Loading…
Loading…
11,225 results • Best match
Replacement of wornout components of 5000 GPH x 350 meter head HC pump set at pumping station Dalsar
Installation testing commissioning of Sub. pump set and allied works at TW Patel Nagar Bowlian Chak Drab Khan
Repair of 3500 GPH x 230 meter head HC pump set installed at pumping station Chakarabati stage-2nd
Installation, testing and commissioning of HC pump set and the allied works at DW Sawar Sundla in Basohli.
Providing, Installation, Testing and Commissioning of 3000 GPHx220m headSubmersible Pump set alongwith allied works at Pumping station Kanger
Repair to 10000 GPH x 250 meter head HC pump set alongwith allied works at pumping station Khoon.
Recapitalization of 5000 GPH x 200 meter head HC pump set installed at pumping station Ramnagar stage-1st
Repair to 4000 GPH x 250 meter head pump set installed at pumping station Jib stage-1st (Old)
Installation, testing and commissioning of HC pump set and other allied works at Tube Well Nanan in Kathua.
Repair to 10000 GPH x 70 meter head HC pump set alongwith allied works at pumping station Krimachi
Repair to 20000 GPH x 250 meter head HC pump set alongwith allied works at pumping station Dibber.
Replacement of wornout / damaged components of 10000 GPH x 250 meter head HC pump motor set of unit no. 2 installed at pumping station Channi Mansar stage-1st and 5000 GPH x 180 meter head HC pump motor set installed at pumping station Kalka Mata Man
Repair to 8000 GPH x 250 meter head pump motor set of unit no. 1 installed at pumping station Jib stage-1st (New) and repair to 10000 GPH x 250 meter head pump motor set of unit no. 3 installed at pumping station Jib stage-1st (Old).
Repair to 50000 GPH x 158 meter head HC pump motor set of unit no. 5 installed at pumping station Salmay stage-1st (New) and repair to 50000 GPH x 130 meter head pump motor set of unit no. 2 at pumping station Salmay stage-2nd (Old)
REPAIR/MAINT OF PUMP/MOTORS, SUBMERSIBLE PUMP MOTORS AND EXTERNAL WATER SUPPLY ,INCOMING AND DISTRIBUTION SYSTEM AT DIFFRENT LOCATION AT HAWS TRG AND GULMARG UNDER GE 969 EWS
REPAIR/REPLACEMENT OF EXISTING CHOKED WATER PIPELINE FROM MAIN OVER-HEAD TANK TO DIFFERENT INSTALLATIONS INCLUDING SITC OF 1HP MOTOR/PUMP.
Dismantling of Electro mechanical Machinery, creation of temporary route and strengthening of pump house foundations for carrying out extraction works with allied works at flood damaged pump house at LIS Pallan Dheralta Kathua District
Periodical maintenance of 900VM-2, 60 cusecs 32.30m head VT pump of unit No. 5 installed atTawi Pump House, Jammu
Periodical maintenance of 900VM-2, 60 cusecs 32.30m head VT pump of unit No. 5 installed atTawi Pump House, Jammu
Periodical maintenance of 900VM-2, 60 cusecs 32.30m head VT pump of unit No. 5 installed atTawi Pump House, Jammu.
Installation, testing and commissioning of 5,000 GPH x 150 mtr head HC pump set along with allied works at Pumping station Nud 1st.and Strengthening of foundation block for H.C Pump set 5000x150mtr head with 40 HP Prime mover installed at pumping st
Providing and fitting by way of replacement of damaged mechanical components of 8000 GPH x 300 meter head HC pump set and 8000 GPH x 200 meter head HC pump set installed at pumping station Kaghote stage-1st and Kidmoo stage-1st respectively
Construction of small room for irrigation pump house and installation of pumps and odh fall at pyt galwadeychak block marh Distt Jammu Under the head of PRI CAPEX BUDGET for the year of 2023-24
PITC of 5000 GPH X 300 mtr head H.C. Pump sets 1 No. along with allied works at Pumping Station Trudian under UT Capex
MOEI & Fans i/c RMO Pump Sets, Sub-Stn, Street lights, DG Sets etc. at IMD Campus, MET- Rambagh Campus, Srinagar during 2024-25
MOEI & Fans i/c RMO Pump sets, Sub station street lights DG Sets etc at IMD Campus , MET Rambagh Campus, Srinagar during 2025-26
Providing, installation, testing and commissioning of 5000 GPH x 250 meter head (standby) pump motor set at pumping station Kalka Kata.
Providing Installation Testing and Commissioning of HCP pump motor set 5000GPH280 MH along with allied works at Sarnoo Dug Well Rajouri
Replacement of wornout electro mechanical components of 10000 GPH x 70 meter head pump motor set installed at pumping station Krimachi.
Providing, installation, testing and commissioning of 30000 GPH x 250 meter head HC pump motor set at WSS Sounthian stage-1st
Repairs of 05 cusec discharge 75 HP VT pump motor set unit-III along with allied works at LIS Katal Batal
Providing, installation, testing and commissioning of 8000 GPH x 250 meter head HC pump motor set at WSS Ramnagar stage-1st
Providing and fitting of 10000 GPH x 300 meter head HC pump motor set alongwith allied works at pumping station Chenani.
Providing and fitting of 20000 GPH x 21-29 meter head pump motor set alongwith allied works at pumping station Mansar.
Repair to 3500 GPH x 255 meter head x 25 HP HC pump motor set installed at pumping station Saral Chowa
INSTALLATION, TESTING AND COMMISSIONING OF 10000 GPH X 335 METER HEAD HC PUMP MOTOR SET AT PUMPING STATION KAGHOTE STAGE-0
INSTALLATION, TESTING AND COMMISSIONING OF 5000 GPH X 325 METER HEAD HC PUMP MOTOR SET AT PUMPING STATION PARNOTE STAGE-0
Repair to 50000 GPH x 130 meter head pump motor set alongwith allied works at pumping station Salmay stage-1st (Old).
Repair to 50000 GPH x 158 meter head pump motor set alongwith allied works at pumping station Salmay stage-1st (New)
Repair to 50000 GPH x 30 meter head pump motor set alongwith allied works at pumping station Salmay stage-0 (New).
Complete rewinding of 22.5 HP Submersible motor installed at T/well Karodma(standby), and Complete rewinding of 22.5 HP standby Submersible motor installed at T/well Bhalwal.
Providing, installation, testing and commissioning of 12000 GPH x 13 meter head mono submersible pump at pumping station Jib stage-1st (Old).
Providing, installation, testing and commissioning of 10000 GPH x 29 meter head mono submersible pump alongwith allied works at pumping station Jaganoo.
Providing, installation, testing and commissioning of 20000 GPH x 29 meter head mono submersible pump alongwith allied works at pumping station Dibber.
Upgradation of Existing Infrastructure by way of Replacement of Submersible Pump for Water Lifting Scheme at Main Campus Shalimar SKUAST-Kashmir(CAPEX)
Replacement of electro mechanical components of 20000 gph x 29 meter head mono submersible pump installed at pumping station sounthian stage-0
Providing installation testing and commissioning of pumping machinery at pumping station Padoon Dhok under WSS Ghar
Providing, installation, testing and commissioning of pumping machinery and electromechanical equipments at PS Dorsi in Kathua.
Providing, Installation, Testing and commissioning of Pumping machinery alongwith allied equipments at Bore well Atti Rajouri.
Providing Installation Testing and Commissioning of pumping machinery along with allied works at WSS Rakiban/Nadian.