Loading…
Loading…
3,320 results • Best match
Formation cutting, Retaining structure, W-Metal Beam, Crash Barrier, Cross drainages works, Metalling Tarring, Interlocking concrete blocks, V-Shape U-Shape drain, Parapets, Road signages Dumping site etc. Km 36/00 to 51/660) (Under NABARD RID
SH- Providing and laying 25mm thick Bituminous Concrete laying with Paver Finsiher at RD 0/0 to 0/250, 0/880 to 2/100, 3/080 to 3/850 and 3/960 to 4/570 between Km. 0/0 to 4/570
Providing and Laying bituminous concrete 30mm thick in Kam 4/00 to 6/00, 2/00 to 3/250, 1/00 to 1/830 0/00 to 2/00 respectively with paver finisher) DRRP No-HP-13-05-VR0007, VR0023, VR 0090 VR0107)
C O Health Sub Centre Building at Nabon Tehsil Kasauli and Distt Solan HP SH C O Site development Civil work WS and SI work C O septic tank Soak pit and 80mm thick interlocking tile pavement etc
C O Ayurvedic Health Centre at Dhakryana Tehsil and Distt Solan H P SH C O Site Development Civil work WS and SI work C O septic tank Soak pit and 80mm thick interlocking tile pavement etc Deposit Work
SH- Removal of formation deficiency, C/o passing places, Retaining Wall, Breast Wall, Gabion Wall, Missing CD, Side Drain, Parapets, Logo Sign Board, Bio Engineering, Interlocking CC Block and Tarring work Under PMGSY -II Package No. HP-02-09
Widening or road to intermediate lane standard, R/walls, B/walls, C.D. work, GSB, WBM, Tarring work, CC Pavement, Interlocking Concrete block, Side Drain, Parapets, Crash Barrier and Sign Boards including C/o 30.00 meter span Double lane Bridge
C O Ayurvedic Health Centre at Katiyara Tehsil and Distt Solan H P SH C O Site Development Civil work WS and SI work C O Septic Tank Soak pit and 80mm thick interlocking tile pavement etc Deposit Work
Providing and laying 25mm thick Mix seal surfacing with Paver Finisher on Bankhandi Banne Di Hatti via Talpa Mitti road Shaheed Vijender Singh Marg in Km 2/000 to 3/000 Link road to Nagminder from JHD in Km 0/000 to 0/600
PROVIDING AND LAYING BITUMINOUS CONCRETE 30MM THICK IN KM. 5/00 TO 7/900, 2/00 TO 3/00, 3/00 TO 5/00 AND 2/00 TO 2/830 RESPECTIVELY WITH PAVER FINISHER) (DRRP NO. HP-03-05- VR0073, VR0048, VR0087 AND VR0107)
Providing and laying 25mm thick bituminous concrete with Paver Finisher in Km-0/000 to 0/350, RD 0/376 to 0/430, RD 0/450 to 0/950 and C.C Pavement at RD 0/350 to 0/365,RD 0/430 to 0/450.
SH C/O Wall in km. 0/796.40 to 0/810, 0/755.50 to 0/85 and C/O R/Wall in km. 0/810 to 0/814 and Interlocking aver Block flooring in km. 0/716 to 0/750)
Improvement of road under Head NCAP with multiple tine to Clear air in 102 cities on Old NH-22 SH P/L interlocking tile pavement in berms and repair of side drain from at Rd 62/200 to 62/775
SH Protection wall for courtyard of swimming pool adDevelopment and Beautification of the area in and around the Gasota Mahadev Temple Distt Interlocking tile in Diving Area of Swimming Pool etc and Channelization water flow from Pump House to Rivn
C/O R/wall /B/wall at various Rds, P/L Bituminous concrete 30mm thick in km 20/500 to 22/500 with paver finisher and V-shape drain at various Rds) (Under PDNA) Time Limit Three month Cost of form Rs. 5000 Job No.1
Providing and laying 25mm thick Mix seal surfacing with Paver Finisher on Amb Pathiar Sidhorapattan road in Km 0/000 to 1/000, Katyaloo to Shivji Temple road Km 2/840 to 3/000 Link road to village Chamouti road in Km 1/000 to 2/000
Periodic Renewal on Bhadyara to Kahru road (SH.Providing and laying 30mm thick Bituminous concrete with paver finisher in Km 0/0 to 1/0 VR009113101 and Karu to Timal road in Km 1/0 to 2/0 an 3/0 to 3/500 VR012113102 and 012113104) Under State Head
Providing and laying 30 mm thick Bituminous concrete laying with paver finisher, road marking strips of hot applied thermoplastic compound (Painting line) and V-Shape drain between Km 24/140 to 25/00, 25/00 to 26/00, 26/00 to 27/00, 27/00 to 28/00
Providing and Laying bituminous concrete 25 mm thick in Km 2/00 to 4/00, 0/00 to 1/00 , 2/00, to 2/600, 0/330 to 1/00, 0/00 t0 1/00, 4/00 to 4/620 0/00 to 1/500 Respectively with paver finisher
Providing and laying 30 mm thick Bituminous concrete laying with paver finisher, road marking strips of hot applied thermoplastic compound(Painting line)and V-Shape drain between Km 40/500 to 41/0, 41/0 to 42/0 , 45/0 to 46/0 and 47/0 to 48/0
PROVIDING AND LAYING BITUMINOUS CONCRETE 30MM THICK IN KM. 0/00 TO 1/200, 0/00 TO 1/00, 2/00 TO 3/250 AND 0/00 TO 1/00, 2/00 TO 3/00 RESPECTIVELY WITH PAVER FINISHER) (DRRP NO. HP-03-05- VR0021, VR0023 AND VR0112).
PROVIDING AND LAYING BITUMINOUS CONCRETE 30MM THICK IN KM. 0/0 TO 1/00, 0/0 TO 1/900, 0/0 TO 4/0, 0/0 TO 2/0, 0/0 TO 0/700 RESPECTIVELY WITH PAVER FINISHER) DRRP NO. HP-03-05 VR0028, VR0022, VR0033, VR0131, VR0109.
Annual Maintenance Plan for the year 2023 24 on Bhojnagar Banasar road in Km. 0/00 to 12/720 (SH Providing and Laying renewal coat by providing 30mm thick Bituminous Concrete, thermoplastic edge line in Km. 300 to 600 and interlocking tile pavement i
R/R damages to Parwanoo Kasauli Dharampur Subathu Solan road in Km. 0/00 to 57/100.(SH P/L 80mm thick interlocking tile Pavement in Km. 52/100 to 52/150, 52/410 to 52/530 and 53/340 to 53/390)Under PDNA
Re-construction of R/wall at Rd. 15/500 to 15/650,17/400 to 17/500 and 20/00 to 20/200,P/L Bituminious concrete 30mm thick (with paver finisher) and V-shape drain at Various Rds.(Under PDNA - 2023) Time Limit Three month Cost of Form Rs. 2000
SH- Providing and laying 25mm thick Mix Seal Surfacing with Paver Finisher in Km. 6/00 to 7/00, 7/00 to 8/00, 8/00 to 9/00, 9/00 to 10/00, 12/00 to 13/00, 13/00 to 14/00 and 14/00 to 15/00
SH C/O RCC 900mm dia Hume pipe culvert at Km. 0/158 with wing walls M/T in Km. 0/0 to 0/360 and P/L 80mm thick interlocking concrete block and U-Shape drain at RD. 0/090 to 0/150 under SCSP Head
Formation cutting from RD 0/045 to 0/100 and C/O R/walls from Rd 0/0 to 0/012, 0/100 to 0/115,0/395 to 0/435 and P/L GSB and Interlocking concrete Block Pavement from RD 0/000 to 0/185
Providing and laying 25mm thick Mix seal surfacing with Paver Finisher on (i) Indra Colony to Chabber road in Km 0/0 to 1/000 3/000 to 3/200 (ii) Bangoli Ka Talab to Bhatoli Phakorian via Rour Dibber road in Km 0/0 to 1/000 (iii) Bhatoli Phakorian t
Providing and Laying bituminous concrete 30mm thick in km. 0/0 to 2/500,0/0 to 2/0,0/0 to 1/0 ,0/0 to 1/0,0/0 to 0/975 and 0/0 to 1/0 Respectively) DRRP No. HP-03-03 VR0109,VR0072,VR0076,VR0093,VR0086 and VR00120 )with paver finisher
Sub Head C/O Pump house C/O RCC U/G Main storage Tanks at various locations C/O Sector storage tank C/O Anchor Block for Rising main C/O Boundary wall and Panel Fencing around the storage tanks C/O approach road to pump house and HW C/O Paver Bl
R/R damages on SAKB road in Km 26/00 to 70/009 SH Repair of damaged portion of road curst by providing and laying 30 mm thick BC in patch work and 80 mm thick interlocking tile pavement between km 34/00 to 37/00) Under PDNA
Annual Maintenance Plan for the year 2026 27 on Patta Beja Masoolkhana road in Km. 0/00 to 17/500.(SH P/L Renewal coat by providing 30mm thick Bituminous Concrete and Thermoplastic edge line in Km. 0/00 to 3/00 and 80mm thick interlocking tile pavem
AMP for the year 2026-27 on Joharji Mallah road in Km. 0/00 to 27/460(SH P/L renewal coat by providing 30mm thick bituminous concrete and thermoplastic edge line in km. 0/00 to 2/00 and 80mm thick interlocking tile pavement at slusly reaches
Construction of Retaining wall 56/870 to 56/900 , Breast wall between km 56/860 to 56/900,U-Shape Drain between km 56/400 to 56/900 and Crash Barrier between km 56/400 to 56/900 and Interlocking CC pavement at various Rds etc. under PDNA
R/R damages to SAKB road in Km. 26/00 to 70/00.(SH Improvement and strengthening of damaged portion of road by providing GSB, WMM, prime coat, tack coat, 50mm thick BM, 30mm thick BC and 80mm thick interlocking tile pavement between Kms. 37/00 to 55/
R/R damages on SAKB road in Km 26/00 to 70/00 (SH Improvement and strengthening of damaged portion of road by providing GSB, WMM, prime coat, tack coat, 50 mm thick BC and 80 mm thick interlocking tile pavement between kms 55/00 to 70/00) Under P
Improvement and Metalling of Barotiwala to Banalgi road in Km. 37/00 to 70/00.(SH C/O R/Wall, B/Wall in PCC and Wire crates at various Rds, P/L GSB, 80mm thick interlocking tile pavement and repair of existing slab culvert between Km. 37/00 to 70/00)
PROVIDING AND LAYING BITUMINOUS CONCRETE 30MM THICK IN KM. 0/0 TO 1/230, 0/0 TO 1/450, 0/0 TO 2/320, 0/0 TO 1/500, 0/0 TO 5/0 and 2/0 TO 2/510, RESPECTIVELY) (UNDER PMGSY WITH PAVER FINISHER) DRRP NO. HP-03-05 VR0132, VR0133, VR0127, VR0002, VR00003
Providing and Laying bituminous concrete 30mm thick in km. 5/0 to 7/0,0/0 to 2/0,0/0 to 2/0,3/0 to 4/600,3/0 to 5/0,0/0 to 1/0 and 0/0 to 1/0 Respectively) DRRP No. HP-03-05 VR0053, VR0110, VR0122, VR0121, VR0071,VR0019 and VR0018 )with paver finishe
Providing and Laying bituminous concrete 30mm thick in km. 5/0 to 7/0,0/0 to 2/0,0/0 to 2/0,3/0 to 4/600,3/0 to 5/0,0/0 to 1/0 and 0/0 to 1/0 Respectively) DRRP No. HP-03-05 VR0053, VR0110, VR0122, VR0121, VR0071,VR0019 and VR0018 )with paver finishe
Providing and laying Interlocking concrete block pavement on Jallari Galore Salauni Bijhari Deotsidh road at RD 29/450 to 29/495, 29/550 to 29/575 and 30/025 to 30/045 and C/O link road to Harizan Basti Pairwin at RD 0/055 to 0/172 and 0/878 to 1
SH C/o PCC Retaining wall at RD 0/0 to 0/015 0/045 to 0/060 0/075 to 0/100 and interlocking pavement at RD 0/030 to 0/045 and C/o Cross Drainage at RD 0/150 and P/L complete Metalling/Tarring in km 0/0 to 0/250
Providing and laying interlocking Concrete Block Pavement on Jeoli Dvi to Sehli Bhaber Karsai Joure Amb road at RD 3/835 to 3/865 , 4/225 to 4/275 , 4/345 to 4/365 , 4/390 to 4/425 , 5/175 to 5/230 and7/870 to 7/900 and Khorpa Biar road at vario
C/O R/wall at Rd. 4/960 to 4/980, 4/984 to 4/996, 5/015 to 5/030,5/300 to 5/315,9/00 to 9/020, P/L Bituminous concrete 30mm thick in km 4/00 to 5/00, 7/00 to 9/00,11/00 to 13/00( with paver finisher), V-shape drain at various Rds etc