Loading…
Loading…
6,382 results • Best match
SEE IN TECHNICAL BOQ
Work of installing grill on the window of Central Evaluation Building and fencing and shed around the electric sub-station at Chaudhary Charan Singh University, Meerut.
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Manufacturing Unit; WARE HOUSE SHED OF LOADING AND UNLOADING POINT AT CATTLE FEED PLANT; Service Provider
As per tender documents
AS PER BOQ
As per NIT Document
Shed for Main Gate 30ft x 15ft, Floor Matting, Peetal Water Pot 5 Ltr, Hand Wash Water Container, Painting of Sarv Dharam Sthal, Repair of Exhaust Fan
ward number 15 carnalganj me prathmik vidyalaya phoolpur me boundry wall, toilet, do kakshiya bhawan nirman, interlocking sadak, kaksh marammat, handpump/sumersible and kitchen shed nirman karya
NAGAR PALIKA PARISHAD BANGARMAU UNNAO ME FAYAR STETION ROAD MOD KE PASS PARKING STAND PER TOILET 2 SEET V URINAL 2 SEET AND SHED KA NIRMAN KARYA
Painting work on roof surface of Four Number Covered shed and supply and laying Tar-Felt on the roof of workshop in Central Store EGD Pipri, Sonebhadra
Set of material for gas Chromatography Machine for Dissolved Gas Analyzer. set consists of following items: Glass Apparatus with mercury reservoir, vacuum Trap, oil Measuring Cylinder, 100 ml Flask with Vacuum Tubing & Silicon Grease and all other ... loco Shed Izatnagar
Various works at IGFRI Jhansi (UP) SH (1) Repairing of irrigation channel CR Farm, CI Division, Lakara block, old shed etc. (2) Internal and External painting PHT Lab IGFRI. (3) Repairing and Replacing roofing asbestos sheet with GI profile sheet for ST Unit bldg. (4) External Internal painting and replacing roofing asbestos sheet GI profile sheet CI unit bldg. (5) External Internal painting & replacing wooden shutters with aluminum shutter for window GSM bldg.
Construction of Kendriya Vidyalaya (G plus 2) A Type Building and Residential Staff Quarters including Internal Water Supply and Sanitary Installations, Drainage, Development works (Compound Wall, UG sump 1 Lakh Liters Capacity and Septic tank 20 ... Scooter shed , ...
Repair/renovation of officers rest house on 1st, 2nd and 3rd floor of Paharganj side building and other allied works etc. and Repair of covered shed above area 1 & 2 at PF -16 DLI end, and near proposed additional ticket counnters between FOB-1 & food plaza at PF-16 DLI end in circulating area of Ajmeri gate side and other allied works in the section of SSE/W/NDLS under ADEN/NDLS.
Design, Supply, Erection, Testing & Commissioning of 25 KV, 50 Hz Single Phase AC OHE in connection with the following works over Lucknow Division of Northern Railway: (i) 3rd line between Dilkusha to Malhour, (ii) Creation of shed capacity for pit line examination for Vande bharat (16 coach) in Lucknow (Charbagh Workshop) (iii) Provision of Additional Loop line work at Utratia adjacent to line no 7. (iv) Conversion of Achalganj Halt into Crossing station
Cow Protection
Please refer to tender document
Please Refer to tender document
AS PER BOQ
As per NIT Document
Tarpaulim 70 x 30, Drawing roll, Stablizer 2 KVA, Stablizer 5 KVA, Stainless steel storage container 50 kg, Shed Net Green hessian cloth, Grass cutting wire, Fibre Sheet
IRON SQUARE PIPE AND PROFILE SHEET, HARDSTANDING FOR GENERATOR SHED WITH MATERIAL AND LABOUR CHARGES, SHIFTING CHARGES, ELECTRIC WIRE 30 MM, PVC PIPE FOR UNDERGROUND CABLING, ELECTRICIAN CHARGES
Laying of Cement concrete Flooring for levelling of uneven surface under newly constructed Animal van Staff bus and car parking shed at CRK campus of CSIR IITR Lucknow
Renovation (Civil and Electrical) of remaining portion of Store Old Animal House Building including extension of rear portion by temporary shed at CRK Campus of CSIR-IITR Lucknow.
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Manufacturing Unit; REPAIR AND MAINTENANCE OF SHED IN MAUFACTURING UNIT AND GODOWN OF CATTLE FEED PLANT; Service Provider
(i) Zone work for year 2025-26 in sector SB (Whole Service building ): Anusandhan Bhawan (RTRC Building), Canteen, cycle stand, SC/ST association office. RPF Barrack post, TEN Office, Post office, EMS office shed No. 3 & 5, Manak Bhawan(Annexe-I) ... II), Shed No. ...
Grinding Wheel (V2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Bid Number : GEM/2025/B/6309473 Dated : 04-06-2025 Bid Document 1/5 Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Cut - off Wheel (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6432592 Dated : 09-07-2025 Bid Document 1/5 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6652048 Dated : 06-09-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Hydrants (Landing Valve Type A) (PNG) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 5 Bid Number : GEM/2025/B/6961286 Dated : 03-12-2025 Bid Document 1/6 Number of Auto Extension count 3 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Small Angle Grinders (Q3) MSE Exemption for Years of Experience and Turnover
Spill Containment Pallets (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6647692 Dated : 06-09-2025 Bid Document 1/5 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Automotive Vehicles - Retro - Reflective Sheets and Tapes (Traffic Safety) as per IS 14221 (Q4) MSE Exemption for Years of Experience and Turnover
Portable Single Operated Rectifier Type DC Arc Welding Set Suitable for Manual Arc Welding Process as per IS 4559 (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6705947 Dated : 29-09-2025 Bid Document 1/8, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Past Performance 30 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
High Pressure Fire Fighting Hose - IS 14933 (Q2) MSE Exemption for Years of Experience and Turnover
Tanker on Agricultural Trailer (Q2) MSE Exemption for Years of Experience and Turnover
Computer Printer (V2) (Q2)
Multifunction Machine MFM (V2) (Q2)
Solid Cushion Tyres (V3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 5 Bid Number : GEM/2025/B/6959496 Dated : 03-12-2025 Bid Document 1/7 Number of Auto Extension count 3 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Primary product category Solid Cushion Tyres (V3) Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Multifunction Machine MFM (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 5 Bid Number : GEM/2025/B/6887001 Dated : 13-11-2025 Bid Document 1/7 Number of Auto Extension count 3 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Blow Pipe for Welding and Cutting as per IS 7653 (V2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6526721 Dated : 02-08-2025 Bid Document 1/5 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
1 Floating Suction 35, 2 Floating Suction 35, 3 Floating Suction 35, 4 Floating Suction 35, 5 Floating Suction 35, 6 Floating Suction 35, 7 Floating Suction 45, 8 Floating Suction 45, 9 Floating Suction 45, 10 Floating Suction 45
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3), LED Luminaire for Floodlight (V2) Conforming to IS 10322 (Part 5/Section 5) (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6943389 Dated : 28-11-2025 Bid Document 1/8, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Primary product category LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Mobile Containers For Solid Waste (Industrial) - IS 12402 (Q3) MSE Exemption for Years of Experience and Turnover
Cut - off Wheel (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6388655 Dated : 26-06-2025 Bid Document 1/5 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Goods Transport Service – Per KM Based Service - As per scope of work; 9MT CAPACITY TRUCK; SIZE AS PER 9MT CAPACITY, Goods Transport Service – Per KM Based Service - AS PER SCOPE OF WORK; 18 MT CAPACITY TRUCK; SIZE AS PER 18 MT RUCK
Monthly Basis Cab & Taxi Hiring Services - SUV; 3000 kms for 24 x 7 (round the clock); Outstation
Construction work of shade and RCC shed at the queue site for worship at the Hare Krishna temple located in Mohalla Holi Wala, Ward No. 5, Nagar Panchayat Sisouli
Number punching on black fabricated parts manually/machine in the work shop shed No. 1, 2 3 by outside agency at the premises of Electy. Fabrication, Unit, Naini, Prayagraj
Number punching on black fabricated parts manually/machine in the work shop shed No. 1, 2 3 by outside agency at the premises of Electy. Fabrication, Unit, Naini, Prayagraj.