF COOLER WITH WATER TANK - L, SPARE FOR DESERT COOLER: WOODEN GRASS (Wooden Cooling Pads) FOR DESERT COOLER. TO BE SUPPLIED IN SMA, COOLER PUMP(SUBMERSIBLE PUMP) REQUIRED FOR DESERT COOLER. -LIFT WATER: 5 FEET. -MATERIAL: PLASTIC -F