Loading…
Loading…
3,320 results • Best match
Providing and laying 30 mm thickBituminous concrete laying with paver finisher, road marking strips of hot applied thermoplastic compound (Painting line) and V-Shape drain between Km 2/00 to 3/00
SH Providing and laying bituminous concrete 25mm thick in km 0/00 to 5 500 paver finisher Package No HP 03 133) Addl Km Under PMGSY Incentive 2024 25 with five year maintenance
Providing and laying 30 mm thick Bitumen concrete including profile correction laying with paver finisher in Km 4/00 to 5/00, 5/00 to 6/00 and 6/00 to 7/00)
Providing and Laying 25mm thick Bituminous concrete laying with paver finisher and hot applied thermoplastic compound in km2/00 to 3/00 ,3/00 to 4/00 and 4/00 to 5/00
Providing and Laying bituminous concrete 30mm thick in Km 0/0 to 1/800 and 1/00 to 2/00 respectively with paver finisher) (DRRP No-HP-03-03 - VR 0115 VR 0151 )
Providing and Laying bituminous concrete 30mm thick in Km 2/00 to 3/500 and 0/00 to 2/00 respectively with paver finisher) (DRRP No-HP-03-05 -VR 0079 and VR0108 )
Providing and laying 30 mm thick Bituminous concrete laying with paver finisher, road marking strips of hot applied thermoplastic compound (Painting line) and V-Shape drain between Km 0/00 to 1/00
Providing and laying 30 mm thick Bituminous concrete laying with paver finisher, road marking strips of hot applied thermoplastic compound (Painting line) and V-Shape drain between Km 2/00 to 3/00
Providing and laying 25mm thick bituminous concrete with Paver Finisher in KM 3/00 to 4/00, 6/00 to 7/00, 7/00 to 8/00 and 8/00 to 9/00
Periodical Renewal on Kaloha Pragpur Dhaliara Dada Siba Sansarpur terrace road SH. Providing and laying 30mm thick bituminous concrete with paver finisher in km 38.200 to 40.350 MDR46 during the year 2019-20
PROVIDING AND LAYING BITUMINOUS CONCRETE 30MM THICK IN KM. 5/0 TO 7/0 AND 0/0 TO 1/0 RESPECTIVELY) (UNDER PMGSY WITH PAVER FINISHER). DRRP NO. HP-03-03 VR00005, VR0007.
Providing and laying 30mm thick Bituminous concrete with paver finisher in Km 0/0 to 1/000, 1/000 to 2/000, 2/000 to 3/000 and 3/000 to 4/000
P/L G-III in patches and P/L bitumen concrete 30mm thick in kms 3/0 to 6/0 and P/L interlocking concrete block at various reaches.
SH- P/L of Interlocking Concrete Block Pavements at RD. 174/435 to 174 /900 ( L.H.S) , And 174/430 to 174/615 and 178/020 to 178/080)R.H.S .
P/L G-III in patches and P/L bitumen concrete 30mm thick in kms 0/0 to 3/0 and P/L interlocking concrete block at various reaches
Providing and Laying bituminous concrete 30mm thick in km. 0/0 to 5/0 ans 0/0 to 0/890 Respectively DRRP No. HP-03-03 VR005 and VR0004 Under PMGSY) with paver finisher
Providing and laying 30 mm thick Bituminous concrete laying with paver finisher, road marking strips of hot applied thermoplastic compound (Painting line) and V-Shape drain between Km Km 1/00 to 2/00
Providing and Laying 25mm thick Bituminous concrete laying with paver finisher and hot applied thermoplastic compound in km 5/00 to 6/00 , 6/00 to 7/00 and 7/00 to 8/00
Periodic Renewal on Kaloha Pragpur Dhaliara Dada Siba Sansarpur Terrace road SH. Providing and laying 30mm thick Bituminous concrete with paver finisher in Km 60.200 to 60.800 MDR-46 during the year 2019-20
Providing and laying 25mm thick bituminous concrete with paver finisher complete in Km 0/840 to 1/000, 1/000 to 2/000, 2/000 to 3/000 and 3/000 to 3/750
Providing and laying 25mm thick Mix seal surfacing with Paver Finisher on Silh By Pass road in Km 0/000 to 1/000 Jamuli to Basdi road in Km 0/000 to 1/000
Providing and laying 30 mm thick Bituminous concrete laying with paver finisher, road marking strips of hot applied thermoplastic compound (Painting line) and V-Shape drain between Km Km 16/00 to 17/00
Improvement of Banali to Pong Dam road Km. 0/0 to 2/165 (SH. Providing and laying 30mm thick bituminous concrete with paver finisher in Km. 1/0 to 2/160 under Industrial Corridor
Providing and laying 30 mm thick Bituminous concrete laying with paver finisher, road marking strips of hot applied thermoplastic compound (Painting line) and V-Shape drain between Km Km 2/00 to 3/00
Providing and laying 25mm thick Mix seal surfacing with Paver Finisher on Barial to Nandpur road in Km 2/000 to 3/000 Guler to Nandpur road in Km 2/000 to 2/500
(SH- P/L 25 MM Thick B.C laying with Paver Finisher , Road Marking Strips of hot applied Thermoplastic compound (Painting line) Between Km 3/00 to 4/00 and 4/00 to 5/200)
Providing and Laying bi-tuminous concrete 30mm thick in Km 0/0 to2/0, 6/0 to 8/0 ,6/0 to 7/790 and 5/0 to 7/0 respectively with paver finisher
P/L Interlocking Concrete Block in Km 0/780 to 0/825 and 0/945 to 0/990 and C/o B/Wall at RD 0/405 to 0/415
SH Removal of formation deficiency, Co passing places, Retaining Wall, Breast Wall, Gabion Wall, Missing CD, Side Drain, Parapets, Logo Sign Board, Bio Engineering, Interlocking CC Block and Tarring work)
cross drainage structure Metlling Tarring GSB WBM Tarring Cement Concrete Pavement interlocking Concrete Block Pavement drain Road side furniture parapets etcetra. including five year Routine maintenance Under NABARD RIDF XXXI
Restoration and Up gradation of Unit1 Aux LT Protection Panel Metering and Interlocking of LT Panel and Station Transformer Breakers at Andhra Power House under Andhra Power House Division HPSEBLChirgaon
Supply of 3D printed reinforced concrete panels along with steel, Supply of Box sections of size 100x100x5mm, Supply of 16mm TMT bars, PCC Solid block Class A bricks, Stone Patti slab each of size 900x300x50mm thick, Paver block M 20 grade 60mm thickness, Flexible Polyurethane Foams sealant 750ml, Exterior weather proof paint, MS Loop hole of size 900x400mm, MS Door of size 900x1850mm, Sand bag 18 inch x34 inch HDPE as per IS 11652, PBS Roll, Bitumen Primer, OPC 53 grade cement, Well graded sand, All in one aggregate, 0 point 5 mm thick metal deck PPGI sheets, 12 mm TMT rebar Fe 500 grade, Binding wire, Steel cutting blade 4 inch dia, Distemper oil emulsion OBD, W2 Panel, Clay bricks Fly ash brick AAC blocks PCC block CM 1colon 4
Providing and laying 25mm thick Mix seal surfacing with Paver Finisher on Guler to Gathutar road in Km 1/000 to 2/800 and Sakri to Dargeh road in Km 1/000 to 1/600
Periodic Renewal on link road Didian to Gurala (SH. Providing and laying 30mm thick bituminous concrete with paver finisher in Km. 0/0 to 1/0 (VR002913101) under State Head during the year 2021-21
SH. Providing and Laying 25mm thick Bituminous concrete laying with paver finisher and hot applied thermoplastic compound in km 6/00 to 7/00 , 10/00 to 11/00 and 11/00 to 12/000 )
Providing and Laying bituminous concrete 25 mm thick in Km 3/00 to 4/00, 0/00 to 1/00 0/00 to 1/200 Respectively with paver finisher) DRRP No.HP03-03 VR0002,VR0018,VR0043
SH -Providing and laying 25mm thick Bitumens concrete laying with paver finisher and hot applied thermoplastic compound in km 1/000 to 2/000, 2/000 to 3/000 and 3/000 to 3/680
Periodic Renewal on Chanour Tiamal Sheetla Mandir road (SH. Providing and laying 30mm thick bituminous concrete with paver finisher in Km. 3/0 to 4/0 (VR003613104) under State Head during the year 2021-21
P/L BITUMINOUS CONCRETE 30MM THICK IN 10/00 TO 11/00, 12/00 TO 14/00 AND 16/00 TO 18/00 WITH PAVER FINISHER) (DRRP NO. HP-03-03 VR0124 UNDER PMGSY INCENTIVE).
Providing and laying bituminous macadom and bituminous concrete with Paver Finisher in Km-2/000 to 3/700 and cement concrete pavement at RD-2/120 to 2/200 and 3/285 to 3/405
Providing and laying Interlocking concrete block pavement at Rds 1/775 to 1/825 and CO V-shape drain at RD 0/500 to 0/810 )( both side ) Under SCSP Head
Maint and Repair to Def Pool Building under GHQ Section HQ ARTRAC Shimla dg. 2024-25. SH: Repair Renovation of newly proposed MI room , provision of waiting room , provision of store ans washroom for MI room , outside development work near MI room ... laying paver and ...
Providing and laying 25mm thick Mix seal surfacing with Paver Finisher on Har Pukhar Bill Ka Bharo Road in Km 0/000 to 1/900 Bankhandi to Paisa Road in Km 1/000 to 1/500
Providing and Laying bituminous concrete 30mm thick in Km 2/00 to 5/00, 4/00 to 6/00 0/00 to 1/500 respectively with paver finisher) (DRRP No-HP-03-05-VR0013, VR0012 VR0150)
Providing and laying 25mm thick Mix seal surfacing with Paver Finisher on Kalri to village Basdi road in Km 0/000 to 1/000, Saletar to village Doli road in Km 0/000 to 1/000).
Re-construction of R/wall , P/L Bituminious concrete 30mm Thick (with paver finisher) and V-shape drain at Various Rds.(Under PDNA - 2023) Time Limit Three month Cost of Form Rs. 2000 Job No. 5
(SH - Providing and laying 25 MM thick Bitumen concrete laying with paver finisher, Road marking strips of hot applied theromplastic compound (Painting line) between Km 7/00 to 8/00 and 9/00 to 10/00)
(SH - Providing and laying 25 MM thick Bitumen concrete laying with paver finisher, Road marking strips of hot applied theromplastic compound (Painting line) between Km 19/00 to 20/00 and 20/00 to 21/00)
Providing and Laying bituminous concrete 30mm thick in Km 6/00 to 8/00, 1/00 to 3/00, 7/00 to 9/00, respectively with paver finisher) (DRRP No-HP-03-05 - VR0072 , VR0121, VR0013 )