Sub Work Dismantling of existing structures at Km.51/8 to 52/2 of Anantapuramu - Tadipatri - Bhogasamudram road under main work of Construction of ROB in Tadipatri town limits in lieu of LC No.161 at Railway Km.366/2-3 of Gooty - Renigunta section at Km.51/6 of Anantapuramu - Tadipatri - Bhogasamudram road in Anantapuramu District
Laying of C C road near Pinapadu Edga b) Maintenanace and Improvements of C C Roads From Madras Railway track to Pinapadu Community Hall,Dno:13-2-1 to D No:13-6-72 in Kancharala Vari Street & D No:13-6-62 to D No:13-6-63 in Akkala Vari Street in Ward 25th of Tenali Municipality
Maintainance and improvements of A) Construction of 600mm TD CC Drain (One side) in Balijepalli Street at Postal Employees Co-Operative Society, Opposite to Repalle Railway Gate and B) Maintainance and Improvements of 300mm dia CC Drain (One side) from D.No. 14-24-3 to D.No. 14-21-8 in Mohammad street Ward No.21 of Tenali Municipality
Removal of Wet Silt in open drain from Abhudaya Nagar 1st line to up to Cross Vagu (Sivanagaraju Colony Main Road), from Abhudya Nagar 1st line to upto road crossing Vagu (along Railway Compound Wall) and Ratnapuri Colony Veeramanu Kunta to Velangini Nagar Vagu Via Kondaiah Colony in Div. No.46 and 47 under AE-6 Section
Sub Work Dismantling of encroached buildings of Anantapuramu side of ROB from Km 1/050 to 1/420 under the main work of Construction of ROB in lieu of LC No 127 at Railway Km.210/1 to 2 of Gooty to Dharmavaram section at Km.1/4-6 of Anantapuramu to Thogarakunta road in Anantapuramu District
Providing and fixing of Gantry sign boards in Km. 0/0 to 1/0 of Dharmavaram - Kalyandurg road in Ananthapuramu District under the main work of Construction of ROB at Km. 0/6 to 0/8 of Dharmavaram-Kalyandurg road at Railway Km. 176/4-5 in lieu of LC No. 113 of Dharmavaram - Penukonda section in Ananthapuramu District
Supply and fixing of 200W Day lamps 8mm LED serial sets High mast iron rings 125KVA Genertor set silent type on hire basis for the festival Sri Vinayaka Chaviti Nimarjanam at Nallukalla Mandapam to Railway track road and Gopuram street Setty gunta road on 18.09.2023 as a trail run and 19.09.2023 to 23.03.2023 providing lighting for 5 Days
Desiltation of Existing Major Drains with JCB from 1 to 39 wards(i.e HB Colony,Chinaranaganipalem main drain,7th ward Nehuru nagar,Ganbhir Doddi-ST colony-BC colony,Neeladri Hospital to Irrigation Office,Undi Krishna Mandhiram to Rajula Peta(JCB) ... road Railway gate ...
Supply, Delivery of 60 Watt and 45 Watt LED Stret Light Fixtures for fixing in the place of Low wattege Fittings in different area Junctions and repairs, laying of cable in New H.D.P.E. Pipe with necessary Clamps at Manipuram Bridge down Railway Cabin Road for maintenance of street Lighting under A.E -15(STL) /East Constituency, Guntur.
Mansoon Action plan-2026 Removal of wet silt in CC Out fall drain at Reddypalem road from Sarada coloy 31st line to sanjeevaiah nagar railway gate and Vasantharayapuram main road from Sarada colony Arch center to Donka road and Donka road from 3bridges to tagoor statue North side in Div No 53 and 55 under AE-14 Section.
Main Work: Construction of 'Road Over Bridge' in lieu of L.C.No.7 at Railway Km. 12/2-4 of Samalkota - Kakinada Section and on Nageswararao Street from Kakinada - Rajahmundry road at Z.P. Junction to NH-214 at Bhanugudi Junction in Kakinada City limits in E.G.Dist. Sub Work: Providing Road Safety Intervention items to the Road Over Bridge(3rd call)
Providing Inter Connections on Pumping main line from Nehrunagar Reservoir to HLR Reservoir at Various places A at Sanjeevaiah nagar railway gate in between old PSC 800 mm dia pumping main line to New 900mm Dia DI Pipe line B at HLR ELSR Compound from New 900mm Dia DI Pipe line to Existing pipe line Under AE-6 Section.
Main Work: Construction of 'Road Over Bridge' in lieu of L.C.No.7 at Railway Km.12/2-4 of Samalkota - Kakinada Section and on Nageswararao street from Kakinada - Rajahmundry road at Z.P. Junction to NH-214 at Bhanugudi Junction in Kakinada City limits in E.G.Dist Sub Work: Providing Road Safety Intervention items to the Road Over Bridge (2nd call)
Construction of ROB at Eluru in lieu of LC no 351 at Railway km 489/16/18 of Vijayawada to Visakhspatnam sectionon km 66/10 of Vijayawada to Visakhapatnam road (OLD NH 5) to OLD CRP road at Eluru in West Godavari District. Sub - Work: Consultancy services for survery, Investigation and preparation of Detailed Project report including proof checking
Removal of Wet Silt in Open drain from Abhudaya Nagar 1st line to up to Cross Vagu (Siva Nagaraju Colony Main Road), from Abyudhaya Nagar 1st line to up to road crossing Vagu (along Railway Compound Wall), Rajeswararao Colony Main Road and Rajeev Gandhi Nagar 10th line 6th lines in Div. No.54 under AE-6 Section.
Removal of wet silt In Open drain from Abhudaya Nagar 1st line to up to Cross Vagu(sivangaraju colony main road),from abyudhayanagar 1st line to up to road crossing Vagu (along railway compound wall), Rajeswara rao colony main road and Rajeev Gandhi nagar 10th line 6th lines in Div No 54 under AE-6 Section
Strengthening of Bank on Mogaltur Major drain from Poolalli graveyard to Railway track in Poolapalli Gollavani Cheruvu village limits
"Improvements to the Donkinavalasa railway feeder road from km 0/0 to 1/0 in Vizianagaram District (2nd Call) "
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover
Urethral Catheter (Q2) ( ( 3 3 ))
Gravity Feed Transfusion Set (Q2) (3 (3 ))
Digital Medical X - Ray Films (V2) (Q2) (3 (3 ))
Urine Collection Bag (V2) (Q2) ( ( 3 3 ))
Cleaning, Sanitation and Disinfection Service - Outcome Based - Railway Hospital area; AS PER SCOPE OF WORK; AS PER SCOPE OF WORK
Rewiring of Office building and Providing approach road lighting from gate entrance providing railway side lighting and other allied works
Construction of VRCC Drian from Chukkavanipalem RH Colony to Railway under bridge in W.No. 69 of Greater Visakhapatnam Municipal Corporation
Cleaning, Sanitation and Disinfection Service - Outcome Based - Railway Hospital area; AS PER SCOPE OF WORK; AS PER SCOPE OF WORK
Supply of Ballast Crushing of contractor's hardstone using mechanized crusher to 50mm gauge of 23391 Cum (as per specifications), transporting the same to Kantakapalli (KPL) station depot, unloading and stacking on level ground including dressing of ... into Railway wagons ...
Supply, Erection, Testing and commissioning of Alteration to existing EI at RGDA Ph-II station and Phase work of LDX Ph-II station involving Indoor & Outdoor Signalling and Telecommunication works in LDX-RGDA Section under Package-5A in connection ... Coast Railway in ...
Construction of 450mm type design drain at required places, kerb walls on either side, foot path on either side ,with high strength CC tiles and paintings to kerb walls, providing repairs to existing drains, cover slabs, RCC gratings etc., under ... from Railway underpass ...
"Supply and Spreading of Crusher dust, LDPE Sheet and 20mm HBG metal in LV PTR Bays of all 132/33KV Power Transformers & 220/132KV 100MVA Power Transformers-1&2 and Feeder bays of 132KV Rajanagaram, 132KV Peddapuram, 132KV R.V.K. Feeders, 132KV ... 132KV Railway traction ...
Construction of ROB in Lieu of LC No. 158 (Kavali Yard) at Railway Km 225/14-16 of Guduru - Vijayawada Section at Km 0/0-6 of Kavali - Pedapavani Road in Nellore District. Su Work :- Dismantling of Structures and removal of debris from Km 0/0 to 1/0 of Kavali-Pedapavani Road for construction of ROB in Lieu of LC No. 158
(A) Special Repairs fromfrom km 0/0 to 3/530 of Chandragiri Railway feeder Road in Tirupati District (B)Special Repairs from km 0/0 to 13/550(working reach from km 2/0 to 3/0,6/4 to 8/0 km 9/650 to 10/0 and 12/2 to 13/880) of Damalacheruvu-Nendragunta Road in Tirupati Districte
Construction of CC Drains from i) EP.No.BST/2 to EP.No.BST/2-1 ,ii) H.NO.2-32 to Existing Railway Drain, iii) EP.No.HM/B-8 to EP.No.HM/B-19, iv) H.No.1-1 to H.No.1-14, v) EP.No.SNT/A-19 to EP.No.SNT/A-22,vi) H.No.1-37-2-10 to H.No.1-38-3-1 in ward No.16&17.
Providing of CC Road Patches and drain patches at D.No.13-730, 13-1-875, 13-2-66-2, 13-2-182, 13-2-179, 13-2-146 to 13-2-190-1, 13-2-452, 13-2-547, 13-2-700, Rc nagar Railway gate, 13-670, 13-678, 13-2-27 in 4th Division, Anantapuramu Under General Funds.
Execution of Through Sleeper Renewal (Primary ) Works like 1. TSR(P) for a length of 19.731 TrKm with Railway PQRS between Palasa-Vizianagaram-Donkinavalasa section. 2.TSR(P) for a length of 6.45 TrKm Manual between Palasa-Vizianagaram- Donkinavalasa section. 3.TSR(P) for a length of 3.876 TrKm Manual at VZM Yard on UP & DN line under ADEN/VZM jurisdiction.
SW I: Proposal for Provision for augmentation of hostel capacity from 240 to 340 beds at ETTC/BZA. SW-II : BZA - Proposal for Construction of New Ladies hostel at ETTC/BZA to cater to the female trainees from Running, TRS, TRD branches of entire S.C. ... S.C. Railway . ...
Supply and Testing of 09 Nos ABT Meters with RS232 RS485 and Ethernet Ports with DLMS Protocol. Make:SECURE APEX 150 or similar. Note:1) CT Ratio: 200/1A - 5 Nos, 150/1A- 4 Nos, PT Ratio: 132KV/110V, 3 phase 4 wire meters. 2) The Meters Testing ... of Railway APTRANSCO ...
Safety Footwear For Railway Trackmen (Q1) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM ... Central Railway , ...
Monthly Basis Cab & Taxi Hiring Services - SUV; 2000 km x 320 hours; Outstation 24*7
Monthly Basis Cab & Taxi Hiring Services - SUV; 2000 km x 320 hours; Outstation 24*7
Erection of 33kV Transmission Line on Rail Poles from MST Switchgear to 6 Pole Structure Near Railway Gate at NTPC Simhadri
Improvements to KBM - SBM Road Railway Feeder road (via) Savarapeta from km 0/0 to 4/200 in Srikakulam District (SKOD044)
Urgent repairs to reconstruction of damaged pipe culvert at km 1/ 2-4 of Bayyavaram- Bayyavaram railway gate in Anakapalli District.
Welding Cable (V2) as per IS 9857 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In ... Central Railway , ...
Repairs to existing foothpath and kerb painting from railway west booking counter to K.R.Market in 54th division, circle-1 area. (1st call)
Engaging of Excavator for Desiltation of Uppu Kaluva from Railway Under Bridge at Hindhu Burial Ground to Bhavani Nagar in Puttur Municipality
painting of 25No.s rusted MS towers with one coat of red oxide,one coat of aluminium paint and painting of tower legs with black paint at loc.no.8,9,14,15,91,92,95,97,120,121,130,131,133,134,135,135A,136,145,146,158,159 of 132KV araku-machkund DC ... araku-similiguda-tyda railway DC ...
De-silting of Pucca Drains i). From ZP School Junction to Railway Track along KN Road in 8th & 10th wards, ii). From Mosque to Old fly Over and Sri Eli Anjaneyulu Mpl. Shopping Complex to Old Fly Over in 10th ward, iii). From Kanaka Durga Temple to Masjid Road in 10th ward and From Chinna Anjaneya Swamy Temple to Pillalakarra Vari Street Junction in 7th ward.
Main work : Cargo Terminal under GCT Policy at Kopparthy with Serving Station as Krishnapuram in YSR Kadapa District, Andhra Pradesh under Gati Shakti Terminal Policy. Sub Work : Supplying, Stacking & laying of Track Ballast, Permanent Way Materials, ... for railway siding ...