Loading…
Loading…
6,382 results • Best match
WORK OF CONSTRUCTION OF FIRE SHED , REPAIRING AND PAINTING OF SAND PIT COVER AND RE-FILLING OF SAND PIT AT 132 KV S/S BHATHAT UNDER ETD-I , GORAKHPUR
Number punching on black fabricated parts manually/machine in the work shop shed No. 1, 2 3 by outside agency at the premises of Electy. Fabrication, Unit, Naini, Prayagraj
Please refer to tender document
As per BOQ
As per BOQ
AS PER BOQ
AS PER BOQ
AS PER BOQ
General Electrification work in connection with Miscellaneous Telecom Works- Standby master telephone, strengthening OFC media & S&T service building in place of PORTA hut, Miscellaneous Signalling Work for raising the sectional speed 130 KM/H in ... trip shed at ...
Electrical Work in Connection with Rebuilding of Rail Beam of Old Washing Line No. 1 & 2 of LKO Yard,Improvement/Up-gradation of North Coaching Complex Washing Line & Provision of Fencing towards North side Pathway of Sadar Washing Line and ... covered Shed and ...
General Electrification work in connection with Development/upgradation of goods shed with world class facility at Chhatarpur; Provision of Modular sewerage treatment plant at various stations (KGM, KPV, LKU, HDW, RUPC, BC, KJN, FBD, PBE & KSJ); Construction of Type-II (10 Nos.) & Type-III (05 Nos.) Quarters for operating staffs and Construction of Type-II (10 Nos.), Type-III (03 Nos.) & Type-IV (02 Nos.) Quarters for operation staff in PBE-MLN Section over IZN division.
Electrical Work in Connection with Rebuilding of Rail Beam of Old Washing Line No. 1 & 2 of LKO Yard,Improvement/Up-gradation of North Coaching Complex Washing Line & Provision of Fencing towards North side Pathway of Sadar Washing Line and ... covered Shed and ...
'Attending and Filling up of dry, screened, clean sand in sandbox after draining out of moist or wet sand if any inside the sandbox along with its disposal at provided place and ensuring free flow of sand in AC Electric Locomotives with supply of ... Loco Shed ,
General Electrification work in connection with Miscellaneous Telecom Works- Standby master telephone, strengthening OFC media & S&T service building in place of PORTA hut, Miscellaneous Signalling Work for raising the sectional speed 130 KM/H in ... trip shed at ...
Number punching on black fabricated parts manually/machine in the work shop shed No. 1, 2 and 3 by outside agency at the premises of Electy. Fabrication, Unit, Naini, Prayagraj.
Number punching on black fabricated parts manually machine in the work shop shed No. 1, 2 and 3 by outside agency at the premises of Electy. Fabrication, Unit, Naini, Prayagraj
Facility Management Services - LumpSum Based - Construction of CC Floor, Teen shed, Benches work; Construction of CC Floor, Benches work; Consumables to be provided by service provider (inclusive in contract cost)
As per BOQ
As per BOQ
05/ECC(D)Ag/2024-25
Construction
Custom Bid for Services - 13440 Nos Adjustment of brake rigging assembly with brake block and replacement on condition basis including transportation of brake blocks from specified location of MEMU Car Shed SRE to working placecoaches and bring ... Car Shed SRE ...
Repairing of damaged burnt LT Distribution Transformers (Copper and Aluminum wound) of capacity 63 KVA to 1000 KVA for Office shed permanent and temporary ATP colony CISF Colony of ATP Anpara
Handheld Digital Infrared Thermometer (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 5 Bid Number : GEM/2025/B/6999057 Dated : 13-12-2025 Bid Document 1/7 Number of Auto Extension count 3 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Insulation Tester (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 5 Bid Number : GEM/2025/B/6999305 Dated : 13-12-2025 Bid Document 1/6 Number of Auto Extension count 3 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
thermal imager (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 5 Bid Number : GEM/2026/B/7072066 Dated : 05-01-2026 Bid Document 1/7 Number of Auto Extension count 3 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Hand Operated Shearing Machine (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 5 Bid Number : GEM/2025/B/6999457 Dated : 13-12-2025 Bid Document 1/6 Number of Auto Extension count 3 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Heat Shrink Termination Kit as per IS 60840 (Q3)
Power Cable For Direct Burial Xlpe Ugac Cable-IS: 10418 (Q3)
Silica Gel as per IS 3401 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6672565 Dated : 11-09-2025 Bid Document 1/6 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Insulation Tester (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 5 Bid Number : GEM/2025/B/6999228 Dated : 13-12-2025 Bid Document 1/6 Number of Auto Extension count 3 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Propeller Type AC Ventilating Fans - Exhaust Fans (V2) as per IS 2312 (Q2)
Drum Dollies (Q3)
Online UPS (V2) (Q2)
GALVANIZED MILD STEEL FIRE BUCKET (Fire suppression hand tools) as per IS 2546 (Q3), Fire Buckets Stand (MRPL) (Q3)
DOL starter (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 5 Bid Number : GEM/2026/B/7071272 Dated : 05-01-2026 Bid Document 1/6 Number of Auto Extension count 3 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Custom Bid for Services - Mechanized cleaning & watering of coaches of primary maintenance (PM) trains, Terminal maintenance TM/Platform return trains and Mechanized Pit & Premises cleaning of depot complex at C&W depot Balamau (BLM) & Shahjahanpur (.. Similar Category Cleaning, Sanitation and Disinfection Service - Outcome Based
Handling and Transport on Lumpsum Basis - Handling Service, RWC Yamuna Bridge
Electrical work in connection with provision of Electronics interlocking under remodilling work at LJN yard, Proposal for extension of electric loco shed at Lucknow Jn. yard, CYM Building at coaching Depot ASH, Development of goods platform surface, fencing etc. at Pardhan and approach road at BKT Railway Stn, Provision of 6 Mtr. FOB at Aishbagh under ABSS, Construction of 50 Beded Mahila RPF barrack at Aishbagh, Provision of Goods Terminal at PD & BKT and Infrastructure improvement in Div. Store Depot at Malhaur.
(i) Provision of Railnet connectivity at SEB & RFJ OHE Depots in DDU division. (ii) Augmentation of shed facilities to improve the capacity for IOH/POH of Track Machines as well as improving the storage facilities at PD/DDU. iii) Replacement of defective S&T cable over DDU division. (iv) Arrangement for Shifting of Signaling Material from Existing Signaling Store SSE/S/1/DDU & SSE/S/2/DDU to New Store at DDU in view of 3rd line work in between DDU-PRYJ.
Supply of dry sand confirming to RDSO specification No. AARM 916-51 (clean silica sand free from clay, loams, Mica and other foreign materials to be used for Diesel and Electric locomotives and filling up of sand with attending of sanders and ... Diesel Shed GIM ...
as per BOQ
Please Refer to tender document
Custom Bid for Services - TENDER ON GeM PORTAL FOR CYLINDER SHIFTING, CYLINDER CRUSHING/DESHAPING, AND MISCELLANEOUS SHED-RELATED JOBS AT JHANSI LPG PLANT Similar Category Facility Management Service- Manpower based (Version 2)
Repair of Complete Surface, Rapair of Crack Bond for both Handball Court, Paint on both Handball court, Construction team benches Sitting 06 x persons, Construction of overhead shed Sitting 06 x persons
Iron Gatter 27 Ft 8 In, Iron Gatter 21 Ft, iron hooks, iron angle 20 Ft, iron plates 14 in, primer 4 ltr, bolt nut washer, fiber for shed 20 x 6
Construction of temporary shed for protection of environmental monitoring equipment at terrace of Main Building including construction of service staircase for terrace of old animal house CRK Campus of CSIR IITR Lucknow
Custom Bid for Services - Provision of outsourcing of non core activities at Crew lobbies, CTLC control and Trip Shed at PRYJ PCOI and KCNN for 03 years Similar Category Data Analytics Service
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Relocation of solarium alongwith all its electric fitments shed and wooden travis at RVC Centre and College; Medical Equipment and Devices; Service Provider
Shed Repairing, Plaster, Painting of Gaushala near DM Residence, Interlocking Tiles Work at Side Road of DM Residence, Construction of Wall of Grill, Platform for Yoga, Kyari and Painting work in Officers Park.