Loading…
Loading…
11,240 results • Best match
Construction of Pump House Building near Mahajan Weighbridge along with Compound wall and lowering/delowering stand at IGC-Samba, Ph-III.
Construction of High Raised Watch Tower near Pump House at TRC area of Sewa-II Power Station, Mashka, JK(CW-620)
MANNING AND OPERATION THROUGH OUTSOURCING OF SEWAGE TREATMENT PLANT INSTALLATIONS, WATER SUPPLY INSTALLATIONS AT PUMP HOUSE NO 09,13 UNDER GE SATWARI
Repair and maintenance of incomer VCB panel-II 800 Amp 6.6 KV 25 kA 250 MVA installed at Tawi Pump house
Providing and fitting of new components to HT Panel Incomer No.II installed at Tawi Pump House Jammu along with allied works
Laying and fitting of pipes sub mains pump House opeators quarter and other allied works for WSS Malikpora Trigam under JJM
MISC REPAIR TO PUMP HOUSE, POWER HOUSE, OVERHEAD TANKS/ UG SUMP AND MES E/M INSTALLATIONS AT DAMANA UNDER GE JAMMU
Clearance of silt/ jungle from RD 17200-18000M of MTC and clearance of silt from sump tank at Raya Pump House
Installation Testing andCommissioning multi stage Installation Testing and Commissioning multi stage Horizontal pump motor set of specification 3000 GPH x 300MH along with allied electro- mechanical works at pumping station Galuti.
REPAIR AND MAINT OF WATER SUPPLY LINES INCL MAIN PIPE LINE, VALVES, VALVE CHAMBERS, PUMP SETS AND CONNECTED ITEMS INCL CLEANING OF OHT AND UG SUMPS AT OAF UNDER GE 970 EWS
MOEI and fans including RMO Sub Station of DG Sets Pump Sets FA and PA System and CH Plant AGs office Srinagar during 2022-23 SH Annual maintenance Electrical and Mechanical Installation
MOEI & Fans including RMO Sub Station of DG Sets Pump Sets FA and PA System and CH Plant AGs office Srinagar during 2024-25 SH Providing of service of operator and Khallasi
MOEI and fans including RMO Sub Station of DG Set Pump Sets FA&PA system and CH Plant AGs office Srinagar during 2025 26 SH Annual maintenance of Electrical and Mechanical installation
P/f of TC -19 coupling set complete for 06 cusec, 250HP pump motor at L.I.S Gantamulla and coupling Nuts andbolts rubber bush type for L.I.S Kanispora, Manzgam.
Providing,fitting jointing 3-core 35 sq.mm submersible copper cable to submersible pump set and starterwith allied works at L.I.S Dabbarpotha.
Providing, installation, testing and commissioning of 8000 GPH x 275 meter head HC pump set with suitable prime mover and allied accessories at WSS Seer Manjala.
Providing Installation, testing and commissioning of 15000 GPH X 150 mtr head HC Pump set along with allied works at Pumping Station Akhnoor Town under Languishing
Providing, Installation, testing and commissioning of sub. pump set of 3000 GPH x 120 mtrs head at Tube well No. 03, Samba under M and E
Replacement of damaged / wornout mechanical components of 10000 GPH x 220 meter head HC pump set of pumping unit no. 1 installed at pumping station Khoon.
Providing Installation, testing and commissioning of 5000 GPH X 200 mtr head HC Pump set along with allied works at Pumping Station Dabber Maira under Languishing
Providing, Installation, Testing and Commissioning of Star Delta Starter for newly installed HC Pump set at Pumping Station Keiour with allied works under District Capex Budget
Replacement of mechanical components of 5000 GPH x 300 meter head HC pump set and sluice non return valve installed at pumping station Tandar stage-0
Providing, Installation, Testing and Commissioning of Star Delta Starter for newly installed HC Pump set at Pumping Station Baghani with allied works under District Capex Budget
ARMO EI & Fans including compound light pump set AVR DG Set at Sb Complex Narwal Pain MS Complex Jammu SH Preventive Maintenance of water softening plant.
ARMO EI and fans including compound light pump set AVR DG Set at SB complex Narwal Pain MS complex Jammu SH Repairing of water softening plant.
MOEI & Fans in Compound light, RMO Sub-Station, Pump Set, DG Set at Regional Research Institute for Ayurveda at Bantalab Jammu. (SH:- Providing maintenance/operating staff)
PROVN OF CENTRIFUGAL PUMP SET SEWAGE/DRAINAGE SUMP AT R CENTRE AND CERTAIN MINOR WORKS AND REVENUE WORK UNDER AGE E/M AT BB CANTT SRINAGAR.
Complete rewinding of 22.5 HP submersible motor installed at T/Well Jandiyal, Complete Rewinding of 22.5 HP Submersible motor installed at T/Well cum P/stn Kalorma, Complete Rewinding of 50 HP Booster motor installed at P/Station Kanik.
PROVIDING LT OVERHEAD LINE FROM 11 KV SUBSTATION NEAR MT COMPLEX TO 120 MEN JAWAN BARRACK SUBMERSIBLE PUMP AND AREA STREET LIGHT AT BSF CAMPUS HUMHAMA FTR HQ BSF KASHMIR
Repair, shifting, installation, testing of 100 KVA voltage stabilizer from WSS Parnote stage-0 to WSS Chakrabhat stge-1st alongwith repair to mono submersible pump at WSS Pernote stage-0.
Larsen & Toubro 15 HP Starters Control Panel for Submersible Pump Brand: Larsen & Toubro (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687769745099 dt.16/07/2026)
25 HP Submersible pump, outlet size 100 mm, Head Range 38 Mtr to 99 Mtr , Discharge 500 LPM to 1600 LPM. Make: Kirloskar, Crompton, Sabar, Texmo, CRI. Accepted Make: KIRLOSKER
Replacement of damaged / wornout parts of 25000 GPH x 65 meter head x 50 HP pump motor set of unit no. 2 installed at pumping station Sounthian stage-0
Repair to 5000 GPH x 220 meter head HC pump motor set installed at pumping station Dhema and repair to 150 KVA voltage stabilizer installed at pumping station Dhema.
Maintenance/Repair,Upgradation /Providing And Fitting Of Pipe Line, Hydrant/Irrigation Equipments, Motor/Pump, Fountain System And Allied Works For The Year 2020-21.(Part-I) Sub Divison North
Providing, installation, testing and commissioning of pumping machinery and all other allied electromechanical works at Filtration Plant Khabber and Dug Well Chakli Kalakote.
Procurement Installation Testing and Commissioning of pumping Machinery with allied electro mechanical works at WSS Dandkote Stage 1st and 2nd under Languishing Project
Providing, installation, testing and commissioning of pumping machinery alongwith allied electro-mechanical works at different pumping stations of PHE Mechanical Sub Division Nowshera
Providing and fitting of components to electro-mechanical equipment pumping machinery along with other allied works at tube well Jasrota and District Hospital.
Providing and fitting of components to electro-mechanical equipment pumping machinery along with other allied works at tube well aranagar and Partap Nagar.
Installation of pumping machinery and repair of Electro mech equipment and providing of Starter panel for various pumping station of Sub Division Rajouri
Providing, Installation, testing and commissioning of pumping machinery at Tung, Chowki Choura, Salyote, Chigyani, Kalakam, Mawa Karora and Migrant Camp under UT Capex.
Providing and fitting of components to electro-mechanical equipment pumping machinery along with other allied works at tube well Jagatpur, Maroli and Pranta.
Providing and fitting of components to electro-mechanical equipment pumping machinery along with other allied works at tube well Dorsi and Barmora Old
Providing installation, testing and commissioning of pumping Machinery with allied electro mechanical works at WSS Thula Di Pari under Languishing project. LUP 711
Repairs to Submersible motor at water supply scheme Bon Koil of Jal Shakti PHE Sub Division Pampore
Construction of Bore Well along-with submersible Motor and allied works at upper Tulhard Aishmuqam district Anantnag.
Repairs to 20 HP open well clear water submersible motor and allied works at WSS Ompora-II
Repairs to starter at WSS Wahab Sahab and rewinding of 40 HP Submersible motor at WSS Mandakpal
Rewinding of 20hp,120 m. Head submersible motor with allied works at lift station botanical garden cheshmashani