Loading…
Loading…
6,382 results • Best match
Hiring of Consultants - Milestone/Deliverable Based - Technology Consultants, Subject Matter Experts, Consultancy for Preparation of Structural Design and Estimation of Quantities for Provision of Hard Standing and Covered Shed for 46 Tatra Vehicles ..
Please Refer to tender document
Please Refer to tender document
03/ECC(D)Ag/2025-26
Routine electrical maintenance of internal wiring and fixing of different type fixtures in RBs, NRBs of Permanent, CISF Colony, H Type office Shed, Administrative Building etc and Providing Electrician for emergency work of hospital
Routine electrical maintenance of internal wiring and fixing of different type fixtures in RBs NRBs of Permanent CISF Colony H Type office Shed Admin Building etc and Providing Electrician for emergency work of hospital
CONSTRUCTION OF NEW ROOF IN PLACE OF DAMAGED ROOF OF GROUND FLOOR BUILDING OF EXECUTIVE ENGINEER, URBAN ELECTRICITY DISTRIBUTION-III, AGRA, INSTALLATION OF SHED, PAINTING, COMMON TOILET FOR CONSUMERS AND OTHER RELATED PUBLIC WORKS.
Please Refer to tender document
Please Refer to tender document
Please Refer to tender document
Please Refer to tender document
RO Plant 500LPH, Raw and fresh water tanks, PVC wall Shed with PVC roofing Sheet 7x5 ft, Plinth Structure 1.5 Feet tall from ground for RO base size 8x5 ft, Installation and construction job work
Tower Bolts (Ferrous Metals) as per IS 204 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6746400 Dated : 01-10-2025 Bid Document 1/6 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 414763 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Water Mist Type Wheeled Fire Extinguishers (V2) as per IS 16018 (Q2) MSE Exemption for Years of Experience and Turnover
All in One PC (V2) (Q2)
Please Refer to tender document
Please refer Tender documents
Construction work of office building meeting hall roof repair boundary wall and gate near public toilet room for solid waste material in pre built garage shed for auto charging and others in Nagar Panchayat Fatehpur premises.
Designing, Supplying, Fabricating and erecting pre-fabricated structural steel Finger shed with RCC Mastic Floor, Loading/ Unloading RCC Platform, Fire Water sprinkler system, LPG Line and allied works for 425 Kg Filling Facility at Varanasi BP
50 LPH RO Plant, Water cooler 150 Ltr, Plastic Water Tank 1000 Ltr, Fabrication of Stand and Shed and MS with Paint, Plumbing and installation Work and Piper fitting valves and labour, Tiles and civil work
Electrical work connection to 1.Construction of S&T Goomti under work Provision of second goods shed common running line of CSL-730m at Pharia. 2.Provision of modular Sewage Treatment Plant at NGT nominated stations Belthara Road (BLTR) & Khorasan Road (KRND) stations. 3.Additional work of BLTR station under ABSS. 4.Additional work of SRU station under ABSS. 5.Provision of Type-II (6 unit) Type-III (1 unit) & Type-IV (1 unit) Quarter for Track machine staff at DLR. 6.MAU Jn- Extension of FOB (6.0 m wide)
Please Refer to tender document
Trolley as per Tech Specs, Hand Gloves Top Quality as per sample, Front open crates FPO 35 as per sample, NRV in Industrial Shed 6into6 for air compressor pipeline, VCD Wheel 4 inches, Helical Gear Cutting Tool
Design Construction of Staff Quarters Tower Wagon Shed with Laying and linking of Railway Track OHE PSI Depot other ancillary works etc at any Railway Station between Kannauj to Kalyanpur in connection with Electrification of Mathura Kasganj
Routine Maintenance of 1.5 Ton 2.0 Ton 4.0 Ton Tower Air Conditioner along with Voltage Stabilizer Water Cooler Fridge Desert Cooler Aquaguard in FFH Damini VIP Guest House Hospital Officer Club Administrative Building H Type Shed CI
Blue paint, White Pain, Red Pain, Board colour paint, Black Paint, Turpentine, Chunna, Geru, Bleaching Powder, Grass Chemical, Termite Killer medicine, Terracotta, Distemper, Fevicol, Painting Brush 1 inches, Painting Brush 1 pint 5 inches, Painting ... incl sheds and ...
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Work of fabrication canopy shed on Top of fire Extinguisher Cylinder installed at 220KV SS Kirawali Agra; The help of Cement sheet which includes cutting welding and gro..
Please refer to tender document
Please Refer to tender document
AS PER BOQ
AS PER BOQ
Cordless Brushless Impact Wrench (ONGC) (Q3) MSE Exemption for Years of Experience and Turnover
Power Contactors as per IS 13947 - 4 - 1 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6513479 Dated : 30-07-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Digital Multimeter (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 5 Bid Number : GEM/2025/B/6772222 Dated : 09-10-2025 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Power Contactors as per IS 13947 - 4 - 1 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6513664 Dated : 30-07-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Steel Shelving Cabinets (Adjustable Type) confirming to IS 3312 (V4) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6540189 Dated : 07-08-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Sulphuric Acid (V2) Conforming to IS 266 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6723237 Dated : 03-10-2025 Bid Document 1/6 Number of Auto Extension count 1 Past Performance 50 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Pneumatic impact wrenches (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6671843 Dated : 11-09-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Steel Channels And Hot Rolled Steel Section-IS 808 (in metric tonne) (Q3)
Goods Transportation service - Monthly Based Service - Outside state; Mechanical Materials and Men; 9 MT Capacity Open Body Truck
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Repair of shed Iron Doors and paint of wall with oil bond Wall Putty Distemper White wash Enamel paint and plastering of GFC Muzaffarnagar; Repairing and Paint of build..
Conversion of existing boxing shed into SC Centre, Extension of existing taekwondo hall, Upgradation and repair work of staff quarter and Providing and fixing of concertina coil and raising of boundary wall at different locations in the SAI Lucknow
Construction of storage at 132 KV Substation Mohaan Road including loading, transportation, unloading shifting and stacking of equipment, items from 132 KV Substation TRT to newly const storage shed at 132 KV Ss Mohaan Road under ETD I, Lucknow
Custom Bid for Services - Mechanized cleaning of floor, pits & toilets, desilting of manholes, drains, disposal of industrial waste, horticulture, shed and office housekeeping at ROH Depot Moradabad for two years Similar Category Cleaning, Sanitation and Disinfection Service - Outcome Based
SEE IN TECHNICAL BOQ
Work
Round the clock Routine Bd maintenance work of electric supply in CISF colony H Type shed Admin building BD maint of 33 kv Bina Anpara line along with cleaning of ss Rt mtc work of Bina Kakri and mtc of motors.
Routine and Breakdown maintenance of 1.5 Ton 2.0Ton 4.0 Ton AC along with Voltage Stabilizer and water coolers Geyser Aqua Guard hot blower in VIP Guest House Hospital Officer Club Administrative Building H Type Shed CISF Colony etc of ATP Anpara
Electrical Supply and Routine Internal Maintenance of residential CISF colony shed office Admin building BD maint of 33 kV Bina Anpara 11kV Bina Kakri Wharfwall LT line of ATP BD maint of motors of temp filtr plant of ATP Anpara
Electrical Supply and Routine Internal Maintenance of residential CISF colony shed office Admin building BD maint. of 33 kV Bina Anpara 11kV Bina Kakri Wharfwall LT line of ATP BD maint of motors of temp filtr plant of ATP Anpara