Loading…
Loading…
6,244 results • Best match
Shifting of 50 & 09CFM Compressors, Oxygen Quads and Booster Pump (Q3) ()
Painting, rewinding of pump, rectification of starter, conveyance and reconveyance etc.
The work proposed for construction of sump, filter media, pump connection.
Water Tight Sliding Oil, Jet Water Pump ISO VG-32 Oil
O-RING, GASKET, SEAL SHAFT, GAITER, RING THRUST, SEAL ROTARY PUMP
Online tenders are invited for Settingup of Fuelpump in the land owned by The Alleppey Cooperative Spinning Mills
Inviting Expression of Interest for Empanelment of Manufacturers of various Pipes Specials Pumps Motors Starters Transformers Flow meters Water meters and Valves in Water Supply and Sewerage Projects of Kerala Water Authority
Motor and pump correct alignment,charges for overhauling,supplyig transformer Oil etc.
Painting, rewinding of pump, rectification of starter, conveyance and re-conveyance etc.
Painting, rewinding of pump, rectification of starter, conveyance and re-conveyance etc.
HOUSE MAINTENANCE ,CONCRETE ROAD ,PUMP , TUBE WELL ,FOOT PATH , SOLAR STREET LIGHT
Painting, rewinding of pump, rectification of starter, conveyance and re-conveyance etc.
cleaning/ silt removal from suction pits of pump houses, canal siphons etc
AC Compressor, Steering Pump, HP Pipe, Leak Hose, Fuel Filter, Oil Filter
Construction of Cooling Tower Basin, Pump Foundation 2nos For Vacuum Evaporation Plant.
Painting, rewinding of pump, rectification of starter, conveyance and re-conveyance etc.
Painting, rewinding of pump, rectification of starter, conveyance and re-conveyance etc.
PUMP ROAD MAINTENACE IN WARD 8-IN KAVALANGAD GP-General Civil Work
Painting, rewinding of pump, rectification of starter, conveyance and re-conveyance etc.
LAMP, MODIFIED, FOR AUTO ANALYSER, POWER SUPPLY 12V, PUMP TUBE FLW RTD.
ICU VENTILATOR, PORTABLE VENTILATOR, ECG MACHINE 12 CHANNEL, PULSE OXIMETER, INFUSION PUMP
Includes work essentially consists of cleaning of tanks, rectification works, installation of new blower, pumps, diffusers, one clarifier mechanism, bio fills etc. required for common effluent treatment plant at Rubber Park, at Irapuram
Supplying drinking water in tankers to ships at docks/ quays, storage tanks in ISRF for two years including cost of water, conveyance, supplying and delivering to ships / tanks, pumps, hoses, fuel, consumables etc.
External works Compound wall Paver block Pathway Sump tank Septic tank Rain water harvesting Shed for Generator Bore well Landscaping Solid Waste Treatment LT Cable laying External lighting Water Pumps DG Electrification etc
External works Compound wall, Paver block Pathway, Sump tank, Septic tank, Rain water harvesting, Shed for Generator, Bore well, Landscaping, Solid Waste Treatment LT Cable laying, External lighting Water Pumps DG Electrification etc
Design, Engineering, fabrication, painting, packing, forwarding, supply, erection, testing and commissioning of Press Filter for Titanium Dioxide Plant.-Black end including supply and installation of Feed Pump and Cake Washing Pump
Fabrication and installation of Steel Grated Platform with Foot Wells From Training Gears Size Lengt, Upgradation And Fitment Of High Pressure Spray Jet Booster Pump (2hp) Single Phase Booster Pump 230
Fuel Filter 2 Pin, Fuel filter 3 Pin, Brake Shoe, Disc Pad Set, Oil Filter, Air Filter, Wheel Cylinder, Fan Belt, Water Pump, Oil Pump, Clutch Cyl Assy, Sleeve Cyl Assy
Internal Painting of office space occupied by Registrar of Companies (Kerala and Lakshadweep)(1st and 2nd Floor) and exterior painting of entire building including pump room, generator room, Electrical room, Parking Stilt, Compound wall etc for Company Law Bhavan, B.M.C Road, Thrikkakara, Kochi, Kerala presently named as Corporate Bhawan.
Road maintanance
e the estimate is prepared for pumping and distributing water
ROAD
Supplying drinking water in tanker 6MT to ships at docks/ quays, storage tanks in ISRF for two years including cost of water, conveyance, supplying and delivering to ships / tanks, pumps, hoses, fuel, consumables etc
Automation of Vertical Turbine pumps in Kerala Water Authority RWSS to Kuttamangalam Neriamangalam Implementation of Phase 1 Stage 2 part under Rebuild Kerala Initiative Supply installation trial run and commissioning of Control Module for
Automation of Vertical Turbine pumps in Kerala Water Authority UWSS to Kothamangalam Implementation of Phase1 Stage 2 part under Rebuild Kerala Initiative-Supply installation trial run and commissioning of Control Module for remote operation
Fire hose reel, Automatic Sprinkler Fire Pumps and Accessories Fire pipes valves Intelligent addressable fire alaram system fire extinguishers signages Talk Back system etc for the Development of Government Taluk Hospital Kayamkulam at Alappu
External works for Compound wall Paver block Pathway Sump and Septic tank Rain water harvesting Shed for Generator Tube well Landscaping Solid Waste Treatment LT Cable laying External lighting Water Pumps DG Electrification etc
Restoration of storage capacity ofMeenkara Dam Reservoir by removing silt and silt mixed with sand and clay by means of Pneumatic suction pumps and thereafter separating them individually into seperate stacks in measurable form
Operation & Maintenance of Civil Installations, Electrical Installations, Fire Fighting System, DG Set, Lifts, AC System, STP, ETP, WTP, Water Pumps & Solar Power Generation System, Stack Parking and Building Management System at Aayakar Bhavan, Kochi
Supply and Demonstration of ultrasonic flow meter for the measurement of pump discharge
Bringing down motor, charges for motor and pump alignment, charges for overhauling etc.
Charges of overhauling ,charges of repairing pump , charges for supplying transformer oil etc.
Nitrile rubber gloves (Q3), STIFF COTTON APRON (Q3), 1500W WATER PRESSURE PUMP (Q3)
VOC DETECTOR RAEGUARD 2 PID PDPP, PUMP ASSY RAEGUARD 2 PID HONEYWELL PDPP
TENDER FOR EXCAVATION OF THE SETTLING POND 1 AT AN AREA OF 3675 M2 AND THE SLUDGE IS SHIFTED TO CENTRE PORTION OF SETTLING POND 1 USING EXCAVATORS/ HITACHI/ FRONT END LOADERS/ TIPPERS/ PUMPS ETC
REBUILD-Automation of Vertical Turbine pumps in Kerala Water Authority-lmplementation of Phase 1 (Stage2), part under Rebuild Kerala lnitiative- Supply, installation, trial run and commissioning of Control Module for remote operation of pumping stat
Automation of Vertical Turbine pumps in Kerala Water Authority - RWSS To Keerampara-Implementation of Phase 1 (Stage 2 ) ,part under Rebuild Kerala Initiative - Supply ,installation ,trial run and commissioning of Control Module for remote operation
Automation of Vertical Turbine pumps in Kerala Water Authority RWSS to Kuttampuzha Implementation of Phase1 Stage2 part under Rebuild Kerala Initiative Supply installation trial run and commissioning of Control Module for remote operation for 20HP
Automation of Vertical Turbine Pumps in Kerala Water Authority - Implementation of Phase 1 (Stage2), part under Rebuild Kerala Initiative- Supply, installation, trial run and commissioning of Control Module for remote operation of Vertical Turbine p