Loading…
Loading…
5,635 results • Best match
up keeping of chira for water distribution to crops, providing ring bund for forming chira, regulating water and maintaining chira, keeping chira articles in safe custody, Supply of wooden planks forreplacing damaged shutters , painting etc
Estimate includes provision for applying putty, plastic emulsion and exterior emulsion painting,acid washing the toilet , melamine polish for wood work,engaging coolie and plumber, name board,hire charge for JCB,110mm PVC pipe etc .
In this estimate Dismantling doors windows and clerestory windows steel or wood shutter Dismantling tile work in floors 12 mm cement plaster Painting Providing and fixing glazing in aluminium door window ventilator shutters and partitions
Construction of a 40m high Ground Based Tower (GBT), including transportation of tower materials from Muttuchira RP 03264 GBT, foundation construction, erection, painting, and earthing at the new site at Staff Quarters compound, PALA, Kottayam
keeping of chira for water distribution to crops providing ring bund for forming chira regulating water and maintaining chira keeping chira articles in safe custody Supply of wooden planks for replacing damaged shutters and painting
Civil works in connection with Renting out of A-BLOCK at the fifth Floor to Kerala Motor Thozhilali Kshema Nidhi Board at BSNL SANCHAR BHAVAN BUILDING Kovilakathumpadom TRICHUR SW Internal Painting and Miscellaneous Civil Works
This estimate includes balance works of the construction of new building for Homeo Dispensary Kalloorkad Balance works includes the following Vitrified tile flooring for rooms Rectified tiles for ramp Stainless steel handrails for ramp Painting
Civil works includes PCC, RCC work, Solid block masonry, plastering and painting, granite and tile works, aluminium work and glazing for doors, windows, ventilators and partitions,curtain wall,particle board, taking out existing window shutters
Construction of 24 m Roof Top Tower at Kumbalam near NH Toll plaza RP 02058 including dismantling existing roof top tower at Shastri road Kottayam Transportation Erection Painting Earthing and foundation for BTS DG Battery
The estimate includes earthwork excavation for the retaining wall, PCC and RCC work for the RCC retaining wall, solid blockwork for the compound wall above the retaining wall, plastering, and painting for the compound wall
supplying, fabrication of built up structures using steel pipes and fixing precoated galvalume sheet roofing along with suitable fasteners, painting with anti-corrosive paint. The structure shall be strong enough to withstand wind and weather.
Provision included in the estimate steel,cement concrete,plastering ,primer,painting, lock,solid block masonry,centering,granite ,synthetic enamel paint,Rcc,rain water gutter pipe,ms grill,bailing out water,bullet proof glass etc complete.
Concrete kerb, Interlocking tile, Steel pipe railing, Retro-reflectorized sign boards, Synthetic enamel paint, Thermoplastic compound, Road studs, Epoxy painting, Excavation, Dismantling culvert, PCC1 3 6, PCC M20, PCC M15, RCC M20, HYSD bar etc.
Clearing thejungles Painting and applying lubricating oil grease to the shutters construction of damaged portion of compound wall etc Due to theshortage of workers under this section Provisionfor man mazdoor for spillway duty during emergency
Demolition of damaged concrete jally bricks works of compound wall in the main and outer yard and retrofitting the compound wall with new solid blocks, plastering and painting the compound wall throughout the substation premises.
The provisions in the estimate are dismantling tile,water proofing treatment ,ceramic tile,epoxy grouting, European and Indian closets,wash basin,soap dish ,mirror,health faucet,F.R.P door ,repair of plaster,scapping,primer,painting,etc
Outside painting of KSINC Head Office building (5 storeyed), repairs to compound walls, repairs of plumbing and sanitary system, repairs to Diesel Generator shed, filling up of sunken ground and laying CC paver blocks etc..
rain water leaking inside It seems that the painting of the building is very sad condition And also the window and ventilator glazing frames of doors etc are damaged due to no proper periodic m
Earth work excavation RR laterate and solid block masonry Quarry muck filling RCC work TMT steel reinforcement Aluminium works Plastering Painting Tiling Interlocking Structural steel work providing fibre ceiling water supply and sanitary works etc
Dismantling roofing tile Wood work Concrete Brick work Laterate masonry Cement Concrete Steel Reinforcement Painting emulsion Steel work tubular section tubular purlin GI iron profile sheet Aluminium work for doors windows Ceramic glazed floor tile
The estimate includes roof truss to the existing building in order to prevent leakage at rainy season and provisions for steel staircase Painting of building floor tiling of store room laying cement concrete tiles etc
This estimate is prepared for Maintanace of Old Building District Vetenery Hospital.This Estimate includes painting with plastic emulsion,Ceiling rearranging ,powder coated aluminium work,Fooring with vitrified tiles,wall tiles,GI Weld Mesh,Steel wor
The work is arranged for renovation of House surgeon hostel women and paramedical hostel The following provisions are arranged internal painting cup board work kitchen renovation truss work sheet roofing leak rectification tiling sanitary work
putting up ring bund up keeping the chira,watching regulating and distributing water and painting with anti corrosive bituminous black paint one coat after rubbing with sandpaper and clearing the surface of woodenplanks, casing etc
Earth work excavation and PCC for foundation Randum rubble masonry for foundation. Solid block masonry RCC and steel work Plastering, painting and tile works for security cabin Sanitary and plumbing works Aluminium works for doors
Earthwork excavation PCC RCC Dry rubble masonry Random rubble masonry Centering and shuttering Laterate masonry plastering Fencing with angle iron post Finishing with Deluxe Multi surface paint Steel work in built up tubular section Painting
The provisions included are painting Tile work pipe fitting wash basin water closet carpenter plumber masons wood cutting Grass cutting water tank cleaning septic tank cleaning roof top concreting design mix 1 2 4 etc
The provisions in the estimate are for clearing the debris from the site, providing an RUbble masonry for foundation basement, RCC belt over the Basement, solid block masonry compound wall,C.C.Top belt , plastering and painting
As per the request of inmates of C17 quarters this estimate is prepared The provisions included are dismantling the damaged wall plastering and replastering the sameDismantiling damaged wooden ceiling and providingnew false ceilinginside painting etc
The provisions included in the estimate are dismantling plastering, solid block, waterproofing, FRP doors for duct and toilet, plumbing fitting and accessories for duct and toilets, emulsion, enamel painting, vitrified wall and floor tiles etc.
The estimate for reconstruction of culverts EW excavation Dry rubble packing PCC M15 abutment and M20 slab with HYSD bars parapet painting Irish and deep drains BM patch and BC Overlay traffic safety measures estimate
The proposed project involves the reconstruction of a small stretch of the retaining wall, painting of building, interlocking tile paving, and other repair works for the staff quarters building at the Thommankuthu Eco Tourism Centre.
The scope of the work includes repair works such as scraping and removing , cement primer, emulsion painting and providing particle board partitions with aluminium frames and also provide aluminium sliding windows and cleaning the premises.
dismantling for damaged doors and windows, damaged roof sheet and roof members,patch plastering,flooring with vitrified tile,FRP door for toilet and other doors, GI section for roof and corrugated sheet, painting,sanitry fitting
Provision included inthis estimate are aluminum partition with particle board and glass cement board ceiling and structural steel work for supporting ceiling painting and renovation of toilet with rectified ceramic tile and sanitary fittings etc
PCC RCC Random Rubble Masonry Solid Block Masonry Plastering steel windows and doors Grill door frame and 30 mm shutter of Solid PVC Aluminium Tile Putty Painting Railing Interlock plumbing and Electrical network and Furniture
The items included in this estimate are demolishing brickwork constructing partition walls using solid blocks its plastering painting laying ceramic floor and wall tile fixing PVC doors European closets Indian water closets health faucets etc
This estimate includes the repair works and labour works for the entire year for the maintenance of rest house Changanassery. Maintenance provisions such as painting, tile work and window shutters are included in this estimate.
PCC, RCC, RRM, SBM, Plastering, supply of steel windows and doors , Grill Works, fixing factory made door frame and 30 mm shutter of Solid PVC, Aluminium Works, Tile, Putty, Painting, Railing, Interlock, plumbing and electrical
The main items incuded in the estimate are vitrified floor tiles with grouting aluminium windows ventilators wall shelf with rack and shutter over all painting of the building mosquito mesh changing of damaged sanitary fittingsetc
AS PER BOQ AND TENDER DOCUMENT
Please refer the tender documents
Construction of building, paining and tile work
Building work
Urgent Special Repair
Maintenance work
Dismantling the existing polycarbonate roofing and replacing it with 6 mm thick multi wall polycarbonate roofing and making good the existing truss member and reducing spacing between purlins by incorporating hollow sections in between, painting, etc
PART-1- Civil works- dismantling of aluminium and cement concrete roofing, tile works, oldplaster,scaffolding,waterproofing,PCC,vitrified tile,painting,door windows, ACP, Paver block ,Lift work etc. Plumbing works and PART 2 -Electrical works ,AC
This estimate is prepared to construct a Pharmacy store and Dining room for patients and bystanders near Ward - 2. The provisions included in the estimate are Earth work, Brick work, Plastering, Painting, tiling, Aluminium works etc.