Loading…
Loading…
13,239 results • Best match
DVT PUMPS (Q3)
ROTO Pumps Spares
ROTO Pumps Spares
Repairing of pumps
sludge pit pumps
Providing fixing installation and testing of ICTP switches at filter plant submersible pump, open cast washing plant, CRE, View point street light, colony street light and WB etc in respect of Konar Expansion OCP
Re-installation of pully block for lifting lowering arrangement of submersible pump, repairing of supply connecting delivery line with providing sluice valve and other accessories at Colimaran site Domestic water supply point, GRD Project.
Carrying laying and joining of 6 inch dia delivery range 630 mtr. from Bararee 6 pit submersible pump delivery to Bararee 1 No Bazar dhowra at Bararee Colliery of Amal.Joyrampur Colliery under Lodna Area
Repairing of 200 H.P. make Poland auto starter of submersible pump starter 550V Colliery Sl.no. Phu/Starter/16A at Madhuban Filter plant for Drinking water supply for Madhuban Basti under AMP Colliery Barora Area.
Complete Repairing of 150HP, 550V Pullen make automatic star delta starter 550 Volt sl.no. Pullen/LPT/150-1 for office colony Submersible pump control penal 4 no. incline at Lohapatti Colliery of Mahuda Group
Drilling of one no. Deep borewell and installation of submersible pump with all electrical fittings in Upar Tola and Kamla Tand in Kurse village under CSR Scheme of 2021-22 of Barka-Sayal Area.
Repairing / Overhauling and Safety Protection of 400 Amps 440 Volt O.C.B Switch Sl. No.13958 for Power Controlling of 7.5 H.P. Submersible Pump Hospital and New Colony Lighting Line at New Colony Sub-Station
Lifting lowering of submersible pump and motor set along with flushing and allied works of 08 nos deep bore wells at different locations of GM Unit Argada Area. For a period of 02 years
Construction of Handwash Unit with provision of HDPE water tank and Submersible pump installation in Madhya vidhalaya village Bara Botla Panchayat Palasbani Block Dumaria Under DW and S Division Jamshedpur 2024-25 Group-05
LIFTING AND LOWERING WITH INSTALLATION OF 165HP/550V, 150MTRS HEAD 845GPM-5 STAGE SUBMERSIBLE PUMP WITH MOTOR SET WITH 6Inch DIA 20FTs M.S. PIPE WELDED FLANGE WITH CABLES AT LAIKDIH COLLIERY(PIT) DBOCP/NLOCP.
2 HP submersible pump, single phase with DOL starter with ammeter, voltmeter and single phase protection relay, 214-247 mtr head, discharge:0.5-0.9 m3/hrs, discharge pipe dia-32 mm. make- kirloskar, C
Repairing and jointing of flat cable of submersible motor and supply and installation of chemical earth pit at Bhadrichak substation, Mudidih Colliery under Sijua Area
Extension of 8 inch / 10 inch dia M.S. pipe from 1T old sump to coal face including assembling, transporting and placement of pump set at 1T patch of ABOCP mine.
Complete overhauling of diesel engine 8HP of Generator Pump set of WT 28207 and circuit wiring and motor changing of WT 28310 and motor Grader BG825 at ADIC Kusunda Area
Supplying installation Testing and commissioning of 60 HP V.T pump set LT panel and Al. cable for New Mango Urban Water supply Scheme Under D.W and S Mech. Division Jamshedpur.
Providing, fitting of 85 HP, 550 V, 500 Mtr. Head, Submersible motor of Baludenga Domestic Water supply point, GRD Project.
Time to time shifting of 1000 GPM pump-motor complete sets including all accessories in various locations as and when required basis for a period of one year under Churi Colliery, NK Area
Construction of Rural water supply scheme with 1.0 HP DC motor pump complete set and Deep TW of 200x150mm dia, 165mtrs HYDT for Health Center, Noamundi Rutagutu. CBSA/Solar WSS/Untied/Noamundi/01
COMPLETE DISMANTLING/INST ALLATION OF 2 NOS PUMP MOTOR SETS(1)10 INCH LAKARKA DELIVERY and WEST SUMP (2) 6 INCH DELIVERY EAST SUMP FIRE FIGHTING LINE OF AKWMC OCP UNDER KATRAS AREA
Construction of 200mm x165mm x250.00 M deep high yield Drilled Tube well, 2000 liters Capacity HDPE Water Storage Tank AND Installation of Electric Motor Pump of 2.00 H.P. at Sub-divisional library Sahebganj,
Shifting of HT 2000gpm pump motor set in lower side of the sump due to decreasing of water level and other miscellaneous pumping and pipeline works at old Ghutway patch3 of Damoda Colliery
For the work of fabrication and erection of 02 nos. pontoon/ float made up of steel material and empty drums (210 ltrs. cap) for installation of pump motor set at GVP Ph-II.
Supplying and fixing of 01 (One ) Nos.Tyre coupling (F-120) complete set and 03 (Three) Nos. of Tyre coupling for making connection between HT pump-motor sets installed under Purnadih Project NK Area
Shifting of 4000GPM pump motor set of ground level after and before blasting at Jarlahi coal face along with diversion of its pipe line due to safety purpose at Phularitand under AMP Colliery.
TRANSPORTING OF DEFECTIVE 60 H.P. - 6UP - 3 PUMP MOTOR SET COMPLETE WITH ELECTRICAL AND MECHANICAL 2 NOS. FROM INCLINE UNDERGROUND TO SURFACE AND TRANSPORTING TO KESHALPUR COLLIERY WORK SHOP, AKWMC UNDER KATRAS AREA
Dismantling of two Pipeline range 8 inch 10 inch Deco main sump to deco coal face east side (Purba coal face), With pump motor set deco face ABOCP Mine under Block-ll Area
Extension of 3.3KV HT OH 2.5 MVA field feeder lines in new eastern sump side for providing power to the 2000GPM pump-motor set and 581 electric shovel of JOCP under HZB Area.
Construction of 200 mm / 165 mm dia, 270 Mtrs. av. deep HYDT with Installation of 2HP Electric Motor Pump At Panchayat Bhawan Dangapara, Block-Hiranpur in the District of Group No HIR-03
Construction of 200 mm / 165 mm dia, 270 Mtrs. av. deep HYDT with Installation of 2HP Electric Motor Pump At Panchayat Bhawan Surajbera, Block-Littipara in the District of Pakur Group No-01
Construction of mini rural water supply Scheme Solar motor pump complete set in Block BIRNI Panchayat KHARKHARI Village KHARKHARI D.W.S. Division, no 2 Giridih for the Year 2023-24 GROUP NO SVS-2
Different type of pumping works related to dismantling and re-assembling of box pontoon after minor repairing shifting of pump-motor set along with delivery extension etc at Jamunia patch of ABOCP mine
Onsite repairing of one no. 3.3 kV grade, 400 A, Southern make OCB, PnM No. 71, for control and monitoring of 1000 GPM Pump Motor set installed at D.D. Mines under Bokaro Colliery.
Dismantling and erection of 3point3KV overhead line in main coal face for power supply to HT 2000gpm pump motor set and 541 shovel due to advancement of OB face under Muraidih AMP Colliery
Various miscellaneous job related to 11KV and 3.3 KV line for HT motor pump setup at OCP and Bhalgora substation and installation of house wiring infrastructure for pollution monitoring machine at Ena Colliery
Overhauling, changing of gaskets and corksheet, replacement of brass stud, heating of 1500KVA, 11KV/6.6KV Power Transformer used for providing power supply to domestic water supply pump motor set at Muraidih, AMP Colliery.
77 pump motor set complete with electrical and mechanical shifting/ lowering from upper side to lower side of sump water level and re-installation at WM OCP west side AKWMC under Katras Area.
Placing and Installation of 4000 GPM Pump Motor Set 02 No in HDPE Pontoon and Fabrication of Suction Pipe Bend Delivery Pipe Short Piece for Flexible pipe Flowmeter etc at KOCP under ABDKGC.
Complete Repairing and Overhauling of 1 No. Volga Make Star Delta Starter 200 H.P. 550 Volt 150 KW 3 Phase Sl. No. FLP-7450 2 Pit Surface Pump Motor Controlling at Jealgora Colliery.
Laying of new 10 inch and 8 inch MS pipe line and Shifting of 4000 GPM Pump-Motor set at Kujama OCP at Joria side of Amal.NT-ST-Kujama Colliery under Lodna Area.
Shifting of 10UPH8 4000 GPM 200 Mtr head and 2000 GPM pump-motor set along with diversion and extension of delivery range as per new position at Deco purba face of ABOCP Mine
Shifting of HT2000GPM Pump, motor set in upper side of the sump due to increasing of water level and other miscellaneous pumping and pipeline works at Old Ghutway Patch-3 of Damoda Colliery
Shifting of 2000gpm pump motor set of 3rd patch sump along with diversion of its 8inch dia pipe range and other miscellaneous work related with pumping and pipe line at Muraidih AMP Colliery
6.6KV. Benidibh Feeder erection. diversion and clear the area in Deco Box Cut-IIIL. Deco East face, Middle face for power supply to 4000 GPM pump motor etc. ABOCP mine under Block-Area
Shifting and installation of MN-6 pump motor set of Madhuban Incline in upper and safe side of the Incline 04times due to continuously water level increasing at Phularitand, AMP Colliery, Barora Area.