Loading…
Loading…
5,635 results • Best match
Works including Solid CC block masonry, RCC for roof slab, plastering, painting, Ceramic and vitrified tile work, pressed steel door,Grill and aluminium work for windows, yard tiling, sanitary installations and man mazdoor for cleaning works
Renovation and repairing of valve house building and connected structures of Panniar HEP-Repair of damaged wall plastering, reclaiming of doors and windows,painting ,repairing damaged drainage systems and providing GI profile sheet roofing over roof
DR masonry for foundation, R.R masonry for basement and M20 concrete for all reinforced concrete works. Also all joinery works are shown in wood.ceramic tile proposed for flooring due to fund limitation. emulsion Painting also included.
Construction of a 40m Ground Based Tower (GBT), including transportation of tower materials from the Perinad BA store, construction of the foundation, erection, painting, and earthing at Oachira Railway Station under IX.2 Project, Kollam BA.
Demolishing brick work Solid block masonry Centering Shuttering RCC works Plastering Tiling Aluminium works for doors and windows Particle board work Providing MS hollow tube framework GI sheet work Painting False ceiling with calcium silicate tiles
clearing jungle solid block masonry for ramp filling excavated earth cement concrete1 2 4 chequered tile inter lock grill for veranda hand rail for ramp painting cleaning water tank sanitary fittings and electrical maintenance works etc
This work arranged for renovation this included renovation of existing kitchen new toilet mosquito mesh for all windows new cupboards inside all rooms new utility area at terrace external painting and provision for new badminton court.
This estimate included painting of Rest shelter, repairing of tile work in exporting auction hall and balance tile work in dormitory. The door shutter of Electial room in auction hall hall have been distroyed by rust.
The provisions in the estimate include providing boundary stone, total station survey for locating the exact points, jungle clearance, painting the old alignment stones etc. Total amount comes to Rs.16.59 Lakh including 18 percentage GST.
item for level measurement wmm BM and BC and necessary road safety reconstruction of the drain and providing footpath facilities with handrail and painting. Excavation filling with granular material PCC M15 side wall wearing coat kerb
The items included in the estimate are dismantling the existing culvert, Earth work, DR packing, PCC for culvert base and drain, M15 for side wall of culvert and drain, RCC m20 for culvet slab and painting
Construction of new single storeyed framed structure of plinth area 113.32 m2. Foundations with reinforced cement concrete works, walls with solid block masonry, wood work,flooring,painting, construction of a compound wall with gate,electrical, etc
Painting, RCCwearing coat, side concreting, replacing tiles of bath rooms, covering the roof top area for storage purpose, sanitary and plumbing, dismantling the existing damaged walkway and construction of new walkway/divider and side kerb necessar
Provision for replacing damaged tiles on sunshade with new one fixing rain water gutters Painting newly fixed tiles and existing tiles on sunshade are included in this estimate. Dismantling MP tile Providing and fixing scaffolding system
The scope of the proposed work includes construction of a single storied building with rubble masonry for foundation, superstructure with solid block masonry, reinforced cement concrete works for lintel, beam, roof slab etc, plastering and painting
This estimate is prepared incorporating provisions for Dismantling tiled roofing . , Repairs to plaster of thickness 12 mm to 20 mm, Painting with black anti-corrosive bitumastic paint for the roof membersSupplying and fixing Anjily wood reape
This estimate is prepared.As per request from AEE,Bridges sub division.Left side yard of the office requires interlock paving.Painting also needed. The items included in the estimate are painting,weld mesh, man coolie ,aluminium work etc.
It is framed structure and mainly includes earth work, PCC 1 4 8, RCC 1 1.5 3, Random Rubble Masonry, Solid Block masonry, Cement plastering, painting, Flooring with cement grout etc.Electrification are not included the estimate.
The provisions included in the estimate are clearing jungle drain plumbing Works sanitary works removing broken tiles and laying new ones painting relaying for damaged tile constructing manholes clearing filled up manhole and water proofing works
The main items included are plumbing and sanitary fitting and maintenance works repairing and replacing of door window shutters with fittings engaging plumber carpenter man wood cutter yard cleaning wall patch painting etc mainly in oldRH
Earth work excavation CC 1 4 8 Centering shuttering RCC work Steel reinforcement Interlocking Plastering Demolishing brick work and stone rubble masonry RR masonry Solid block masonry Painting with deluxe multi surface paint Quarry muck filling
Dismantling old asbestos sheet, wooden purlin rafters, brick pillars, 5 wooden post, two parapet wall. escavation and concrete work, hosting of truss work and laying tile profile sheet with ridges, PVC rain water gutter, painting etc.
Demolishing brick laterate work Demolishing stone rubble masonry Demolishing CC Laterate masonry RR masonry Dismantling old plaster Plastering Painting Earth work excavation CC 1 2 4 Structural steel work Barbed wire fencing Dry stone pitching etc.
The work include items such as painting allwalls,repairing of doors and windows, replacing doors andwindows,flooring with vitrified tiles, flooring and dadoing walls of the toilets,replacingdamaged reepers, rafters and ceiling in roof, replacing ro
This estimate includes earth work,PCC,DR and RR masonry foundation and basement , RCC belt,back filling,solid block plastering, 12 mm,9mm,6mm plastering, painting, Wall tile, Flooring tile works, rolling shutters, Sanitary fittings etc
Demolishing CC dismantling tile work earthwork in excavation RR masonry 1 4 8solid block masonry RCC 1 1.5 3 centering and shuttering steel reinforcement plastering scrapping prime coat painting ceramic glazed wall and floor tiles etc
work includes hacking of CC Flooring, Providing and laying vitrified floor tiles, antiskid ceramic parking tiles, Wall painting with plastic emulsion paint and synthetic enamel paint, fixing aluminum work for partion,Thomson multi wood for storage.
Maintenance work of GBT RTT GSM Towers including supply of missing bolts members checking tightening of all bolts painting and allied work of different heights of towers located at different places in Calicut BA PHASE I
Patchwork of KIP canal shutters Patchwork, painting overhauling of various canal shutters SBC offtake at ch 44015m of RBMC, Pannivizha cross shutter at ch49115m of RBMC and overhauling of hoisting mechanism of 14th mile cross shutter
Construction of a 40m high Ground Based Tower (GBT), including transportation of tower materials from the Neendoor GBT compound , foundation construction, erection, painting, and earthing at the new site at Pala Court compound, PALA , Kottayam BA
Dismantling of 21 m Roof Top Tower at Kandanadu Kavala RP 003621 including dismantling existing roof top tower Transportation to SSA Store Erection of RT Tower at nearby site including rcc framework foundation including Painting Earthing
Concrete kerb, Interlocking tile, Steel pipe railing, Retro-reflectorized sign boards, Synthetic enamel paint, Thermoplastic compound, Road studs, Epoxy painting, Excavation, Dismantling culvert, PCC 1 3 6, PCC M20, PCC M15, RCC M20, HYSD bar etc.
Dismantling doors and windows Dismantling tile works Ceramic wall and floor tiling Aluminium work for doors and windows Plastering Painting Demolishing brick work and cement concrete Vitrified tile flooring wood work for doors Sanitary fittings etc
In compound wall proposed for Kurichi Govt.ITI Building.RR masonary is proposed for foundation and retaining portion and above this RCC belt is also proposed.Wall is proposed using precast solid blocks.Finishing works plastering and painting is als
dismantling doors windows plastering ceramic glazed floor tile wall tiles painting deluxe multi surface paint system synthetic enamel paint aluminium work doors and windows upvc door shutter and frame white vitreous china pedestal type water closet
solid block work,PVC cladding false ceiling flooring new toilet construction and necessary provisions such as plumbing works sanitary works waterproofing floor and wall tiling ceiling etc for the toilet area.And also included painting aluminum p
The estimate includes provisions for repair to plastering, vitrified and ceramic floor tiles, GI sheet roofing,Painting, FRP and PVC door frame and shutters, closet, washbasin, sink and other sanitary installations and water supply items etc.
Items proposed in this work are providing PVC false ceiling,inside painting of walls,dismantling some windows and close it with solid block masonry,its plastering, providing aliminium work for windows (fixed and window shutter) etc.
This estimate is prepared for the balance work of 5nos toilet and miscellaneous work in blood bank (3rdfloor) at Medical College Hospital Provisions included in the estimate are plastic emulsion painting for wall,Solid masonry etc.
The necessary provisions for two toilets with ramp such as Earth work for foundation, CC for Foundation, M 20 mix for plinth beam, slab etc., Solid Blocks, Plastering works, Painting Ceramic flooring Plumbing and sanitary works.
Clearing the jungles,Painting and applying lubricating oil and grease to the shutters etc. Due to the shortage of workers under this section, Provision for man mazdoor for spillway duty during emergency time for operating shutters
Earth work excavation, PCC, RCC, RR masonry, Laterate masonry, Solid block masonry, wood work, MS grill, plastering, painting, Tiling, cladding, PVC door, Name board, Space frame(Ball Node Type), Poly carbonate sheet, Electrical and plumbing work
dismantling fencing and fencing post, demolishing RR masonry skirt wall, dismantling existing gate to yard, earth work excavation, RR masonry , fencing,construction of new gate pillars,plastering the pillars and top of skirt wall, pointing, painting
Earthwork excavation PCC RCC works Filling dept and contractors earth Laterate Solid block and RR masonry Plastering Painting Tiling work Aluminium works for doors and windows Fixing pre laminated particle board aluminium composite panel cladding etc
This works include items painting all walls, repairing doors and windows, replacing the doors and windows, flooring with vitrified tiles, flooring and dadoing walls of the toilets, replacing damaged reepers, rafters and ceiling in roof,repla
PCC, RCC, Random Rubble Masonry, Solid Block Masonry, Plastering, steel windows and doors , Grill Works, factory made door frame and 30 mm shutter of Solid PVC, Aluminium Works, Tile, Putty, Painting, Railing, Interlock, Plumbing and electrical
Maintenance work of GBT RTT GSM Towers including supply of missing bolts members checking tightening of all bolts painting and allied work of different heights of towers located at different places in Thrissur BA PHASE 1
PCC, RCC, Random Rubble Masonry, Solid Block Masonry, Plastering, steel windows and doors , Grill Works, Providing door frame and 30 mm shutter of Solid PVC, Aluminium Works, Tile, Putty, Painting, Railing, Interlock plumbing and electrical works
PCC, RCC, Random Rubble Masonry, Solid Block Masonry, Plastering, steel windows and doors , Grill Works, factory made door frame and 30 mm shutter of Solid PVC, Aluminium Works, Tile, Putty, Painting, Railing, Interlock, Plumbing and electrical
PCC, RCC, RRM, SBM, Plastering, supply of steel windows and doors , Grill Works, fixing factory made door frame and 30 mm shutter of Solid PVC, Aluminium Works, Tile, Putty, Painting, Railing, Interlock, plumbing and electrical works