2,629 results • Best match
Construction/Maintenance of Building
Job Contract for clerical job at office for Dismantling and Decommissioning group, Railway Siding work and rest of old PTPS Operational facilities under PVUNL, Patratu.
Construction of 265 meters length and 3 meters height boundary wall including barbed wire fencing of HZL, railway siding for SILO project under Govindpur Area
Transportation of coal by mechanical mean from Coal Dump(s) of Bastacolla colliery to BNR Railway Siding including allied jobs in Bastacolla Area of BCCL.
Supply/fitting with wooden bet of belcha, Gaita, Kudal, Hammer, (as per size) and Gamala, Shovel etc of North Urimari Railway Siding of Birsa Project.
Construction of Railway Siding including Earthwork in Formation, Linking and WBM Road for Koderma Thermal Power Station of DVC at Koderma, Jharkhand at Larabad Leg
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - COAL MINES; Painting of Railway foot over bridge at Rajmahal CHP near Silo; Service Provider
Manpower Outsourcing Services - Fixed Remuneration - Attendant; Multi-tasking Staff; High School
Monthly Ambulance Service (All Inclusive) - Type B Patient Transport Vehicle; Single Stretcher Regul
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) (3 (3 ))
PVC Insulated (Heavy Duty) Electric Cables (V2) as per IS 1554 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6437348 Dated : 11-07-2025 Bid Document 1/6 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Glyphosate 41% SI (Q3) MSE Exemption for Years of Experience and Turnover
Multifunction Machine MFM (V2) (Q2), Line Interactive UPS with AVR (V2) (Q2), All in One PC (V2) (Q2)
Hernia Mesh (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/7011464 Dated : 18-12-2025 Bid Document 1/7 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Computer Printer (V2) (Q2)
ISO Propyl Alcohol as per IS 2631 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6662528 Dated : 03-10-2025 Bid Document 1/5 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Insulation Tester (Q3)
Digital Earth Resistance Meter (Q3)
Digital Earth Resistance Meter (Q3)
Toner Cartridges/Ink Cartridges/Consumables for Printers (Q2)
Paraffin Gauze Dressings (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Bid Number : GEM/2025/B/6598565 Dated : 22-08-2025 Bid Document 1/7 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Patient Bed (Fowler and Semi Fowler) (Q3) MSE Exemption for Years of Experience and Turnover
Insulation Tester (Q3)
High End Laptop - Notebook (Q2)
Digital Multimeter (Q3)
Evaporative Air Coolers (Desert Coolers) Conforming To IS 3315 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, OEM Annual Turnover, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes -- Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6424189 Dated : 07-07-2025 Bid Document 1/6, -- Number of days for which Bid would be auto -- extended 7 Past Performance 10 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6410007 Dated : 06-07-2025 Bid Document 1/8 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Reverse Osmosis based Point of Use Water Treatment System for Drinking Purposes (V3) as per IS 16240 (Q2)
Insulation Tester (Q3)
Industrial Safety Glove/Gauntlet (V2) (Q3)
Hernia Mesh (V2) (Q2) MSE Exemption for Years of Experience and Turnover
Transmission oils (Q3) MSE Exemption for Years of Experience and Turnover
Elastic Surgical Adhesive Tapes (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Bid Number : GEM/2025/B/6593017 Dated : 21-08-2025 Bid Document 1/6 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6263509 Dated : 06-07-2025 Bid Document 1/8 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
High Visibility Warning Clothes (V3) (Q2)
Industrial Safety Helmet (V2) as per IS 2925 (Q3)
Digital Medical Thermometer (Q2) MSE Exemption for Years of Experience and Turnover
PVC Insulated (Heavy Duty) Electric Cables (V2) as per IS 1554 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6443190 Dated : 11-07-2025 Bid Document 1/6 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
CALIPERS (Q4) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6723523 Dated : 08-10-2025 Bid Document 1/7, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Toner Cartridges/Ink Cartridges/Consumables for Printers (Q2)
Alcohol Swab (Q2) MSE Exemption for Years of Experience and Turnover
Polypropylene Ropes as per IS 5175 (Q3) MSE Exemption for Years of Experience and Turnover
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6313156 Dated : 06-07-2025 Bid Document 1/7 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Split or Cotter Pin (Q3)
Manpower Outsourcing Services - Fixed Remuneration - HIGH SCHOOL; Attendant; High School
Monthly Basis Cab & Taxi Hiring Services - SUV; 3000 km x 720 hours; Local 24*7
Monthly Basis Cab & Taxi Hiring Services - SUV; 3420 km x 720 hours; Local 24*7
Custom Bid for Services - Monthly basis Cab and Taxi hiring service, SUV Local 24 x 7 hours on the basis of 4500 KM as fixed per month per vehicle under SS KQR for transshipment of crew from KQR HRE KQR KPSH KQR PADH and KQR GJD for 03 years, Custom Bid for Services - Variable 780 KM per month per vehicle under SS KQR for transshipment of crew from crew from KQR HRE KQR KPSH KQR PADH and KQR GJD for 03 years Similar Category Monthly Basis Cab & Taxi Hiring Services Monthly Basis Cab & Taxi Hiring Services
Monthly Basis Cab & Taxi Hiring Services - SUV; 2500 km x 720 hours; Local 24*7
Custom Bid for Services - Periodical Inspection Servicing of DCP type fire extinguisher Frequency- Quarterly Total Qty in 04 years, 12528 Nos, Custom Bid for Services - Hydraulic Pressure Testing of DCP type fire extinguisher (06 Kgs) as per IS:2190:2010, ( Two times in contract period ( One time in 1st year AMC and second time in 4th year AMC), Qty- 1566 Nos, Custom Bid for Services - Painting of DCP type fire extinguisher 06 Kgs Once in contract period, Total Qty in 04 years 783 Nos, Custom Bid for Services - Refilling of DCP type fire extinguisher 06 Kgs with cartridge and Dry Chemical powder Frequency Once in 03 years Total Qty in 04 years 783 Nos, Custom Bid for Services - Optional Spares Discharge hose on need basis 313 Nos, Custom Bid for Services - Optional Spares Union Cap (on need basis 313 Nos, Custom Bid for Services - Optional Spares Rubber on need basis 392 Nos, Custom Bid for Services - Optional Spares Discharge Tube on need basis 313 Nos, Custom Bid for Services - Optional Spares Inner Container on need basis 313 Nos, Custom Bid for Services - Optional Spares Safety Pin Clip on need basis 392 Nos, Custom Bid for Services - Optional Spares O ring on need basis 392 Nos Similar Category AMC/CMC of Fire Extinguishers AMC/CMC of Fire Extinguishers AMC/CMC of Fire Extinguishers AMC/CMC of Fire Extinguishers AMC/CMC of Fire Extinguishers AMC/CMC of Fire Extinguishers AMC/CMC of Fire Extinguishers AMC/CMC of Fire Extinguishers AMC/CMC of Fire Extinguishers AMC/CMC of Fire Extinguishers AMC/CMC of Fire Extinguishers Bid Number : GEM/2025/B/6338817 Dated : 13-06-2025 Bid Document 1/14