Loading…
Loading…
1,830 results • Best match
SLIP YOKE ASSLY BS-2 & BS-3 P4503139, TUB YOKE AC BUS P4500632, SLIP YOKE ASSLY BS-2 & BS-3 2576 4112 0121, U. J. CROSS KIT TATA TC BS-2 & BS-3 8854 4121 1612 Or 2576 4111 0141, U. J. CROSS KIT BS-4 2750 4111 0101, FLANGE YOKE BS-3 2067 4112 5103, ASSY CROSS BS-3 2067 4112 0116, COUPPLING FLANGE BS-4 2750 4111 5102, FLANGE YOKE BS-3 & BS-4 2750 4111 5101
Round the clock routine and Preventive Maintenance Work of complete 6.6 KV Unit buses switchgear and associated systems of UNIT 5 and 6 of 2X250MW PTPP Parichha Jhansi
Replacement of Damaged 132 KV Jack Bus Bars and Main Bus Bars along with other ssociated works at 132 KV SS Dohna Under ETD II Bareilly
work for replacement 11kv bus cuplor under eudd ii sre
Construction Of Stair And Boundary wall Near Bus satiation Pond
tata 1512 bus SLEEVE CYLINDER, tata 1512 bus GEAR LEVER RUBBER, tata 1512 bus RADIATOR MOUNTING, tata 1512 bus BRAKE LINER FRONT LHS RHS WITH RIVETS, tata 1512 bus BRAKE LINER REAR LHS RHS WITH RIVETS, tata 1512 bus DRIVE AND DISTRIBUTING KIT, tata ... 1512 bus BODY PARKING ... 1512 bus BREATHER ... 1512 bus OIL ... 1512 bus CENTER ... 1512 bus PISTON ... 1512 bus CYLINDER ... 1512 bus MAIN ... 1512 bus BIG ... 1512 bus VALVE ... 1512 bus PISTON ... 1512 bus VALVE ... 1512 bus VALVE ... 1512 bus CONNECTING ... 1512 bus CAM ... 1512 bus ENGINE ... 1512 bus THRUST ... 1512 bus AIR ... 1512 bus FAN ... 1512 bus COMPLETE ... 1512 bus SLEEVE ... 1512 bus AIR ... 1512 bus WATER ... 1512 bus TENSIONER ... 1512 bus OIL ... 1512 bus OIL ... 1512 bus AIR ... 1512 bus THERMOSTAT ... 1512 bus THERMO ... 1512 bus RADIATOR ... 1512 bus FEED ... 1512 bus FUEL ... 1512 bus AIR ... 1512 bus OIL ... 1512 bus CLUTCH ... 1512 bus PRESSURE ... 1512 bus CLUTCH ... 1512 bus PILOT ... 1512 bus FLY ... 1512 bus ENGINE ... 1512 bus U ... 1512 bus STEERING ... 1512 bus TIE ... 1512 bus DROP ... 1512 bus COMPLETE ... 1512 bus TEMPERATURE ... 1512 bus PADDLE ... 1512 bus WIPER ... 1512 bus INDICATOR ... 1512 bus BACK ... 1512 bus LED ... 1512 bus REAR ... 1512 bus CLUTCH ... 1512 bus SLEEVE ... 1512 bus GEAR ... 1512 bus RADIATOR ... 1512 bus BRAKE ... 1512 bus BRAKE ...
Dismantling of Shreem make 2x5 MVAR capacitor bank for extension of 33 KV bus at 132 KV S/S Bhadohi and carriage of S/S structure from EFU Naini to 132 KV S/S Aurai other related work under ETD-IV, Varanasi
Increasing capacity from (2x63) MVA to (2x63 1x40) MVA including dismantling and shifting of Bus coupler bay and 250 KVA station transformer, installation of 40 MVA T/F including transportation from 132 KV S/S Jigna to 132 KV S/S Mirzapur.
REPAIR/MAINT AND IMPROVEMENT OF LT NETWORK INCLUDING LT PANEL, FEEDER PILLAR BOXES, LT OH LINES, UG ELECTRIC CABLES, STREET LIGHTS, SECURITY LIGHTS AND ALLIED WORK UNDER ZONE D AREA AND REPAIR/MAINT AND IMPROVEMENT OF LT FEEDER PILLAR BOX/PANEL BUS B
Replacement of Protection panels for 220 KV Basti-Bhaukhari line bay and 220 KV Basti-Bansi Line Bay and Replacement of C and R Panel of 145 KV Bus Coupler bay at 220 KV Sub-Station Gidahi Basti Under ETD-I, Basti.
PROPOSED WORK FOR 33 11 KV SUBSTATION BAGHRA EXISTING 10 MVA POWER TF TAPE CHANGER CHANGE 33 11 KV SUBSTATION MAKHIYALI AND BHOPA DAMAGE 05-05 MVA POWER TF SHIFT SUBSTATION YARD AND SUBSTATION MAKHIYALI 10 MVA POWER TF COPPER BUS BAS REPLACED
WORK OF PROCUREMENT, FABRICATION AND ERECTION OF 1000X1000X25 MM S.S PLATE, ON OLD CIRCUIT BREAKER FOUNDATION FOR ERECTION AND COMMISSIONING OF NEW CKT BK ON 220 KV BUS COUPLER BAY AT 400 KV S/S GORAKHPUR UNDER ELECTY. 400 KV TRANS. DIV. GORAKHPUR
SET OF ALUMINIUM INNER FRAME FOR BUS TYPE WINDOW. as per Drg.No. LS/AY/BW-5-4-002 ALT- C, WITH COL-1 of Note -7 QPC of Col.-1=2 Nos. Packing Instructions=PI 113 VERSION 2.0 (Warranty period 30 Months
Sliding Glass Shutter LH & RH as per drg. no. C&W.LGD.SK No. 1070 COL 1 (LH) and drg. no. C&W LGD SK No. 1070 COL 5 (RH) for Bus Type Window (LHB coach). Special Note: Total quantity to be supplied as
SET OF ALUMINIUM INNER FRAME FOR BUS TYPE WINDOW. as per Drg.No. LS/AY/BW-5-4-002 ALT- C, WITH COL-1 of Note -7 QPC of Col.-1=2 Nos. Packing Instructions=PI 113 VERSION 2.0 (warranty period: 30 months
Sliding glass shutter LH & RH as per Drg. No. C&W.LGD.SK No. 1070 COL 1 (LH) and Drg. No. C&W LGD SK No. 1070 COL 5 (RH) for Bus type window (LHB coach). Note: Total quantity to be supplied as 70 Nos
Kit of Brake Gear Bushes for BMBC coaches Specification: -(1) HPPA Brake Gear Bushes to RDSO/2009/CG-17 (Rev.-2) OR (2) S L P R Brake Gear Bushes to C-K605 (Rev.-2) Each set consist of 216 nos. of bus
Dismantling and erection of 145 KV CT PT LA for interconnection of transfer bus to main bus of 132 KV NTPC bay at 132 KV ss Bangarmau
BP 25-26 Installation work of Bus isolator under EDD Kaushambhi
Erection of 132KV Section Isolator and 145KV PT on main bus
BP 25-26 Installaion work of Bus isolator under EDD Chayal
Extension of Bus at 132KV Substation Milkipur Ayodhya under ETD Ayodhya
PROCUREMENT OF CAR DISPENSERS, PROCUREMENT OF CAR CUM BUS (COMBO) DISPENSERS
WORK OF REPLACEMENT OF 220 KV GANTRY JACK BUS AND LINE BAYS ( 220 KV PGCIL) WITH TWIN MOOSE CONDUCTOR AFTER DISMANTLING OF OLD , USED AND WEAK SINGLE MOOSE / ZEBRA CONDUCTOR AND ASSOCIATED SUPPLY OF HARDWARE AT 220 KV S/S BARAHUWA UNDER ETD-II , GORA
Carrying out maintenance in switch yard and replacement of damaged 33 KV Bus Isolator and 33 KV CT and other various works at 33 11 KV Sub Station Rajeev Bhawan under the area of EE, EUDD I, Mathura in the jurisdiction of SE, EUDC, Mathura.
WORK OF DISMANTLING OF OLD 100 MVA TRANSFORMER AND INSTALLATION OF NEW 160 MVA TRANSFORMER AND REPLACEMENT OF 132 KV MAIN BUS BY SINGLE MOOSE TO TWIN MOOSE CONDUCTOR AND OTHER ASSOCIATED WORK AND SUPPLY OF ASSOCIATED MATERIALS AT 220 KV S/S HATA , K
For Shifting of 33 KV and 11 KV VCB Panels of Newly Constructed Control Room Building and Installation of Bus Coupler and 11 KV VCB for Sub-Station Transformer at 33/11 KV Sub-Station Nauchandi, Meerut in the Area of EUDD-III, Meerut.
HIGH VOLTAGE BUSHING AS PER CLW SPECN. NO. CLW/ES/3/0052 ALT.-D OR LATEST, CLW DRG. NO. CLW/ES/3/SK1/0052, CLW/ES/3/SK2/0052, CLW/ES/3/SK3/0052 ALT-D OR LATEST. Firm's offer accepted- High voltage bus
Custom Bid for Services - Providing operating maintaining in good condition one 01 no of mini school bus Tata Winger 14 seater or equivalent diesel driven and year of manufacturing not earlier than year 2021 for a period of one 01 year at ERPL Al..
INSTALLATION OF ADDITIONAL 40MVA TRANSFORMER, CONSTRUCTION OF 33KV TRANSFER BUS AND STRENGTHENING OF 33KV MAIN BUS WITH TWIN MOOSE CONDUCTOR AT 132/33KV S/S JAGDISHPUR-AMETHI UNDER ETD-SULTANPUR
Work of dismantling of partial old transfer bus on rail and construction of new transfer Bus and other associated work at 132 KV Substation Khurram Nagar under ETD II Lucknow
Testing of 125 MVAR Bus Reactor at 400 KV Substation Panki, Kanpur.
Yogpura Road Par Sthith Bus Adde ka sudradhikaran v Marmmat Ka Karya
(WORK) FOR THE WORK OF INSTALLATION 11KV KV V.C.B AND BUS COUPLER
nirman work
Civil Work for increasing Capacity from 2x63 MVA to 3x63 MVA, 07 No. 33 KV Bay, 33 KV Jack Bus, Dismantling and Reconstruction of 02 No. 1X10 MVAR Capacitor Bank and Construction of 01 No. 1X10 MVAR Capacitor Bank at 132 KV S/s Mawana (Meerut)
WORK OF ERECTION/REORIANTATION OF 02 NOS. 132 KV BAY, 01 NO. 33 KV T/F BAY, EXTENSION OF 33 KV BUS WITH ALL ASSOCIATED WORK INCLUDING DISMENTLING/ ERECTION OF 10 MVAR CAPACITOR BANK REQUIRED FOR ADDING CAPACITY FROM 2X40 TO 3X40 MVA AT 132 KV
Hiring of 02 Nos Factory built 52 Seater School Bus (one No with only UP road permit and one No with UP-MP road permit) for transportation of students of employees from Bina project colony to different school and back for 02 Years 600 Days at KSL.
WORK OF REPLACEMENT OF 132 KV GANTRY BUS AND LINE BAYS ( 132 KV FCI CKT.-I , II) WITH TWIN PANTHER CONDUCTOR AFTER DISMANTLING OF OLD , USED AND WEAK SINGLE PANTHER CONDUCTOR AND ASSOCIATED SUPPLY OF HARDWARE AT 220 KV S/S BARAHUWA UNDER ETD-II , GOR
Centrifuging of transformer oil of 500 MVA 400 220 33 KV ICT I CGL make Transformer and 63 MVAR 400 KV Bus reactor CGL make and 63 MVAR 400 KV line reactor Hitachi make at 400 KV Substation Aligarh under Electricity 400 KV Substation Division Aligarh
Civil Works for extns of switch yard for 132 KV Bus Coupler Bay and 2X10 MVAR C.Bank alongwith Dismantling of existing B/Wall (74.50M), Const. of new B/Wall (98.00M), Turfing in switch yard and other misc. Civil work at 132 KV S/s Bachhraun, Amroha
SUPPLY OF LOCK ASSEMBLY FOR BUS TYPE WINDOW OF NON-AC LHB COACHES AS PER ICF DRG. NO.LS/AY/BW-5-4-004 AND AG FIBROTECH PVT. LTD. DRG. NO. AGF/BTWR/07. MATERIAL SPECIFICATION: ALUMINUM LOCK PROFILE AS PER IS: 733- 1983 WITH BLACK POWDER COATING.
Replacement of ACSR Dog conductor by panther conductor of 33 KV line 132 KV FCI to 33/11 KV Sub-Station Raptinagar, Distt.-Gorakhpur and Construction of new 33 KV line Paadri Bazar from Jack Bus-1 of 132/33 KV Sub-Station F.C.I., Distt.-Gorakhpur
11 KV VCB Incoming, 11 KV VCB Outgoing 11 KV Bus Coupler VCB
Dismantling and shifting of 132/33 KV, 20 MVA T/F and shifting, erection, centrifuging of oil, earthing and commissioning and other associated works of new 132/33 KV, 63 MVA T/F and strengthening of 33 KV Bus at 132 KV S/S Gopiganj under ETD-IV
SITC of LT Panel of 02 nos. incomer (powered by 750 KVA 02 no DG Set) for 04 nos. outgoing for 160 KW induction motors with 01 no suitable bus coupler at Village Kalyanpur, at KM 18.20 of Machhligaon Algatpur Bund on right Bank of Rohin river, GKP
SITC of LT Panel of 02 nos. incomer (powered by 750 KVA 02 no DG Set) for 04 nos. outgoing for 160 KW induction motors with 01 no suitable bus coupler at Village Siuria, at KM 10 of Maniram Domingarh Bund on right Bank of river Rohin, Gorakhpur.
Dismantling, Erection and Shifting of various Equipments, Dismantling, Destringing of Bus and Bay wise Jumpers and Restringing of Bus and Bay wise interconnecting the equipments at 132 K.V. Sub- Station- Kadipur under ETD, Sultanpur
CONSTRUCTION OF 33KV JACK BUS AT 132 KV S/S SAIDPUR UNDER ETD-Ghazipur
works