Loading…
Loading…
14,277 results • Best match
Annual Maintenance work of Hand Pumps in Block Ratlam District RATLAM 2800 Nos
installation of single phase motor pumps in different villages of Sub Dn. Sendhwa
Renovation of Chemical Storage tanks and Repairing of its Motor Pumps Panels Etc.
Major and Minor Repairing Of 3750 Nos. of Departmental Hand Pumps in MORENA
Erection of HT Overhead line for pumps during monsoon at Block-B Project
Fabrication of universal joint for floating pumps before monsoon at Block-B Project
REPAIRING OF HYDRAULIC JACKS AND HYDRAULIC PUMPS OF DFFERENT CAPACITY OF BMD VSTPS
Procurement of Jaw Flex Couplings for Hydraulic Pumps of CHP-IV, STPS, Sarni.
Procurement of spares of various WPIL make pumps of 210MW, ATPS, MPPGCL, Chachai.
Procurement of generator seal oil pumps for 2x660MW SSTPP, Stage-II, MPPGCL, Dongalia
SUPPLY OF HAND PUMPS REPAIRING MATERIALS AT ELECTRIC STORE OF MUNICIPAL CORPORATION REWA.
REPAIRING WORK OF SUBMERCIBLE AND OPEN WELL PUMPS WITH MATERIALS ACCORDING TO NECESSITY
Installation of single phase mptor pumps in fifferent villages of Sub division Barwani
installation of single phase motor pumps in different villages of Sub Dn. barwani
Binding of Motor Pumps and repairing of Motor Fans under Water Supply Scheme.
Steel components (Deepwell Hand Pumps Components) as per IS 15500 (Part 4) (Q3)
Installation of Hand Pumps for Drinking Water in Ward No. 28, Vidyaneshwar Nagar
Steel components (Deepwell Hand Pumps Components) as per IS 15500 (Part 4) (Q3)
Fabrication of universal joint for floating pumps before monsoon at Block-B Project.
Major and Minor Repairing Of 3188 Nos. of Departmental Hand Pumps in JOURA
Major and Minor Repairing Of 1450 Nos. of Departmental Hand Pumps in KAILARAS
Purchasing of Spare Parts for VT Pumps (Jyoti Ltd.) at Ramnagra (Intake Well)
REPAIRING WORK OF SUBMERCIBLE AND OPEN WELL PUMPS WITH MATERIALS ACCORDING TO NECESSITY
PROCUREMENT OF NEW MOTOR PUMPS FOR YEAR 2026-27 UNDER MUNICIPAL COUNCIL BUDNI.
Providing and fixing of bearing of pumps at KLIS Mandleshwar Distt Khargone (M.P.)
Rubber components (Deepwell Hand Pumps Components) Experience with Government Required 3 Year (s)
Special Tools (Deepwell Hand Pumps Components) as per IS 15500 (Q3) (3 (3 ))
PUMP
PUMP
ARMO various electrical installation at Narcotics residential complex at mall road morar Gwalior MP during the year 2023-24 SH : operation and maintenance of electrical installation in T-I 24 nos, T-II 54 nos,T-III 36 nos,T-IV 14 nos, T-V 5 nos, T-VI ... supply pump sets ,street ...
HYDROTESTING PUMP, HYDRO CLEANING PUMP SYSTEM
Procurement of Ammonia dosing and Hydrazine dosing Pumps of Stage-2Turbine-2x500 MW for NTPC-Vindhyachal
M16575 REQUIREMENT OF RUBBER LINED SPARES FOR WILFLEY PUMP, MORRIS PUMP AND SALA PUMP.
RUNNING MANINTENNACE AND OPERATION OF EI AND FANS SUB STATION EQUIPEMENT COMPOUND LIGHT AND WATER SUPPLY PUMP SET AT SOI RESDL AND NON RESDL COMPLEX INCLUIDNG NEW OFFICE BLDG AT VIJAY NAGAR JABALPUR FOR THE YEAR 2022-23 SH :- OPERATION AND MAINTENANCE OF EAND M SERVICES Subwork/Packages: OPERATION AND MAINTENANCE OF E AND M SERVICES
Hand Pump Chain, Hand Pump Bearing, Hand Pump Coupling Pin, Hand Pump Connecting Rod, Hand Pump Water Chamber, Hand Pump Pedestal, Hand Pump Cylinder Body, Hand Pump GI Pipe Submersible 10 Feet, Upper Valve, Lower Valve, Nut Bolt for Hand Pump
MONOBLOCK PUMP (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6484669 Dated : 23-07-2025 Bid Document 1/9 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Retrofitting of Existing Piped Water Supply Scheme with FHTC in different villages of Block Tamia based on Existing Source, laying and jointing, Construction of OHT, GSR, Submersible Pumps, tap connection, Electrification etc
Retrofitting of Existing Piped Water Supply Scheme with FHTC in different villages of Block Amarwada based on Existing Source, laying and jointing, Construction of OHT, GSR, Submersible Pumps, tap connection, Electrification etc
Retrofitting of Existing Piped Water Supply Scheme with FHTC in different villages of Block HARRAI based on Existing Source, laying and jointing, Construction of OHT, GSR, Submersible Pumps, tap connection, Electrification etc
Retrofitting of Existing Piped Water Supply Scheme with FHTC in different villages of Block Bichhua based on Existing Source, laying and jointing, Construction of OHT, Dugwell, Submersible Pumps, tap connection, Electrification etc
Retrofitting of Existing Piped Water Supply Scheme with FHTC in different villages of Block TAMIA based on Existing Source, laying and jointing, Construction of OHT, GSR, Submersible Pumps, tap connection, Electrification etc
Retrofitting of Existing Piped Water Supply Scheme with FHTC in different villages of Block Jamai, based on Existing Source, laying and jointing, Construction of OHT, GSR, Submersible Pumps, tap connection, Electrification etc
Retrofitting of Existing Piped Water Supply Scheme with FHTC in different villages of Block Harrai based on Existing Source, laying and jointing, Construction of OHT, GSR, Submersible Pumps, tap connection, Electrification etc
Retrofitting of Existing Piped Water Supply Scheme with FHTC in different villages of Block Amarwada based on Existing Source, laying and jointing, Construction of OHT, GSR, Submersible Pumps, tap connection, Electrification etc
Retrofitting of Existing Piped Water Supply Scheme with FHTC at different villages of Block Amarwada based on Existing Source, laying and jointing, Construction of OHT, GSR, Submersible Pumps, tap connection, Electrification etc
Retrofitting of Existing Piped Water Supply Scheme with FHTC in different villages of Block Jamai based on Existing Source, laying and jointing, Construction of OHT, GSR, Submersible Pumps, tap connection, Electrification etc
Retrofitting of Existing Piped Water Supply Scheme with FHTC in different villages of Block TAMIA based on Existing Source, laying and jointing, Construction of OHT, GSR, Submersible Pumps, tap connection, Electrification etc
Retrofitting of Existing Piped Water Supply Scheme with FHTC in different villages of Block Amarwada based on Existing Source, laying and jointing, Construction of OHT, GSR, Submersible Pumps, tap connection, Electrification etc
Retrofitting of Existing Piped Water Supply Scheme with FHTC in different villages of Block HARRAI based on Existing Source, laying and jointing, Construction of OHT, GSR, Submersible Pumps, tap connection, Electrification etc
Retrofitting of Existing Piped Water Supply Scheme with FHTC in different villages of Block Jamai based on Existing Source, laying and jointing, Construction of OHT, GSR, Submersible Pumps, tap connection, Electrification etc