Construction of 125/115mm dia with 70m/90m/120M deep D/T/W with installation of IM-II HP by Truck mounted DTH RIG machine/DTH Rig Machine with 125mm dia blue casing UPVC pipe with drain, platform under D.W.and S. D., Hazaribag Gr No.-HZB/90 M/DT/18
Construction of 125/115mm dia with 70m/90m/120M deep D/T/W with installation of IM-II HP by Truck mounted DTH RIG machine/DTH Rig Machine with 125mm dia blue casing UPVC pipe with drain, platform under D.W.and S. D., Hazaribag Gr No.-HZB/90 M/DT/25
Construction of 125/115mm dia with 70m/90m/120M deep D/T/W with installation of IM-II HP by Truck mounted DTH RIG machine/DTH Rig Machine with 125mm dia blue casing UPVC pipe with drain, platform under D.W.and S. D., Hazaribag Gr No.-HZB/90 M/DT/19
Construction of 125/115mm dia with 70m/90m/120M deep D/T/W with installation of IM-II HP by Truck mounted DTH RIG machine/DTH Rig Machine with 125mm dia blue casing UPVC pipe with drain, platform under D.W.and S. D., Hazaribag Gr No.-HZB/90 M/DT/23
Const. of 300 x 115 mm dia and 60m deep GPT Well with IM- hand pump, 32 mm dia G.I. medium class Riser Pipe by Reverse Rotary with mud pump Rig machine with 125 mm dia blue casing UPVC Pipe with drain, Platform etc. (Gr.- LOH/GPT/60M- Gr.02)
Const. of 300 x 115 mm dia and 60m deep GPT Well with IM- hand pump, 32 mm dia G.I. medium class Riser Pipe by Reverse Rotary with mud pump Rig machine with 125 mm dia blue casing UPVC Pipe with drain, Platform etc. (Gr.- LOH/GPT/60M- Gr.04)
Construction of 125/115mm dia with 70m/90m/120M deep D/T/W with installation of IM-II HP by Truck mounted DTH RIG machine/DTH Rig Machine with 125mm dia blue casing UPVC pipe with drain, platform under D.W.and S. D., Hazaribag Gr No.-HZB/90 M/DT/16
Construction of 125/115mm dia with 70m/90m/120M deep D/T/W with installation of IM-II HP by Truck mounted DTH RIG machine/DTH Rig Machine with 125mm dia blue casing UPVC pipe with drain, platform under D.W.and S. D., Hazaribag Gr No.-HZB/70 M/DT/01
Construction of 125/115mm dia with 70m/90m/120M deep D/T/W with installation of IM-II HP by Truck mounted DTH RIG machine/DTH Rig Machine with 125mm dia blue casing UPVC pipe with drain, platform under D.W.and S. D., Hazaribag Gr No.-HZB/120 M/DT/26
Construction of 125/115mm dia with 70m/90m/120M deep D/T/W with installation of IM-II HP by Truck mounted DTH RIG machine/DTH Rig Machine with 125mm dia blue casing UPVC pipe with drain, platform under D.W.and S. D., Hazaribag Gr No.-HZB/90 M/DT/17
Construction of 125/115mm dia with 70m/90m/120M deep D/T/W with installation of IM-II HP by Truck mounted DTH RIG machine/DTH Rig Machine with 125mm dia blue casing UPVC pipe with drain, platform under D.W.and S. D., Hazaribag Gr No.-HZB/70 M/DT/05
Const. of 300 x 115 mm dia and 60m deep GPT Well with IM- hand pump, 32 mm dia G.I. medium class Riser Pipe by Reverse Rotary with mud pump Rig machine with 125 mm dia blue casing UPVC Pipe with drain, Platform etc. (Gr.- LOH/GPT/60M- Gr.03)
Construction of 125/115mm dia with 70m/90m/120M deep D/T/W with installation of IM-II HP by Truck mounted DTH RIG machine/DTH Rig Machine with 125mm dia blue casing UPVC pipe with drain, platform under D.W.and S. D., Hazaribag Gr No.-HZB/90 M/DT/20
Const. of 300 x 115 mm dia and 60m deep GPT Well with IM- hand pump, 32 mm dia G.I. medium class Riser Pipe by Reverse Rotary with mud pump Rig machine with 125 mm dia blue casing UPVC Pipe with drain, Platform etc. (Gr.- LOH/GPT/60M- Gr.01)
Construction of 125/115mm dia with 70m/90m/120M deep D/T/W with installation of IM-II HP by Truck mounted DTH RIG machine/DTH Rig Machine with 125mm dia blue casing UPVC pipe with drain, platform under D.W.and S. D., Hazaribag Gr No.-HZB/120 M/DT/27
Construction of 125/115mm dia with 70m/90m/120M deep D/T/W with installation of IM-II HP by Truck mounted DTH RIG machine/DTH Rig Machine with 125mm dia blue casing UPVC pipe with drain, platform under D.W.and S. D., Hazaribag Gr No.-HZB/90 M/DT/24
Earth cutting carrying laying and joining of 6 inch dia MS Pipe of length 90 meter and 10 inch dia M.S.Pipe of length 15 meter at 8 No. coal depot Jeenagora Colliery of Amal. NT.ST.JG Project Under Lodna Area.
Diversion and Re-erection 8inch and 10inch dia MS Pipe and 4000 GPM pump 02 Nos and shifting of pipe line breakdown repairing IT patch and 9 seem other pumping related works of ABOCP Mine under Block-II Area
Dismantling and transporting of 8inch dia MS pipe from Silo sump and laying and jointing of 8inch dia pipe range along with transporting and installation 4000gpm pump motor set on ground level of Jarlahi sump of Phularitand AMP Colliery
Shifting of 2nos of HT pump motor set in another side of MOCP Jharna sump along with diversion of its 8inch dia and 10inch dia MS pipe range due to gradual decreasing of water level at Muraidih AMP Colliery
Diversion of 10/8 inch dia MS Pipe range (2nd range) from its existing position to new proposed route due to mining activity and prevent theft of pipes and safety of men at jarlahi patch of Phularitand,AMP Colliery
Different type of pumping and pipeline work i.e. breakdown pumps dismantling, pumps repair, and assembling work at RR Workshop and pipeline shifting, dismantling (10 inch / 8 inch) dia MS pipe at Departmental Coal (main sump) under ABOCP Mine, Block-
Replacement of damaged service cable, PVC pipe, junction box, bus bar box, main switch in block no. 04 MQ-type (qtr no. 49 to 64) of Sharda Colony which is under administration of Dhori (K) Colliery, Dhori Area.
Laying and fixing two range of 8 inch dia MS/GI pipe for running minimum two nos. of 1000 GPM pump and laying, fixing, dismantling and pipe joint of 8 inch / 6 inch dia pipe in Sump No. 04 under Rohini Project, NK Area
Cutting and welding of 6 inch and 8 inch dia GI pipe to make short pieces, reducer bend and new making Y required for changing the location of pumps, Running repairing and replacement frequent consumable items of pump and pipe for smooth running of p
A) Construction of rail-road gate barrier (old side) at near CPP check post under Kathara Washery B) Repairing, replacement and laying of 6 inch dia GI pipe line of pump no. 01 and DSM pump including dismantling and fitting of valve and patch repairi
Lay. and fit. of new GI Pipe 150 mm dia delivery pipeline range from 63L borehole to 65L/15WD through 60L/15DW and disman. of already existing del. range from 65L/15DW to 63L bore hole, and continuous dewatering of mines water under Churi Colliery
A. Mechanical Repairing of 75KW/100HP, 415V, 1485RPM induction motor make GEC installed at water supply point of KMP colony road (BOQ 1-7), B. laying of 2inch dia GI pipe, providing of structural steel arrangement at well to be used for lifting of su
Construction of 125 x 115 mm dia x 70 m depth drilled tube well with installation of IM-II Hand Pump, lowering 32 mm GI pipe with platform and drain at 24 Nos. of different Anganbadi Centres of District - Ramgarh for the year 2025-26
The work of making new pipe arrangement of 6 inch MS pipe for providing road water sprikling and domestic water to nearby villages at ABNS Colliery auto garage from 37/38 incline to auto Grage. Total Length324 Mtr. (approx)
Day to day laying/ dismantling of 6 inch dia, HDPE pipe on as and when required basis near departmental patch and quarry-02 area in Ashok OCP under Piparwar Area. (Transportation of materials from designated place to work site in mines is included
Urgent installation of High Density Polyethylene (HDPE) pipe from discharge range of face and 32 no. pump (near coal stock no. 2) to Jehlitand face for fire fighting and systematic benching from top downward for compliance of Section 22 imposed by D
Diversion and Re-erection 8 Inch and 10 Inch dia MS Pipe and 4000 GPM pump 02 Nos and shifting of pipe line breakdown repairing IT patch and 9 seem other pumping related works of ABOCP Mine under Block-II Area
Different type of pumping and pipeline works i.e shifting and installation of 2000GPM pump and shifting of 10 /8 Inch dia MS Pipe line at D/L coal face (DECO) during upcoming Monsoon of ABOCP Mine under Block-II Area
Erection of 4inch dia 3inch dia 2inch dia MS pipe line in proposed Ecorestoration project at old OB dump near Dozer section and south side of feeder breaker including submerging the pipe under soil to prevent theft of Muraidih AMP Colliery
Repairing miscellaneous work related to shifting of pump motor set 2000GPM (MnP)/6000GPM (10UPH6) with diversion and extension of delivery range 10in/8in dia MS pipe as per new position at 9 seam patch ABOCP mine under Block-II Area
Transporting laying of 100mm dia MS pipe 850m length from Ganeshpur Jangli Baba point to Phularitand phatak up to Dhaskapoti,Mohlipoti, Vhata and main road side with cutting of trench cutting of pipe and welding pipe etc under Phularitand Colliery.
Different type of pumping and pipe line work extension of pipe assembling of parts in 4000GPM pump modification of base plate replacing of defective motor leakage repairing bearing changing recovery of damaged 10inch dia MS pipe and shifting of cable
Dismantling and recovery of 8inch dia and 10inch dia partially damaged MS pipe from different places of mine premises and transporting to Kali Mandir premises for repairing and making of fresh pipe through cutting and welding to keep ready the pipes
JOB 1, Diversion of 6 MS pipeline to Sedimentation/Settling tank at main sump, Barmuri OCP, JOB 2, Extension of 6 MS Pipe 102Mtr Horizontal(17 Nos.) laying from Pumping sub-station to New constructed shed and 24 Mtr. Ver
shifting,erection,alignment of 2850 Ltr Mnt capacity pump and motor 75HP and Delivery pipe from plant to 12C Pond area for deliver pipe from 12C pond to Fresh Water Reservoir by laying 150mm Dia MS pipe and also Excavation Trenches
Transporting ,laying and jointing of 6 inch dia MS Pipe from 2EL/Dip 3to main dip(7EL/3Dip)delivery pipe range of length 192m(32 nos) for enhancement of the dewatering efficiency of UG Mine of Khakharee Colliery under Govindpur Area.
Replacing B/D 4000GPM pump by another 4000GPM pump at Purbasump and dismantling 10inch and 8inch dia damaged MS Pipe from mine and transporting to attendance room premises for fabrication and making of bend, short piece and tapper pipe of AMPC.
Different types of pumping and pipeline works i.e. shifting and installation of 4000 GPM/3200 GPM pump and shifting of 10inch/8inch dia MS pipe line at Deco coal face during upcoming monsoon of ABOCP Mines of Block-II Area
Dismantling of 300 Mtr 6 inch GI / MS. Pipe and laying the same on bench for providing water for dust suppression and to nearby villagers from sainik patch sump at Develgadda including installation and fabrication of sunction, delivery system of 1000
(A) Recovery of 6in dia, 8in dia and 10in dia MS pipe buries in the earth from old delivery range at Jamunia patch (B) Re-assembling of pipe line near old substation river side at Jamunia Patch of ABOCP Mine
Custom Bid for Services - A Repairing realignment of 14 MS pipe along with other miscellaneous jobs for shifting of main pup to lower level in Lohandia sump B Realignment of 8 dia pipe line alongwith other miscellaneous jobs for installation shifti..
(Erection of 3inch dia and 1.5inch dia PVC pipe line from siding water tank to FB No-2 for providing water spray (sprinkling) arrangement for dust suppression purpose round hopper of FB of Phularitand, AMP Colliery under Barora Area.
Dismantling of G.I.Pipe and Fitting of PVC Pipe size 2inch X 1 inch for Domestic Water Supply Pipe Line Pipes at K.T. Submersible Bore Hole to Workers Colony Kalithan Jeenagora Colliery under Amal. NT-ST -JG Colliery Lodna Area.
Replacement of damaged service cable with PVC conduit, providing and fixing PVC pipe junction box, tap off box,main switch 3phase PVC conduit accessories etc in B type block no 03 qtr no 17 to 24 under SDOCM Project.