Loading…
Loading…
5,405 results • Best match
As per tender documents
ROTATING ASSLY WITH COMPLETE, Part no.1100, NECK RING, CF8M, Part no.1181CF8M, BEARING LOCK NUT AND WASHER, MOC STD, Part no.30103020, IMPELLER, CF8M, Part no.1500CF8M, BEARING HOUSING NDE, CI, Part no.2764, BEARING HOUSING DE, CI, Part no.2761, SHAFT WITH KEY, Part no.1800, GLAND CI, Part no.2310, SLEEVE NUT MOC SS410, Part no.3032, SHAFT SLEEVE, SS410, Part no.2100SS410, BEARINGS, MOC - STD, Part no.2600, O RING, Part no.4250, THRUST COLLAR, Part no.2884, LANTERN RING, Part no.2300, ROTATING ASSEMBLY, Part no.CF8M
M3154140001, M3154140002, M3154140003, M3154140004, M3154140005, M3154140006, M3154140008, M3154180001, M3154180002, M3154180003, M3154180004, M3154180005, M3154180006, M3154180008, M3154180012, M3154180013, M3154100001, M3154100002, M3154100003, M3154100004, M3154100005, M3154100006, M3154100008, M3154100009, M3154100010, M3154100011, M3154100031, M3154100034, M3154100036, M3154100037, M3154100038, M3154100042, M3154120001, M3154120002, M3154120003, M3154120004, M3154120005, M3154120007, M3154120008, M3154120009, M3154120011, M3154120013 Bid Number : GEM/2025/B/7053043 Dated : 10-01-2026 Bid Document 1/35
CUPLING FLANGE FOR FALP, IMPELLER WITH WEAR RING FOR FALP, SHAFT WITH KEY & CHECK NUT FOR FALP, SHAFT SLEEVE FOR FALP, Neck ring CF8M SDB 200 250 FALP, Stuffing box bush SDB 200 250 FALP, Lantern ring ss410 SDB 200 250 FALP, water thrower CI SDB 200 250 FALP, WaterthrowerO ringplasticSDB 200 250FALP, FALP SDB 200 250 Coupling Rubber Bush, Pin Collar Nut Rubber Bush
62030002180, 62030002210, 62030002250, 62030002260, 62030002370, 62030002130, 62030002350, 62030002380
31723704540, 31723704550, 31723704580, 31723704600, 31723704610, 31723704620, 31723704680, 31723704720, 31723704800, 31723704810, 31723704820, 31723704830
1000072760_1_72843000100, 1000072760_2_72843000110, 1000072760_3_72843000150, 1000072760_4_72843000160, 1000072760_5_72843000370, 1000072760_6_72843000260, 1000072760_7_72843000270, 1000072760_8_72843000300, 1000072760_9_72843000310, 1000072760_10_72843000330, 1000072760_11_72843000340, 1000072760_12_72843000380, 1000072760_13_72843000400, 1000072760_14_72843000410, 1000072760_15_72843000450, 1000072760_16_72843000700, 1000072760_17_72843000470, 1000072760_18_72843000480, 1000072760_19_72843000690, 1000072760_20_72843000520, 1000072760_21_72843000540, 1000072760_22_72843000550, 1000072760_23_72843000580, 1000072760_24_72843000590, 1000072760_25_72843000610, 1000072760_26_72843000620, 1000072760_27_72843000660, 1000072760_28_72843002040, 1000072760_29_72843002050, 1000072760_30_72843002070, 1000072760_31_72843002110, 1000072760_32_72843002120, 1000072760_33_72843002160, 1000072760_34_72843002170, 1000072760_35_72843000240, 1000072760_36_72843000180, 1000072760_37_72843000190, 1000072760_38_72843000230, 1000072760_39_72843000670, 1000072760_40_72843003500, 1000072760_41_72843003510
UPPER AND LOWER CASING CI_Part no_18, ROTATING ASSEMBLY COMPLETE WITH BRONZE I_Part no_17, IMPELLER-CI_Part no_SDD25035002, SHAFT WITH SLEEVE by NUT AND IMPELLER KEY-E_Part no_05, SHAFT SLEEVE BRONZE_Part no_SDD250350009, CASING WEAR RING_Part no_SDD25035006, BEARING HOUSING DE CI_Part no_SDD250350002, BEARING HOUSING NDE CI_Part no_ SDD250350003, CAP BEARING CI_Part no_ SDD250350004
SLUICE VALVE HEAVY DUTY CAST STEEL 250MM, NON RETURN VALVE HEAVY DUTY CAST STEEL 250MM, MS FLANGES 6 INCH DIA, MS FLANGES 300MM DIA, MS FLANGES 200MM DIA, MS FLANGES 250MM DIA, MS FLANGES 100MM DIA, JETTING HOSES HEAVY DUTY 250MM 6MTR
M3343580020, M3343580044, M3343580025, M3343580024, M3343580026, M3343580005, M3343580012, M3343580038, M3343580013, M3343580009, M3343580011, M3343580022, M3343580019, M3342750027, M3343580032, M3343580033, M3343580006, M3342750046, M3343010000, M3342020000
32508008040, 32508002040, 32508007090, 32508013020, 32508006040, 32508005090, 32508009090, 32508010070
Fabrication of base plate for 6UP4F and DSM4RM pump for installation at colony water supply along with matching pipeline with valve, making foundation and covering with GI sheet for water supply to Adarshnagar colony LOCP
Distribution pipe line of HDPE GI, construction of pump houses, compound walls, RCC ESRs, ,SV chambers, Standposts, Chlorination arrangement, fitting and fixing IRP, FHTC with other ancillary works. For PWS scheme to Bhingarpur Balianta Block
Day to day Pipe line, Pump shifting,installation work, flange welding, other allied works required for pumping activity related to dewatering of current quarry of Ananta OCP, Jagannath Area for a period of One year
Distribution pipe line of HDPE GI, Construction of pump houses, compound walls, RCC ESRs, ,SV chambers, Standposts, Chlorination arrangement, fitting and fixing IRP with other ancillary works. For PWS scheme to Kajipur under Balianta block
Bi-annual contract for daily issue of materials at unit store and loading,unloading of materials received from regional store and also to operate/filling diesel in HEMMs at HSD pump unit of Lajkura OCP.
AMC works for day to day pipe line works, flange supply and welding, pump shifting and miscellaneous works in the mines of Ananta OCP for a period of one year as and when required basis
Day to day pipeline, pump shifting and installation work, flange welding, other allied works required for pumping activity related to dewatering of current quarry of Jagannath OCP, Jagannath Area for a period of one year
Procurement of Mechanical Seal Repair spares for 70-P-1003 A/B (DE and NDE) Pump Tag of PRU on Proprietary Basis from M/s Eagle Burgmann India Pvt. Ltd. Make at IOCL Paradip Refinery
RFP for Selection of Contractor for Design engineering supply installation testing commissioning acceptance of Solar PV integrated Dual Pump based Water Supply System along with CMC for five years pertaining to Kalahandi and Nuapada Divisions
THE SYSTEM DESIGN DRAWING FABRICATION MODIFICATION OF SLURRY BMD TO DOPED EMULSION BMD TESTING, SUPPLY AND COMMISSIONING OF RE PUMPABLE BULK EMULSION EXPLOSIVES DELIVERY UNITS PUMP TRUCKS INCLUDING DELIVERY CHARGES TRANSPORTING FROM BOLANI AND RETURN
Distribution pipe line of HDPE GI, construction of pump houses, compound walls, RCC ESRs, UGRs,SV chambers, Standposts, Chlorination arrangement, with other ancillary works. For retrofitting of piped water supply scheme to Bodhakhandi under Balianta
Distribution pipe line of HDPE GI, Construction of pump houses, compound walls, RCC ESRs, ,SV chambers, Standposts, Chlorination arrangement, fitting and fixing IRP with other ancillary works for PWS scheme to Taraboi under Balipatna block
Providing and fixing of End Termination Kits for HT power cables installed for feeding power to various equipments like Lighting Transformers, Load Break Switches, Pump Starters installed at multiple locations in Lingaraj OCP, Lingaraj area
Day to day Pipe line, Pump shifting, installation work, flange supply, welding, other allied works required for pumping activity related to dewatering of current quarry of Ananta OCP, JA for a period of One year
Supplying all labour, TandP and materials including all taxes for laying of distribution pipe line with construction of pump chamber, boundary wall, OHT, at village Dhanaghar in Bonth Block Chhanchina and Kanti in B.Pokhari Block
RFP for Selection of Contractor for Design engineering supply installation testing commissioning acceptance of Solar PV integrated Dual Pump based Water Supply System along with CMC for five years pertaining to Bargarh and Sonepur Divisions
Custom Bid for Services - Loading unloading handling laying and jumpering on overhead lines of PVC Power Cable or AAAC for day to day field switch and pump starter shifting work Similar Category Electric Cabling Service
LINE SHAFT (BOTTOM) 103 11/16 INCH, LINE SHAFT (TOP) 41 15/16 INCH, PUMP SHAFT., LINE SHAFT COUPLING FOR ACW PUMP, HEAD SHAFT (AISI-304) FOR ACW PUMP
Main Supply-RAW WATER PUMPS PT DISCHARGE HEADER FLOW -900 NB, TAG NO-90GAA10CF011, Main Supply-RAW WATER PUMPS ASH DISCHARGE HEADER FLOW-600 NB, TAG NO-90GAA20CF011, Mandatory Spares-Transmitters for electromagnetic flow meter-2 Nos. of each type and model., Site Visit -Charges Per Visit, Site Visit -Charges Per Mandays
Custom Bid for Services - O/H OF HEAT EXCHANGERS, PUMPS & OTHER AUXILLIARY JOBS Similar Category Repair, Maintenance and Installation of Plant Systems/Equipments
Distribution pipe line of HDPE/GI, construction of pump houses, compound walls, RCC ESRs UGR, ,SV chambers, Standposts, Chlorination arrangement, fitting and fixing IRP with other ancillary works. For PWS scheme to Athantara under Balipatna block
RFP for Selection of Contractor for Design engineering supply installation testing commissioning acceptance of Solar PV integrated Dual Pump based Water Supply System along with CMC for five years pertaining to Balasore Bhadrak Baripada Keonjhar
1.69006001190 Sprinkler Kit, 2.69006001200 WATER PUMP
Spray painting of transformers, in door/outdoor MOCB panels, field switches, pump starters and motor, aluminium brush painting of sub-station yard structures , H.T / L.T electric poles , identification of poles at Lakhanpur OCP,Lakhanpur Area,MCL
Laying of rising main and Distribution pipe line of HDPEGI, construction of pump houses, compound walls, RCC ESRs, UGRs,SV chambers, Standposts with other ancillary works. For piped water supply scheme to Sahaspur under Banapur block
Distribution pipe line of HDPE/GI, construction of pump houses, compound walls, RCC ESRs UGR, ,SV chambers, Standposts, Chlorination arrangement, fitting and fixing IRP with other ancillary works. For PWS scheme to Guapur under Balipatna block
Distribution pipe line of HDPE GI, construction of pump houses, compound walls, RCC ESRs, ,SV chambers, Standposts, Chlorination arrangement, fitting and fixing IRP, FHTC with other ancillary works. For PWS scheme to Amanakuda under Balipatna Block
Distribution pipe line of HDPE GI, construction of pump houses, compound walls, RCC ESRs UGR, ,SV chambers, Standposts, Chlorination arrangement, fitting and fixing IRP with other ancillary works. For PWS scheme to Abhayamukhi under Balipatna block
Installation alignment commissioning of pump-diesel engine/electric motor set on pontoon,repair of pontoon Laying of MSpipe with flange welding,earth cutting,surface leveling,heap cutting and dismantling MSpipe for firefighting and dewatering at KOCP
Dismantling, Shifting and Installation of Booster Pump from MTK to Stock No. 02 with reconditioning of Existing pipeline network of 100mm and 150 mm dia MS pipe for sprinkler operation at Garjanbahal OCP, of Basundhara Area
Fabrication and painting of 2 Nos of stand frame for supporting of (250 hp and 330 hp ) stand by motor of Vertical Turbine Pump for Phase-I and Phase-II of Intake well, IWSS, Lingaraj Area
Repairing, Supply, Fixing ,Overhauling and Testing Tripping System of different Rated (KW) of Pump Motors Star Delta Starters set and LT Control Panel of main Power Supply System of Main transformer at IWSS, BIT Colony, LKPA.
Distribution pipe line of HDPE GI, construction of pump houses, compound walls, RCC ESRs UGR, ,SV chambers, Standposts, Chlorination arrangement, fitting and fixing IRP with other ancillary works. For PWS scheme to Biswanathpur under Balipatna block
Providing and Fixing of LED strip in poles, focusing light, Garden Light, Fountain Pump with all accessories, wall fan and erection of poles, laying of cables etc for development of Eco Park, Mine no.4,OSA
Distribution pipe line of HDPE GI, construction of pump houses, compound walls, RCC ESRs, UGRs, SV chambers, Standposts, Chlorination arrangement, fitting and fixing IRP with other ancillary works. For retrofitting PWS scheme to Benupur under Baliant
Installation Alignment Commissioning of pump-diesel engine/electric motor set on pontoon,repair of pontoon and laying adding of MSpipe with flange welding including earth cutting,surface leveling,heap cutting Dismantling of MS pipeline for dewatering
Distribution pipe line of HDPE GI, Construction of pump houses, compound walls, RCC ESRs, ,SV chambers, Standposts, Chlorination arrangement, fitting and fixing IRP with other ancillary works. For Retrofitting to PWS to Balipatna under Balipatna bloc
Supplying of Drinking Water with PVC Tank at Labdajore village near School and AWC of Sumura GP under Hemgir Block.(Installation of Solar dual pump including laying of HDPE pipe) as per reference proposal no-07.
Emergency breakdown repairing, maintenance and testing of HT and LT Electrical Equipments OCBs, VCBs, Power Transformers and Pump Starter Panels for a period of 730 days at Balanda Colony of Jagannath Colliery as when as required