Loading…
Loading…
7 live7 closing this weekmost from CPWD and Add. Secretary (Urban Development)
7 results • Best match
Development of car parking near mukteshwar market.(Electrification Work)
SELECTION OF OPERATOR FOR PAY AND PARK FACILITY ON LICENSE FEE BASIS AT INTEGRATED INDUSTRIAL ESTATE SITARGANJ
Design and construction of 300 bedded including 50 bedded super speciality hospital 2 basement plus ground plus 6 floors multilevel car parking ground plus 10 storied Type 2 28 nos, stilt plus 7 floor Type 3 18 nos Stilt plus 9 floor Type 4 12 nos ... in Parking Area
Design and construction of 300 bedded including 50 bedded super specialty hospital 2 basement plus ground 6 floors multilevel car parking ground plus 10 storied Type II 28 Nos stilt plus 7 floors Type III 18 nos stilt plus 9 floor Type IV 12 Nos stilt plus 6 floor Qtrs including all internal and external civil electrical and mechanical services and horticulture work at ESIC Haridwar Uttarakhand in EPC mode Design and Build Basis SH Providing Inspection Vehicle on hier basis for AE and Manager C 2 Uttarakhand Projects CPWD Rishikesh
DEVELOPMENT, OPERATION AND MAINTENANCE OF TEMPORARY WAY SIDE AMENITIES AND PARKING INFRASTRUCTURE IN THE IDENTIFIED PERIPHERAL LAND UNITS DURING KUMBH MELA 2027 IN HARIDWAR
INTEGRATED SECURITY SURVEILLANCE SYSTEM SERVICE - Theft Prevention, Parking Lots, Employee Safety; Recording Devices; Maximum security footage; Buyer’s premises
Cleaning, Sanitation and Disinfection Service - Outcome Based - Office/Commercial/Institutions/Residential; General Cleaning (Sweeping, Mopping, dusting); INDOOR OUTDOOR GARDEN AREA, PARKING AREA GUEST HOUSE OFFICE CABIN