Loading…
Loading…
2,981 results • Best match
Construction of 1.20 KM CC Road with Drain, RCC Retaining Wall, HPC and Boundary Wall at WardNo.29 from Devra railway gate to Adiwasi Chatrawas, Waidhan
Construction of Railway Over Bridge at L.C.No.199, in Rly.K.M.No.650/12-16 between Itarsi Khandwa Section on Harda - Khandwa Rd. SH -15 in Harda District
Construction of cc road from Railway crossing to house of santosh sahu and house of thumman sahu to house of mohan dehariya at ward no. 18
Construction of R.O.B. at Railway X-ing no. 247 at K.M 815/36 816/2 Near Ghodadongri in Itarsi Nagpur Section on Baretha Ghodadongri Road. Distt.Betul
Supply and Erection of 20mtr High Mast System for railway yard and supply of 12Mtr High Mast System for CHP ,PH 1 and 2 ,SSTPP, Dongalia
Hiring of Pay loaders fitted with weight sensors for mechanical transfer of coal in to Railway Wagons at Burhar Siding Sohagpur Area as detailed in NIT
Construction of Railway Over Bridge in Liue of LC no. 16 in K.M 1029/9-10 of Bina-Katni Section on Naryawali-Luhari Road District Sagar.
RATE CONTRACT OF DIETARY ARTICLES (GROCERY) FOR KITCHEN OF DIVISIONAL RAILWAY HOSPITAL, RATLAM FOR A PERIOD OF TWO YEARS FROM THE DATE OF COMMENCEMENT OF CONTRACT.
Preparation & submission of integrated cable route plan of main & tail cables of station, LC & IBS designed in Auto CAD over Jabalpur Division of West Central Railway
Hiring of 20 Nos ( 480 Man Months )attendants in lieu of TADK for officers working in Western Railway Ratlam Division for a period of 24 Months
Zone No 15 FTD (Excluding) to Indore station , km 475.130 to 495.700 & and Rau- Tihi section. K.M. 00.00 to 08.77 K.M service building and Railway colonies.
Construction of railway over Bridge in Lieu of L.C. no. 32 on Makronia-Guda Road in Km 1059/2-3 On Bina-Katni Section District Sagar.
(CM Infra) Construction of RCC Nala at yadav colony gali no. 9 se railway crossing phe colony zone 01 ward 05. File no 529/25x3/6
Construction of Railway Over Bridge in Lieu of L.C. No.273 in K.M. 896/28-30 Between Sorai-Sumer Station in BPL-Bina Section. District- Vidisha
Construction of Dwarf wall at the edge of siding platform for arresting spillage of coal on the rail tracks at Govinda Railway siding of JK Area.
Construction Work of B.T Road at Gwalior Glory School Road Via Park to Railway Boundary wall. Zone 13 Ward no 58. File No.27/26X3/5.
CLASS- 3 with encryption DIGITAL SIGNATURE CERTIFICATE ALONG WITH USB TOKEN WITH ORGANIZATION NAME AS INDIAN RAILWAY FOR DIGITAL SIGNING OF DOCUMENTS WITH VALIDITY 02 YEARS.
Tab/Cap Silodosin 8 mg + Dutasteride 0.5 mg. Product should be available in the approved product list of Railway Board. Mak: OVERSEAS BRAND NAME SILOCAP D
ANAEROBIC MICROBIAL INOCULUMS (SEEDING BACTERIA) FOR IR-DRDO BIO TOILET TANKS USED IN RAILWAY COACHES. CONFORMING TO RDSO SPEC.NO. RDSO/2013/CG-12(ISSUE SEPT-2014).
CLASS- 3 with encryption DIGITAL SIGNATURE CERTIFICATE ALONG WITH USB TOKEN WITH ORGANIZATION NAME AS INDIAN RAILWAY FOR DIGITAL SIGNING OF DOCUMENTS WITH VALIDITY 02 YEARS.
TUNGSTEN TIPPED COPPER CONTACT FORBG AC EMC TAP CHANGER SWITCH AS PER SOUTHERN RAILWAY CAS SHED DRG NOM/TRS BG/EMU/305 ALT-2 (AWADI DRAWING)
Applications are invited for appointment of Station Ticket Booking Agent (STBA) at the Following NSG-6 Class category of stations of Ratlam Division of Western Railway.
Comprehensive Annual Maintenance Contract of RAVEL make fire alarm and detection system installed at various locations on Jabalpur division of West Central Railway for Two Years.
Comprehensive Annual Maintenance Contract of Vighnaharta make fire alarm and detection system installed at various locations of Jabalpur division of West Central Railway for Two Years.
Zone No 15 FTD (Excluding) to Indore station , km 475.130 to 495.700 & and Rau- Tihi section. K.M. 00.00 to 08.77 K.M service building and Railway colonies.
Replacement of outlived Electric Lifting Barrier on codal life basis of ITARSI- MANIKPUR section (Total 09 nos.) of Jabalpur division on West Central Railway (Signalling Work)
Comprehensive Annual Maintenance Contract of Notofire make Fire alarm and detection system installed at various locations on Jabalpur division of West Central Railway for Two Years
Goods Transportation service - Monthly Based Service - Outside state; Railway P way material machine and other Engg material and men to site of work; Open Body Taurus()
Goods Transportation service - Monthly Based Service - Outside state; Transportation of Railway MaterialMacines and othr material and men as per scope of work attached; Open Body Taurus()
Custom Bid for Services - 200138989 Deployment of EX Railway Staff for Gadarwara MGR Operation for two years Similar Category Operation and Maintenance Power House/Power Plant
Goods Transportation service - Monthly Based Service - Outside state; Railway departments men & material; Open Body Taurus minimum loading capacity 9 MT and above & 16 feet or above
Custom Bid for Services - Hiring of Two Vehicle for Transportation of Rly running staff along with their line boxes equipment in contractors Non AC vehicle Mahindra BOLERO or similar in same price segment from JBP lobby to ADTL DOE GSPR MML KEQ BRG.. Similar Category Monthly Basis Cab & Taxi Hiring Services
CONSTRUCTION OF PCC DRAIN AT RAM NAGAR COLONY NEAR DURGA MANDIR NEAR RAILWAY UNDER BRIDGE 02 KAICHI CHHOLA WARD 18 ZONE 04
Custom Bid for Services - Mechanized Upkeeping and Cleaning Arrangement at Electric Loco Shed Trip shed West Central Railway New Yard Itarsi Similar Category Cleaning, Sanitation and Disinfection Service - Outcome Based
ROAD RENOVATION WORK IN WARD 19 FROM RAILWAY CULVERT TO MUNNA HOUSE IN ADAMGARH AND PAVING BLOCK WORK ON BOTH SIDES OF ROAD MUNICIPAL COUNCIL NARMADAPURAM MP
Civil Works required for shifting and installation of old weigh bridge laying in front of existing running W.B. to inside of Railway siding under Burhar-Sharda subarea.
Construction Of ROB at Railway Level XING NO 255 in KM 844/8-10 at Bhopal Bina Section On Bhopal Vidisha Road at Chopda Kala District Bhopal
Supply of complete material along with installation, commissioning testing of Pit less Electronic In Motion Weigh Bridge system to be installed at MPBG Railway siding, near Ghoradongri.
Construction of Railway Over Bridge at Level Crosing no. 251 at K.M 847/6-7 Narsinghpur Yard in Itarsi - Jabalpur Major Section Division Jabalpur in District Narsinghpur
SPECIAL STRENGTHENINGH OF MAKROHAR TO C.G. BORDER L- 1.20KM RAILWAY CROSSING TO GOBHA APP. ROAD L- 6.00KM TOTAL LENGTH 7.20KM UNDER SUB DN WAIDHAN DISTT. SINGRAULI (M.P)
Estimate for Providing 1 No. 110 KW NDL Connection 1x200 KVA Xmer to Sr Electrical Engineer (Railway) Nishatpura Under Bhanpur Zone of City Dn East MPMKVVCL Bhopal
construction work of Renewal CC road In Ward No.-07 and 13, from near Basant Odukale house, crossing MES railway line till Hafeez Khan, pre-built damaged.
Drillilng of 150 mm dia, 150 mtr deep Tube well with installation of three phase motorpump set in NOHARIKALA NEAR RAILWAY BRIDGE at Block Shivpuri distt Shivpuri
Construction of Railway over Bridge at LC 65-E K.M.821/19-21on Bhawani Mandi - Bhesoda Mandi Road Including Electric Pole Shifting and Hight Rasing District Mandsaur.
Construction of Railway Over Bridge in Liue of Level Crossing no.70 in KM 1141/16-18 of Bina-Katni Track on Damoh-Bandakpur Road Distt. Damoh
Auction for Demolishing /Dismantling of Old District court, Old Railway Court,Canteen,Lock up,Garage,Old nagar Nigam Court,and IT wing Building at MPHC Jbp Premises
Providing dust breaking barrier with profile sheet at top (20 feet height) for Govinda Railway Siding under Kotma Govinda Sub Area of JK Area (length 400 mtr)
CONSTRUCTION OF CC ROAD AND DRAIN WORK AT WARD NO 01 BANKE KIPULIYA SE RAILWAY WALL TIRAHA TAK AND BAGAL KI GALI MUNICIPAL COUNCIL JORA DIST MORENA
Construction of Interlocking road and RCC culvert at ward no.41 from shiek Bablu Son of Sheik Mansoor house to Gas factory road Railway gate no.7
Shifting of 33KV/11KV/LT Line composite and Street Light arrangement from Railway Tiraha (ROB) to Hotel Aaditya (FOB) Saman Tiraha at City Rewa Distt. Rewa (M.P.)