Loading…
Loading…
5,405 results • Best match
RFP for Selection of Contractor for Design engineering supply installation testing commissioning acceptance of Solar PV integrated Dual Pump based WSS along with CMC for five years pertaining to Kendrapada Athagarh BBSR Puri Angul Deogarh Div
VACUUM PUMP, P01V01002I, THERMAX, VAM, PUMP SPARE KIT, HTHE WITH PIPING MOD, RUBBER DIAPHRAGM 20, SERVICE VALVE, C007130700, HOSE, RI09R01009, 5G 5N H/6, VACUUM HOSE, R109R01016, VACUUM PUMP OIL, P620500010
Distribution pipe line of HDPE GI, construction of pump houses, compound walls, RCC ESRs, UGRs,SV chambers, Standposts, Chlorination arrangement, fitting and fixing IRP with other ancillary works. For retrofitting of PWS scheme to Bainchua under Bali
Supplying of Drinking Water with PVC Tank at Labdajore village near Fittingpada, Chihidhipa 2 nos of Sumura GP under Hemgir Block.(Installation of Solar dual pump including laying of HDPE pipe) as per reference proposal no-08
laying of rising main and Distribution pipe line of HDPE/GI, construction of pump houses, compound walls, RCC ESRs, UGRs,SV chambers, Standposts with other ancillary works. For piped water supply scheme to KAPILESWAR under TANGI Block.
laying of rising main and Distribution pipe line of HDPE/GI, construction of pump houses, compound walls, RCC ESRs, UGRs,SV chambers, Standposts with other ancillary works. For piped water supply scheme to CHAMPADEIPUR under BANAPUR Block
Laying of rising main and Distribution pipe line of HDPE/GI, construction of pump houses, compound walls, RCC ESRs, UGRs,SV chambers, Standposts with other ancillary works. For piped water supply scheme to KOTARI under BANAPUR Block
laying of rising main and Distribution pipe line of HDPE/GI, construction of pump houses, compound walls, RCC ESRs, UGRs,SV chambers, Standposts with other ancillary works. For piped water supply scheme to GOTAPALLI under BANAPUR Block
Laying of rising main and Distribution pipe line of HDPE/GI, construction of pump houses, compound walls, RCC ESRs, UGRs,SV chambers, Standposts with other ancillary works. For piped water supply scheme to Anda under Khordha block.
Fabrication of 03X 77 and 12X09 new drum pontoons and repairing of 04X77, 02X33, 03X22 old pontoons for installation of pump motors in the mines and layout of HT cables in Sumps at SOCP, IB valley Area.
laying of rising main and Distribution pipe line of HDPE/GI, construction of pump houses, compound walls, RCC ESRs, UGRs,SV chambers, Standposts with other ancillary works. For piped water supply scheme to Beruhan under Khordha block
REPAIR AND MAINTENACE OF EXTERNAL ELECTRIFICATION WATER DISTRIBUTION LINES HANGER DOOR FIRE ALARM SYSTEM FIRE FIGHTING PIPELINE AND HYDRANTS PUMP AND MOTORS DISPERSAL LIGHT LIGHTING PROTECTION STREET LIGHTS GARDEN LIGHTS HIGH MAST LIGHTS DG SET AT CG
Erection and dismantling of lighting line and light fitting in OB Face, OB dump, Haul road, HT drilling Area, Near Pump and Coal patches in Quarry no 4, 5 and 7 at Lakhanpur OCP, Lakhanpur Area, MCL
laying of rising main and Distribution pipe line of HDPE/GI, construction of pump houses, compound walls, RCC ESRs, UGRs,SV chambers, Standposts with other ancillary works. For piped water supply scheme to Gaudaput under Khordha block
Distribution pipe line of HDPE GI, construction of pump houses, compound walls, RCC ESRs, ,SV chambers, Standposts, Chlorination arrangement, fitting and fixing IRP, FHTC with other anciary works. For PWS scheme to Malipada Aug. under BBSR Block
Installation alignment commissioning of pump-diesel engine/electric motor set on pontoon,repair of pontoon,laying adding of MS pipe with flange welding,earth cutting,surface leveling,heap cutting and dismantling of MSpipe,steel structure for fogcanon
Laying of rising main and Distribution pipe line of HDPE/GI, construction of pump houses, compound walls, RCC ESRs, UGRs,SV chambers, Standposts with other ancillary works. For piped water supply scheme to Lingipur under BBSR block
Laying of rising main and Distribution pipe line of HDPE/GI, construction of pump houses, compound walls, RCC ESRs, UGRs,SV chambers, Standposts with other ancillary works. For piped water supply scheme to ARANGA under BANAPUR Block
Construction of Elevated Water Tank of 30000 Ltr. capacity with Fixing of Pump after sinking of 1 No. of 150/200mm dia production well at Cluster No. 1, Maheswarpur for the D.Ps. of village Chamakpur under KIP
Installation, alignment and commissioning of pump with diesel engine and electric motor, laying of MS pipeline with flange welding, fabrication of tee and bends, collection of pipes, dismantling of MS pipes, repairing of pontoon, maintenance of sprin
Repairing of 02 nos. of 84 drum pontoon by replacement of damaged drum and fabrication of 03 nos. of transportation pontoon to ensure smooth pumping and maintenance activities for pump operation at Belpahar OCM, Lakhanpur Area, MCL.
Erection and dismantling of lighting line and light fitting in OB Face, OB dump, Haul road, HT drilling Area, Near Pump and Coal patches in Quarry no 1, 3 ad 6 at Lakhanpur OCP, Lakhanpur Area, MCL.
Laying of rising main and Distribution pipe line of HDPE,GI, construction of pump houses, compound walls, RCC ESRs, UGRs,SV chambers, Standposts with other ancillary works. For piped water supply scheme to Chiramaru under Begunia block.
Construction of Elevated Water Tank of 30000 Ltr. Capacity with fixing of pump after sinking of 1 No. of 150/200mm dia production well at Cluster No. 5, Naradpur Nunisahi for the D.Ps. village Chamakpur under KIP
Replacement of roofing at washing plant,pump room,grease room,tyre pressure filling station,lubricant room,E and M section cycle stand and renovation of blasting and dozer section office rooms at Jambubahali workshop of Bharatpur Project.
Supply and fixing of High Voltage Insulating Mat IS 15652, ISI Mark, Thickness,3 mm in the Main Substation, Mine Substation and Pump Starter/Switch sheds at Coal face sump and Central sump of Jagannath Colliery, JA
REPAIR AND MAINTENANCE OF INTERNAL ELECTRIFICATION COOLING APPLIANCES ELECTRIC SUPPLY LT CABLES LT PANELS BOLLARD LIGHTING STREET LIGHT ELECTRIC POLES EXTERNAL WATER DISTRIBUTION LINES PUMP MOTORS AND DG SETS AND OTHER CONNECTED WORKS AT CGRA AND OTM
M3182030001, M3182030002, M3182030003, M3182030013, M3182030014, M3182030015
1000070419_1_72872000040, 1000070419_2_72872000350, 1000070419_3_72872000420, 1000070419_4_72872000800, 1000070419_5_72872000970, 1000070419_6_72872001300, 1000070419_7_72872001540, 1000070419_8_72872002280, 1000070419_9_72872002420, 1000070419_10_72872000730, 1000070419_11_72872000280, 1000070419_12_72872000660, 1000070419_13_72872001610, 1000070419_14_72872001780, 1000070419_15_72872001850, 1000070419_16_72872002590, 1000070419_17_72872000740, 1000070419_18_72872000750
PACKING GRPHT, 3 BY4 IN, GLND, PACKING1BY2 IN, G LND, PACKING GRPHT CTTN, 16MM, GLN D, PACKING GRPHT, 3BY8IN, GLND, PACKING GRSE, G RPHT, 1IN, PACKING GRPHT, 22MM, BOLT HEX, MS, 4.6, FULL, 5BY8 IN, 2.5IN, W NUT W, BOLT HEX, MS, 4.6, FULL, 3BY4 IN, 4IN, W NUT, BOLT HEX, MS, 4.6, FULL, 3BY4 IN, 5IN, W NUT, BOLT HEX, MS, 4.6, HALF, 3BY4 IN, 3IN, W NUT, BOLT HEX, MS, 4.6, FULL, 5BY8 IN, 2IN, W NUT, BOLT HEX, MS, 4.6, FULL, 5BY8 IN, 4IN, W NUT, GREASE GUN 5KG, HND OPRTD, HAMMER SLDGE, 1.5KG, WOOD, WRENCH SET BX, 8 TO 32MM W SPANNER RACHED, COUPLING F 140, TYRE, RING F 120, TYRE CPLNG SET, GASKET STEAM JNT, 1 BY 8IN, GASKET HP, NON MTTLC, STEAM JNTNG, 1.6MM, Adjustable Single Ended Open Jaw Wrench as per IS 6131 (Q3)
6158191503, 8955600504, 8955600204, 8955600104, 8955600054
Plastic Body Evaporative Coolers-DESERT COOLER Plastic Body Evaporative Coolers-DESERT COOLER ( 35 ) Technical Specifications Specification Specification Name Values Allowed Values CAPACITY/TYPE Nominal cooling capacity ([Cu.M/hr] @ WATT) 2000 ... - Submersible Pump Conforming ...
Hydraulic cylinder seal kit DW-02872, Hydraulic pump valve plate 1700542, Hydraulic hose GHI89589, Hydraulic pump overhauling seal kit 120228
1.71160022439 KIT-SENSORS QST30/3238993 (Q3), 2.71160022619 3093635/2881835 PUMP INJE BOSCH (Q3), 3.71160022629 3093636/2881834 KIT FUEL PUMP (Q3)
HYDRAULIC TORQUE WRENCHES, EP 1000 POWERPACK PUMP
Sports Thigh Pads (Q3), Air pump (Q4)
INNER ELEMENT ASSLY, PUMP: BGM-GH, HITACHI
HYDRAULIC TORQUE WRENCHES, EP 1000 POWERPACK PUMP
IMPELLER ASSLY, F/PUMP: CPS250/500, SINTECH
Overhauling, Making , Machning of gear pinion, input shaft and complete set of Gear box of clarifoctor Tank, providing of neck ring of ASP-200E pump and casting, machining, of cast steel coupling of bleaching section at IWSS, LA
Laying fitting MS or HDPE pipe 8inch or 10inch dia vertically from Quarry pump to discharge point at North OB Bench side and dismantling old range with extension of 2 range partially at Quarry LOCP, IB Valley Area
Installation, alignment and commissioning of pump with diesel and electric engine, laying of MS Pipeline with flange welding, fabrication of tee and bends, collection of pipes, dismantling of MS pipes, fabrication and repairing of pontoon and other m
Erection and dismantling of lighting line and light fitting in OB Face, OB dump, Haul road, HT drilling Area, Near Pump and Coal patches in Quarry No-1, 3 and 6 at Lakhanpur Open Cast Project, Lakhanpur Area
Erection and dismantling of lighting line and light fitting in OB Face, OB dump, Haul road, HT drilling Area, Near Pump and Coal patches in Quarry No-1, 3 and 6 at Lakhanpur Open Cast Project, Lakhanpur Area
Erection N dismantling of lighting line and light fitting in OB Face, OB Dump, Haul road, HT drilling Area, Near Pump and Coal patches in Quarry No-4,5 and 7 at Lakhanpur Open Cast Project, Lakhanpur Area, MCL
Construction of Elevated Water Tank of 30000 Ltr. capacity with fixing of pump after sinking of 1 No. of 150/200mm dia production well at cluster No. 4, Kodagadia Purunadihi for the D.Ps. of village Chamakpur under KIP
Bearing Retainer, Dimension (39* 15* 16*) CI FG-200 IS:210, 8" THD COL fitted with rubber bearing of 50 HP vertical turbine pump, 25000 USGPH ( 94.58 MTR CUB/HR) 300 ft head ,27 mtr column. Item code-
Custom Bid for Services - Loading unloading handling laying and jumpering on over head lines of PVC Powercable and AAAC and store workshop and field to work place for day to day field switch and pump starter shifting work
Custom Bid for Services - Operation of Pump installed at Orient Area Mine No 02 for providing water to RLS for a period of 03 years Similar Category Manpower Outsourcing Services - Man-days based Manpower Outsourcing Services - Minimum wage
Hydraulic jack without Pump, 50kN, 4 Nos Hydraulic Jack without Pump, 100kN, 2 Nos Hydraulic jack without Pump, 250kN, 2 Nos Motorized Hydraulic Pum, 3 Nos 50kN Load Cell with Display Unit, 4 Nos