Loading…
Loading…
1,010 results • Best match
Erection of HT, LT line and substations
Creation of Substation along with LT Line
FIXING OF RATE CONTRACT FOR EXECUTION OF LT LINE WORKS ON TURNKEY BASIS WITHIN THE JURISDICTION OF ELECTRIC DIVISION VIJAYPUR, JPDCL JAMMU
Segregation of 33 KV Kupwara Old Line from Arampora Grid upto Khumeriyal by way of construction of New 33 KV Line and Subsequent Stablization/Augmentation of existing line from 100 Sqmm to 200 Sqmm from Khumeriyal to Sogam.
Creation of HT and LT line along with Substation.
Creation of 63 KVA S/Stn. Alongwith HT/LT Line at Qasba under DC-Work 2023-24
Creation of 63 KVA S/Stn. Alongwith HT/LT Line at Thanpeer under DC-Work 2023-24
Creation of 63 KVA S/Stn. Alongwith HT/LT Line at Islamabad under DC-Work 2023-24
Creation of 63 KVA S/Stn. Alongwith HT/LT Line at Barur under DC-Work 2023-24
Creation of 63 KVA S/Stn. Alongwith HT/LT Line at Banpat under DC-Work 2023-24
Creation of 25 KVA S/Stn. alongwith HT/LT line at Vetnary Asstt. Surgeon office Seikloo Mandi
Creation of 63 KVA S/Stn. Alongwith HT/LT Line at Pharswal under DC-Work 2023-24
Creation of 63 KVA S/Stn. Alongwith HT/LT Line at Uripura under DC-Work 2023-24
Creation of 63 KVA S/Stn. Alongwith HT/LT Line at Guntrian under DC-Work 2023-24
Creation of 63 KVA S/Stn. Alongwith HT/LT Line at Shahpur under DC-Work 2023-24
Creation of 63 KVA S/Stn. Alongwith HT/LT Line at Doba under DC-Work 2023-24
Installation and Creation of 63 KVA Substation including HT/LT line for Water Supply Scheme Haripora Bonizal.
Creation of 100 KVA S/Stn. alongwith HT/LT Line at Noona Bandi School under WSS Scheme
Creation of 1x630 KVA Sub Stations along with HT LT LINE for JJM WSS Shiva Sharerna Lif
Extension of LT line to Hi-Tech Poly Green House at FVSc and AH Shuhama, SKUAST-Kashmir
Creation of 63 KVA S/Stn. Alongwith HT/LT Line at Sankh under DC-Work 2023-24
Creation of 63 KVA S/Stn. Alongwith HT/LT Line at Bandichechian under DC-Work 2023-24
SITC of 100 KVA Substation with LT line and Allied works at MCRS Sagam SKUAST-Kashmir.(NABARD)
Creation of 3X250 and 5X100 KVA S/Stn. alongwith HT/LT Line at Kalai under WSS PHE
Erection of Tapping point and LT line
Shifting / Height Raising of 33 KV Mandal line
Erection of HT and LT Line
Creation of 250 KVA Sub Stn along with HT line
Make shift arrangement for testing of WSS Migrant Colony Zewan on 6.6 KV HT line Of Sub Division Peripheral.
Creation of 250Kva Substation, HT line, LT Network, Solar Street lights and Highmast lights at Transit Accommodation Chowgam Qazigund
Creation of 63 KVA SS alongwith HT/LT Line, Creation of 25 KVA SS alongwith HT/LT line
Laying of LT line ST and PCC poles of 2 PHASE 3 WIRE, Erection of LT Extension at Chalni, Temple Aithem, Challani, Tute-Di-khui, Pargalta, Peacock Colony Bajalata, Laying of LT Line of village Dwara, Ragoora and Lower Ragoora Jammu
1. EXTENSION OF LT LINE AT BREVI/SOLKI W NO. 7 2. 1 x 25 kVA S/STN FOR SIARI DALLI B 3. EXTENSION OF LT LINE AT POTHA PANHAR 4. IMPROVEMENT AT W NO 1,2, AND 7 VILLAGE PANJAH
Creation of substation along with HT and LT Line
SHIFTING / REMOVAL OF OLD/DEFUNCT 33 KV LINE
Erection of 11KV Line on 9.0Mtr long PCC Poles for dedicated Industrial Feeder at Hira Nagar falling under the jurisdiction of O and M Division, Kathua(JPDCL) on Turnkey Basis
Erection of LT Line Network for Shifting of Electrical Utilities coming under widening of Road at Phinter to Billawar falling under the jurisdiction of O and M Division, Kathua(JPDCL) on Turnkey Basis
Creation of 250 KVA and 63 KVA Sub station alongwith erection of 11 KV Line on 9 mtr. ST poles, 30mm sq. ACSR weasel Conductor at WSS Samole under JJM
Shifting of 11 KV HT Line along with Transformer in AOR of BOP Chak Dulma with in the jurisdiction of Electric Division Vijaypur JPDCL, Jammu
Creation of 1x100, 4x63 KVA, 1x250 KVA Sub station alongwith erection of 11 KV Line on 9 mtr. long ST poles, 30mm Sq ACSR weasel conductor at WSS Barta under JJM
Creation of substation along with HT and LT line
Rate contract for Conversion of LT line from Single Phase to two Phase two phase to three phase and Single Phase to three Phase by way of Supply Erection Testing and Commissioning same on existing Poles with Weasel Rabbit Conductor on Turn Key
Construction of 2 Km of 33 kV Line on 11 Meter ST Poles, 100 mmsq ACSR Conductor For Creation of 10 MVA, 33/11 kVA Receiving Station for e-Charging Station near Bus Stop Panthachowk under SMART CITY PROJECT
Completion of 33/11 KV, 1X10 MVA Substation at Tailbal along with 33kV line for system strengthening and upgradation of power infrastructure under Capex Budget.
of 33kV line on 11 Metre ST Poles with standard Span of 58 metre for upcoming 3.15 MVA Receiving Station at Nutnoosa Kupwara under Capex
for Erection and Re-orientation of 11 kV Line for evacuation of Power for Construction of 3.15 MVA, 33/11kv Receiving Station at Damnote Pancheri area of Distt Udhampur (PDSS2022100676) under UT capex SASCI
Erection of HT and LT line with creation of substations
Segregation of 11 KV Killora feeder Emanating from Receiving station Pinjora by way of construction of new 11 KV Line from Receiving /Stn Pinjora upto Village Gret Mohalla Killora UNDER WINTER PREPAREDNESS ON TURNKEY BASIS
erection of HT, LT Line with substations
Erection of HT and LT line with creation of 25KVA Substation