For Transporting, laying and jointing of 200 mtr 8 inch dia M.S pipe of pump of Bansdeopur Colliery under Sijua Area.
Re-alignment/ repairing of 8/10inch MS pipe and 6 inch dia MS pipe for installation/shifting of main pump at Lalghutua pump house
Re- location of Defunct TW of 70.0 and 90.0 mtr deep DTW with inst. of IM-II HP 32 mm dia GI riser pipe by DTH RIG machine blue casing UPVC pipe drain Platform under DWSD Tenughat on Turn Key Basis for the year 2026-27 (Gr No - TEN/SRDT/70mtr - 1)
Re- location of Defunct TW of 70.0 and 90.0 mtr deep DTW with inst. of IM-II HP 32 mm dia GI riser pipe by DTH RIG machine blue casing UPVC pipe drain Platform under DWSD Tenughat on Turn Key Basis for the year 2026-27 (Gr No - TEN/SRDT/90mtr - 2)
Tap Pillar, GI Pipe B Grade, GI Socket, GI Tee, GI Bend, GI Union, GI Elbow, Hexa Nipple, PVC Pipe Heavy Duty, PVC Door Bend, PVC Gully Trap, PVC Floor Trap, PVC Reducer, PVC P Trap, Cistern, Cement, River Sand, Stone Aggregate, White Cement BOQ Title JJM11
Complete fresh wiring with supplying and fixing required materials such as 4 sq. mm copper wire3/4inch PVC pipe elbow and joint box etc. at Excavation workshop, EnM workshop, Dozer section and newly built tyre shed at Tapin OCP Hazaribagh Area
Replacement of damaged service cable, PVC pipe, junction box, Bus-bar biox, main switch in 2 blocks Mq type quarter, block no. 22 and 23 (Qtr. No. 337 to 352 and 353 to 368) at Sharda colony under SDOCM Project.
Diff.types of jobs such as repairing of old water tank at Shatabdi filter plant, laying and jointing 1inch dia PVC pipe for tanker, fabrication and fixing of safety board and valve repairing and coupling bore and keyway making under Muraidih,AMPC
Layout of 1 inch GI pipe line from railway line to weigh bridge 50 Te. 04 nos. valve (1 inch) fitting and fabrication and erection of 4 inch pipe line 01 no. valve dismantling and fitted near primary crusher stock and pipe line repair of Kathara Wash
Changing of 51 nos Rottern Riser Pipe of 32 mm GI Pipe Connecting Rod CI Cylinder of IM-II DT well and Depositing Taken Out Old Material in Divisional Store In Rural Habitation of Latehar district under DW and S Division Latehar for the year 2022-23
Changing of 50 nos Rottern Riser Pipe of 32 mm GI Pipe Connecting Rod CI Cylinder of IM-II DT well and Depositing Taken Out Old Material in Divisional Store In Rural Habitation of Latehar district under DW and S Division Latehar for the year 2022-23
Dismantaling and transportation of 4 GI pipe and 60 lbs trackline from D-16TG /8th dip Jn to D-16BG/7th dip Jn in XVI(B) and Transportation of 1200mm and Pony belt structure from E-8 BG/5th dip to 4th dip/ O level jn
Work of 8 inch dia MS/GI pipe with dismantling, laying, fixing, pipe cutting and joint bend making etc work with providing reqd spares from 32 No. sump to Dhupgada Nala for operation of 2000 GPM Pump (Approx length 750 M) under Dakra Project,NK Area
Changing of 50 nos Rottern Riser Pipe of 32 mm GI Pipe Connecting Rod CI Cylinder of IM-II DT well and Depositing Taken Out Old Material in Divisional Store In Rural Habitation of Latehar district under DW and S Division Latehar for the year 2022-23
Supply and Fitting 40 mm dia GI pipe 75 Mtr and fixing of 12 Nos.25 mm dia Sprinkler with all required materials for making water spraying arrangement and transporting trench cutting laying and joining 6 inch dia pipe at 9 No.siding of Amal.NT-ST-JG
Fabrication and erection of MS and GI pipe size 200 mm, 250 mm and 150 mm dia pipe line 13 mtr, 9 mtr, 4.8 mtr, 0-0 level and bend, flange fitting at different places and dismantling at Sec-I in HMS Section at Kathara Washery
32 MM GI Pipe 3mtrs Length (medium) with seamless socket as per relevent BIS specification IS 1239 (Q3), Handle Assemble (G. I. ) (Q3), Upper valve Assemble complete set of india mark II 1.25 inch (Q3), Lover valve Assemble complete set of india mark II 1.25 inch (Q3), Connecting rod 3 mtr with coupling (electro galvanised) (Q3), Ball Bearing 6402z (Q3), Cylinder assemble complete set for mark II 1.25 inch (Q3), Chain with coupling (Q3), Hexagonal Bolt M12x1.75x40mm long common to mark II & III (Q3), Hexagonal Nut M12x1.75 (2.5 mm thick) (Q3), Handle Axle (stainless steel) (Q3), Hig Tensile Bolt M10x1.5x40 mm long (Q3), Spacer for handle (Q3), Handle axle washer 4 mm thick (Q3), Washer M12 (2.5 mm thick) (Q3), Nylon Nut M 10x1.5 (Q3), Hexagonal Bolt for front cover M12x1.75 (Q3), Nitrile Rubber Seating Big for Lover valve M II (Q3), Nitrile Rubber Seating Big for Upper valve M II (Q3), Nitrile Rubber Cup washer for mark ii & iii (Q3), Pipe Wrinch 14 inch (Q3), Hexa Blade 2 box (Q3), VICE 1.25 inch (Q3), Pipe Wrinch 12 inch (Q3), Ring Wrinch 17x18 (Q3), Ring Wrinch 18x19 (Q3), Rod Dia 3 Suta (Q3), MOUTH (WATER TANK) - (1.25INCH) (Q3)
Construction of 5 nos. 200 mm x165mm x 300.00 M deep HYDT Well and providing 5 nos. 5 HP Electric Motor with submersible Cable Rope HDPE pipe and Bore well chamber in WTP campus of Keredari-Peto RPWSS under D.W. and S. Division Hazaribagh
Providing and fixing HDPE pipe PN 10, 75 mm and 40 mm dia from deep borewell at old check post near Sainik workshop to Piparwar pit office and from deep borewell near CISF camp at Piparwar to Piparwar workshop canteen under Ashok OCP, Piparwar Area.
Replacing of BD 4000gpm pump motor set of Jharna face and dismantling and transporting of 10inch dia and 8inch dia damaged MS pipe from different places of mine and transporting to attendance room premises for fabrication of bend and tapper pipe at M
Dismantling and recovery of 10inch dia and 8inch dia partially damaged MS pipe from different places of mine premises and transporting to SOCP Kali Mandir premises for repairing and making of fresh pipe through cutting and welding to keep ready the p
Dismantling and transporting of two 4000gpm pump motor set from 3rd patch sump to SOCP attendance room premises and dismantling of 10inch dia and 8inch dia MS pipe from 3rd patch pipe range and transporting to SOCP attendance room premises for necess
Transporting and installation 2000gpm pump motor set on ground level of Jarlahi sump along with dismantling of idle range of 8inch dia MS pipe line from main sump of Muraidih and transporting laying and jointing of 8inch dia pipe range at Jarlahi sum
Laying and joining of 1100 mtr. 10 inch dia MS Pipe for creation of 01 No. new delivery range from Jeenagora quarry to Marigodam colony for supply of domestic water to said colony of Amal NT-ST -JG Colliery Under Lodna Area .
Dismantling and withdrawal of 4000gpm pump motor set from SOCP old coal face and transporting to SOCP attendance room premises for repairing and dismantling of idle range of 10inch and 8inch dia MS pipe from SOCP old coal face sump and transporting l
2times shifting of HT 2000gpm pump motor set in another side of the sump along with diversion of its 8inch dia MS pipe line due to advancement of mining activity and other miscellaneous mechanical works at old Ghtway patch3 of Damoda Colliery
Dismantling and transporting of 10inch dia damaged pipes to Kali Mandir premises for repairing welding of flange in 10inch dia and 8inch dia MS pipe and fabrication of 10inch dia 8inch dia and 6inch dia bend 10inch by 8inch dia reducer shortpiece mai
Dismantling, Laying of 6 inch, 8 inch MS Pipe, Shifting of 1000 GPM,2000 GPM pump with shifting an extension of existing pipe line, providing of pipe line accessories, required fabrications as per desired fitting at suction or Delivery end and other
Erection of 2 nos. delivery pipe lines of 10 inch dia. 320 meter MS pipe length each for installation of 2 nos. 4000 GPM 150 meter head pumps on pontoon at X2 patch under ASP Colliery. Total length of pipe lines 640 meter.
Replacing of BD 4000gpm pump motor set of Jharna face and 3rd patch sump and dismantling and transporting of 10inch dia and 8inch dia damaged MS pipe from different place of mine and transporting to attendance room premises for fabrication of bend sh
Laying of One new 10 inch dia MS pipe line of 340 Mtrs approx. of 2000 GPM pump- motor to maintain smooth supply of water for domestic use at Bararee colony Bagdigi Basti and Modibhita Basti of Amal.Jayrampur Colliery under Lodna Area.
Dismantling and transporting of damaged 10inch and 8inch MS pipe of from different location of mine premises to SOCP attendance room premises for repairing and fabrication of bend tapper pipe stainer to keep ready for further use in pipe line at mine
Dismantling of damaged 10inch dia and 8inch dia idle MS pipe line from 3rd patch and transporting to Kali Mandir premises for repairing through cutting and welding of damaged flange and keep ready the pipes for further erection of pipe range at Murai
Digging 3 feet dismantling transporting of 6 inch 8 inch dia. MS pipe from Sudamdih ASP Colliery and transporting the same from ASP to 23.8 incline surface for pit water supply work at Kasturba school and Bhowra Colony at Bhowra North Colliery.
Fabrication and erection of vertical pump and MS pipe supporting channel, angle, joist etc. of thickener no. 01 and delivery pipe flotation level and old valve, nipple changing and fitting of unit no. 51 after dismantling the same in the Fine Coal Se
Dismantle and Re-erection of 8 inch/10 inch dia MS pipe line range deco hall Road High-wall to 9 seam face and installation of 4000 GPM (10 UPH8) Pump 6U18 pump at 9 seam under ABOCP mine Block -II area
Custom Bid for Services - ARepairing Realignment of 14 dia MS pipe along with other miscellaneous jobs for installation shifting of 10UPH8 pump in lower level of deep mine zone B Realignment of 8 dia pipe line along with other miscellaneous jobs for..
Custom Bid for Services - Repairing realignment of 14 dia MS pipe for diversion of RKB 25046 DK pump in deep mine zone B Realignment of 8 dia pipe line along with other miscellaneous jobs for installation shifting of Flyght pump at Lohandia Patch
For erection (A) Erection of 1 Nos MS Pipe pole incoming 11KV unstable (Replacement) Near Coal Dump(B) Erection 1 nos MS Pipe Pole 220V, lighting OH line at Rehabilitation site and dismantling 3 nos.(three) MS Pipe Pole (C ) Dismantling and drawing
Const. of 300x125m dia and 60m deep GPT T/Well with inst. of Im-II HP with 32m dia. GI Medium class RP by DTH Rig Mac. with 125m dia Blue Cas. UPVC pipe with drain on Turn key basis in Diff. location in Latehar Dist for the Yr 23-24. LTR/GPT/60-01
Relocation of D T-Well of 125-115 mm dia with 70 mtrs deep dt well of IM-II HP 32mm dia GI riser pipe UPVC pipe with drain and other works different Block in Latehar district for the year 2026-27 under DW. and S Div Latehar Group No-SR-70-02) 40 Nos
Relocation of D T-Well of 125-115 mm dia with 70 mtrs deep dt well of IM-II HP 32mm dia GI riser pipe UPVC pipe with drain and other works different Block in Latehar district for the year 2026-27 under DW. and S Div Latehar Group No-SR-90-02) 30 Nos
Relocation of D T-Well of 125-115 mm dia with 70 mtrs deep dt well of IM-II HP 32mm dia GI riser pipe UPVC pipe with drain and other works different Block in Latehar district for the year 2026-27 under DW. and S Div Latehar Group No-SR-90-01) 30 Nos
Relocation of D T-Well of 125-115 mm dia with 70 mtrs deep dt well of IM-II HP 32mm dia GI riser pipe UPVC pipe with drain and other works different Block in Latehar district for the year 2026-27 under DW. and S Div Latehar Group No-SR-70-01) 40 Nos
Relocation of D T-Well of 125-115 mm dia with 70 mtrs deep dt well of IM-II HP 32mm dia GI riser pipe UPVC pipe with drain and other works different Block in Latehar district for the year 2026-27 under DW. and S Div Latehar Group No-SR-70-03) 40 Nos
Relocation of D T-Well of 125-115 mm dia with 70 mtrs deep dt well of IM-II HP 32mm dia GI riser pipe UPVC pipe with drain and other works different Block in Latehar district for the year 2026-27 under DW. and S Div Latehar Group No-SR-90-03) 25 Nos
power cord-Flexible electric cable Heating cables or Wire cotton Power for Heater, hdpe pipes for water supply
Transporting, Laying and Jointing of 250 mtr dia. 8 inch MS pipe and installation of Pump 600 GPM at Bansdeopur OCP, Fabrication of 2 Shed 15 ft x 10 ft(ii) installation of 6 and 10 inch pipe delivery range with flange, welding with base plate fa
Changing of 65 nos RRP of 32 mm GI Pipe Connecting Rod CI Cylinder of IM-II DT well and Depositing Taken Out Old Material in Divisional Store In Rural Habitation of Latehar district under DW and S Div. Latehar for the year 23-24 Gr no. Latehar
Maintenance, laying and erection of 150mm and 100mm dia MS/GI Pipe line from 6/2 quarry to IWSP and 6/2 quarry to PO office, EnM Workshop and nearby area and fabrication of 01 no. of Base Plate for 1000 GPM pump installed at IWSP under Sarubera