Loading…
Loading…
5,405 results • Best match
INNER CASING, PT. NO. 17- ASH SLURRY PUMP, IMPELLER WITH NUT FOR ASH SLURRY PUMP
ROTATING/BEARING ASSLY, F/PUMP 14/12 GAH, VOLUTE LINER, PN: G12110A05, PUMP-14/12GAH
Repairing, Re-building of 02 nos worn out portion of Lower and Upper casing along with repairing of impeller of M and P make GST 250 350 pump of ILBL OCP, Lakhanpur Area
Fabrication of 04 nos. new 77 drum pontoons and repairing of 04x77 drums pontoon, 03x33 No. drums pontoon and 03x22 drums pontoon for installation of the pump motors in the mines at SOCP
Supply of Drinking Water with PVC Tank at Ratanpur village of Gopalpur GP under Hemgir Block.(Installation of Solara Dual Pump including laying of HDPE pipe) as per ref proposal sl no-19)
RFP for Selection of Contractor for Design engineering supply installation testing commissioning acceptance of Solar PV integrated Dual Pump based Water Supply System along with CMC for five years pertaining to Rairangpur Division
RFP for Selection of Contractor for Design engineering supply installation testing commissioning acceptance of Solar PV integrated Dual Pump based Water Supply System along with CMC for five years pertaining to Malkangiri Division
RFP for Selection of Contractor for Design engineering supply installation testing commissioning acceptance of Solar PV integrated Dual Pump based Water Supply System along with CMC for five years pertaining to Koraput Division
RFP for Selection of Contractor for Design engineering supply installation testing commissioning acceptance of Solar PV integrated Dual Pump based Water Supply System along with CMC for five years pertaining to Bhanjanagar Division
RFP for Selection of Contractor for Design engineering supply installation testing commissioning acceptance of Solar PV integrated Dual Pump based Water Supply System along with CMC for five years pertaining to Phulbani Division
RFP for Selection of Contractor for Design engineering supply installation testing commissioning acceptance of Solar PV integrated Dual Pump based Water Supply System along with CMC for five years pertaining to Gajapati Division
Supplying all labour, TandP and materials for laying of distribution pipe line with construction of pump chamber, boundary wall, OHT including 5 year OandM at village Baikunthapur of Brahmanigaon G.P under Basudebpur Block
Supplying all labour, TandP and materials for laying of distribution pipe line with construction of pump chamber, boundary wall, OHT including 5 year OandM at village Nachhipur of Bania G.P under Bhadrak Block
Supplying all labour, TandP and materials for laying of distribution pipe line with construction of pump chamber, boundary wall, OHT including 5 year OandM at village Taragana of Berhampur G.P under Bhadrak Block
Distribution pipe line of HDPE GI, construction of pump houses, compound walls, ,SV chambers, Standposts, Chlorination arrangement, with other ancillary works. for Retrofitting to piped water supply scheme to Jhintisasan under Balianta block
RFP for Selection of Contractor for Design engineering supply installation testing commissioning acceptance of Solar PV integrated Dual Pump based Water Supply System along with CMC for five years pertaining to Berhampur Division
Supplying all labour, TandP and materials including all taxes for laying of distribution pipe line with construction of pump chamber, boundary wall, OHT, at village Bishalkana of B.B Kayan G.P under Bonth Block
Supplying all labour, TandP and materials for laying of distribution pipe line with construction of pump chamber, boundary wall, OHT including 5 year OandM at village Chandipur of Pradhanpada G.P under Bonth Block
Supplying all labour, TandP and materials for laying of distribution pipe line with construction of pump chamber, boundary wall, OHT including 5 year OandM at village Pagar of Chandigaon G.P under Bhadrak Block
Supplying all labour, TandP and materials for laying of distribution pipe line with construction of pump chamber, boundary wall, OHT including 5 year OandM at village Basuapada of Erada G.P under Bhadrak Block
Supplying all labour, TandP and materials for laying of distribution pipe line with construction of pump chamber, boundary wall, OHT including 5 year OandM at village Gobindabindha of Aruha G.P under Basudebpur Block
Supplying all labour, TandP and materials for laying of distribution pipe line with construction of pump chamber, boundary wall, OHT including 5 year OandM at village Mulagaon of Betada G.P under Bhadrak Block
Supplying all labour, TandP and materials for laying of distribution pipe line with construction of pump chamber, boundary wall, OHT including 5 year OandM at village Langudi of Haripur G.P under Bhadrak Block
Supplying all labour, TandP and materials for laying of distribution pipe line with construction of pump chamber, boundary wall, OHT including 5 year OandM at village Lunia of Khaparpada G.P under Dhamnagar Block
Supplying all labour, TandP and materials for laying of distribution pipe line with construction of pump chamber, boundary wall, OHT including 5 year OandM at village Kiapada of Arandua G.P under Basudebpur Block
Supplying all labour, TandP and materials for laying of distribution pipe line with construction of pump chamber, boundary wall, OHT including 5 year OandM at village Kantada of Padhani G.P under Dhamnagar Block
Operational work of pump houses at different locations (BHC, Sector-04, Sector-21) in and around Paradip Port on Job Contract basis under P.H. Division (M) for the year 2024-25 (One Year).
Supply of Drinking Water with PVC Tank at Balbaspur village of Gopalpur GP under Hemgir Block.(Installation of Solara Dual Pump including laying of HDPE pipe) as per ref proposal sl no-18)
RFP for Selection of Contractor for Design engineering supply installation testing commissioning acceptance of Solar PV integrated Dual Pump based Water Supply System along with CMC for five years pertaining to Rayagada Division
Supplying all labour, TandP and materials for laying of distribution pipe line with construction of pump chamber, boundary wall, OHT including 5 year OandM at village Uteipur of Anandapur G.P under Dhamnagar Block
Custom Bid for Services - Day to day operation of pump for 2nd stage pumping from water Storage tank near Y curve Siding for a period of 365 days at SOCP IB Valley Area
Ref. Enquiry Cum Offer and BoQ.
1)Supply o fHydraulic flip-top conference table connectivity box / multi-port desk module (Black finish), featuring integrated ports for HDMI, VGA, Audio, LAN, Power, and USB, with built-in cable management cubby designed for seamless multimedia and ... GRW Pump Model ... comprising Pump Sleeve, ...
SWING MOTOR, Part no.817HM01019, PUMP HOC, Part no.817HM91246, SWING MOTOR, Part no.817HM91254, HYDRAULIC PUMP, Part no.VOE17473223, HYDRAULIC PUMP, Part no.VOE17473221, HYDRAULIC PUMP, Part no.VOE17466737, SOLENIOD VALVE ASSY, Part no.VE2203, SOLENIOD VALVE ASSY, Part no.VE2204
Operation, Guarding and other miscellaneous works for operation of high discharge pump and engine sets installed at different locations at Kaniha OCP, Kaniha Area for a period of 02 (two) years (730 days)
BOWL ASSEMBLY, PUMP: BHR 5-18DEG 2-STG, KBL, SHAFT ASSLY, PUMP: BHR 5-18 DEG 2-STG, KBL, IMPELLER ASSLY, PUMP: BHR 5-18DEG 2STG, KBL
BEARING HOUSING, CI, POS: 008 F/PUMP, IMPELLER, BR, P: 031, F/PUMP: ET-ISO32, MATHER
Solar PV integrated dual pump based water supply system through off-grid mode including laying of distribution pipelines and providing (FHTC) along with comprehensive Maintenance for five (5) years in Malkangiri District
Foot Valve, Pump Model-F5826
Facility Management Services - LumpSum Based - Government land; Replacement of fuel injection pump of 75 KVA and 125 KVA DG Set at ARC Charbatia; Consumables to be provided by service provider (inclusive in contract cost)
Dismantling, Erection and Diversion of 3.3 KV overhead lines of 02 nos of pump feeders(VCB-4 and NGEF-3) from north side of mine to west side of Lajkura OCP,IB Valley Area
Fabrication of 02X77 and 05X09 drum new pontoons and repairing of 05X77, 03X33, 03X22 drum pontoons for installation of pump motors in the mines and layout of power cables in the sump at SOCP.
Dust suppression by spraying of water from MTK to Sardega end through Wb no 04 to 10 by 20KL water tanker with pressurized pump and nozzles under GOCP of Basundhara Area for 01 year
Day to day pipeline repair, laying, fitting, shifting and handling of pipeline, installation of pump and motor set for dewatering and tanker loading at mines area at LOCP for a period of 02 years
Day to day Pipe line, Pump shifting, installation work, flange welding, other allied works required for pumping activity related to dewatering of current quarry of Jagannath OCP, JA for a period of One year
Design, supply, installation, testing & commissioning of VS pump, discharge: 94.58 m3/hr at 94.44 mtr bowl head minimum, Bowl efficiency- 78%, Sur discharge head- 16-1/12 inch x 8 inch- AB, Column Ass
50110101151409, 50110101152798, 50110101152535, 50110101152796, 50110101150862
PACKING_GRPHT, 16MM, GLND, PACKING_GRPHT ABS, 22MM, RND, GLND, PACKING_GRPHT, 3BY4IN, GLND, PACKING_1BY2IN, GLND, PACKING_GRPHT ABS, 5BY8IN, RND, GLND, PACKING_GRPHT, 1IN, GLND
Title1, Title2, Title3, Title4, Title5, Title6, Title7, Title8, Title9, Title10, Title11
M3248950000, M3249890000, M3253790000, M3253440000, M3253800006, M3253800007, M3253800008, M3253800009, M3253800013, M3253800015, M3253800016, M3253800019, M3253800020, M3253800021, M3253800022, M3253800023, M3253800033, M3253790046, M3253790047, M3253790048, M3253790049, M3253790053, M3253790055, M3253790056, M3253790059, M3253790060, M3253790061, M3253790062, M3253790063, M3253790071, M3253790073, M3253440001, M3253440002, M3253440003, M3253440004, M3253440005, M3253440006, M3253440007, M3253440008, M3253440009, M3253440010, M3253440011, M3253440013, M3253440014, M3253440015, M3253440016, M3253440017, M3253440018, M3253440019, M3253440020, M3253440022, M3253440026, M3253440027, M3253440032, M3253440036, M3253440037, M3253440039, M3253440046, M3253440047, M3253780006, M3253780007, M3253780008, M3253780009, M3253780011, M3253780013, M3253780015, M3253780016, M3253780019, M3253780020, M3253780021, M3253780022, M3253780023, M3253780031, M3253780033 Bid Number ( ) : GEM/2025/B/6140864 Dated : 30-04-2025 Bid Document 1/53