Loading…
Loading…
832 results • Best match
Shifting of HT and LT line due to Improvement of road from Narendra to Kuchinda via Gurundia kusumi from 0/980 km to 19/950 km except 14/840 km to 15/720 km Ch at10/200km to 14/000 km
Construction of 3ph 3w 11kv, 3p5w LT line and Sub-Station due to Widening and Strengthening of Angul Mahidharpur Road (1/500km to 3/0 km) (from Jamubandha chhak to Khamar Byepass) under AnED Angul for the year 2024-25.
Construction of 3ph 3w 11kv, 3p4w LT line and Sub station due to Widening and Strengthening of Angul Chhendipada Road from Bagedia to Nuapada via Tangiri (0/0 KM to 8/477 Km) of Angul District For the Year 2024-25.
EI work for shifting of 6KVA,11/0.23KV S/S 11Kvline,LT line in different location due to Road widening work from N.H. 16 Khordha OCC Chhaka to Bajapur Via Durgapur under PMGSY-III (Package No.OR-18-224) (Batch-II) Bhubaneswar
Shifting and Erection of 3Ph 3W 11KV, 3p 5w LT line and Sub-station due to widening and strengthening of Sanahulla Paikasahi Kantapada (0/000 Km to 17/700 Km) in the district of Angul for the year 2024-25
Shifting of 11KV/DTR/LT line for widening and strengthening of Ichhapur to Basudevpur road from 0/000km to 23/700km (Except 10/000km to 10/600km) from Kalanpur chhak to Padampur PSS via-Padampur Market and via-Krupasindhu School
Shifting and construction of 11KV 3ph3w line LT line and sub-station for widening and strengthening for impvt from Krushnadaspur Ratnagiri road site near Balikuda, TPNODLCamp, HanumanChhak and Tiranpadia from 10.00 km to 17.324 km for the year 23-24
Shifting and construction of 11KV OH Line, LT line ana DP with AB switch at different location due to improvement by widening and strengthening of Kankadahad to Mahabirod road from 0/00 Km to 10/00 km
Shifting and Construction of 11kV Line, 11/0.4kV S/Ss and LT ABC From(Maruti Suzuki Showroom) 8/0 to (Injanpur)12/000KM due to widening and strengthening of Defunct NH-5 (Balugaon By-pass road From 8/0 to 16/000KM) in the district of Khordha under St
Shifting of HT and LT line due to Improvement of road from Narendra to Kuchinda via Gurundia kusumi from 0/980 km to 19/950 km except 14/840 km to 15/720 km Ch at 0/980 km to 5/000 km
Shifting of HT and LT line due to Improvement of road from Narendra to Kuchinda via Gurundia kusumi from 0/980 km to 19/950 km except 14/840 km to 15/720 km Ch at 5/900 km to 9/400 km
Construction of 11KV and LT line due to road Improvement for widening and strengthening of Simore-Banki-Malipadar road ODR work from 0/0 Km to 09/90 Km in the District of Khordha under State Plan for the year 2023-24
Shifting and Construction of Electrical Utilities lines 33kv,11Kv and LT line from Taraboi Market Chhaka to Gada Khordha in order to facilitate the road Widening an Strengthening work of pattnaika-Delanga-Khordha Road from 13/00 to 34/00 km in th
Shifting and Erection of 3Ph 3W 11KV, 3p4w LT line and Sub-station due to widening and strengthening of Sanahulla to Paiksahi via Mindol road from 0/0 km to 11/519km in the district of Angul for the year 2024-25.
Construction of 3ph 3w 11kv,3p4w LT line and Sub Station due to Widening and Strengthening of Angul Chhendipada Road from Koshala to Chhendipada Road Via Brahamnabil Changudia ( 12/500 KM to 22/00 km)of Angul District For the Year 2024-25.
Repair ,Recondition 11KV O/H line from IWSS intake wellcut point to Ranipark Pump House SubStation,3.3KV O/H line from Lingaraj 33KV SubStation to Bimalagarh Track line ,Elec. Maintenance of LT line of Office sand Stowing Vat CPI at Deulbera Colliery
A. Shifting of 500KVA 11 0.4KV Plinth mounted SS B. Const. of DP with AB Switch C. Const. of 11KV UG line with 4way RMU D. Const. of LT line E. Const. of 11KV UG line F. Dismantling Work IMAGE Campus Siripur BBSR
Construction of 33KV, 11KV, LT lines with installation of Sub-station towards shifting of existing 33KV, 11KV and LT line and Sub-station for Improvment and widening of road from Jatni-Govindapur road from 0/0 to 5/600 Km in Dist- Khurda
Construction of 33kv,11kv LT Line and Sub Station due to road improvement for widening and strengthening of Tikatala-kodabereni road(ODR) work from 0/0km to 09/400 km in the District of Khordha under State plan for the Year 2023-24
Construction of LT Line with AB cable on PSC poles
Construction of LT Line with AB cable on PSC poles
Electrical work
Electrical Shifiting work
Shifting and Relocation of existing 11KV and LT line under package no-OR-18/210/PMGSY-III (batch-II) due to construction of roads and CD works under PMGSY-III for the work MRL-26PWD road Hatasabasta to NH-224 Chuda via Khalikote Asanapalli, Bologarh
Shifting and Relocation of existing 11KV and LT line under package No-OR-18-2155/PMGSY-III (Batch-II) due to construction of Roads and CD works under PMGSY-III for the work MRL-33 NH-57 to Block Boundary via Kalanga, Hatasahi Gobardhanpur
Construction of 250KVA,11/0.4KV S/S with11KV and LT line towards shifting of existing line and S/S for widening and strengthening of Khordha - Jatni - Pipili Road from 9/00 to 13/220 Km in the District of Khordha for the year 2023-24.
SITC OF 11kV Industrial Feeder from 33/11kV Ankuli PSS, Upgradation of 11/0.4kV 63kVA Transformer to 11/0.4kV, 500 kVA Plinth mounted Substation and construction of new 3 ph-5W LT Line on existing poles for Power supply to the IE-Ankuli Berhampur
Shifting and construction of 11 KV lines, LT line and Sub-station for Shifting of IIT/LT Electric lines for the work improvement of Salt Road from Balasore to Gud from 23.400km to 41.391km in the District of Balasore under State plan. under Anatapur
Shifting and new Construction of 11Kv 3Ph3W Line, Sub-Station and LT line for Strengthening and widening of Maninaga Temple road to New Jagannath Sadak road Minor Irrigation and BSNL office from 0/0 to 1/416Km and Tala Maninaga to Upara Maninaga road
Construction of 11 KV and LT line with Installation of 100KVA 11/0.4KV S/S towards power supply to the newly constructed 12 nos of E Type quarters and common area including Lift and Water supply pump in the office premises of Superintending Engineer,
Electrical work.
Electrical Shifiting work
Electrical Shifiting work
Electrical Shifting Work
Installation of 500 KVA, 11/0.4 KV Plinth mounted Sub-station and Construction of 0.550 ckt KMT 11 KV 3 phase 3 wire line along with 2ckm 3 phase 5 wire LT line to provide power supply to the slum area Rehabilitation complex at Nimpur, Jagatpur, Cutt
Shifting of 11 KV 3 Phase 3W Line, 63 KVA 11/0.4KV Substation ( Without Transformer 1 No) and 3 Phase 4W LT Line present near the river embankment of Mahanadi Left near village Gamei (SLD-1 and SLD-2) of Badamba Block in the district of Cuttackh
Construction of 25KVA S/S, with 11KV and LT line towards shifting of existing line and S/S from the allignment of the road for construction of PWD Road from R.D road to Halia Sahi road under MMSY Scheme at Banki under R.W. Electrical Section, Cuttack
Construction and Shifting of 33kv,11kv LT Line and 16KVA and 100 KVA Sub Station due to road improvement for widening and strengthening of Simor-banki road(ODR) work from 0/0km to 09/100 km in the District of Khordha for the Year 2023-24
Utility shifting for road work
Utility shifting for road work
Electrical Shifting Work
S/R to Dibakara Marg (Ravi talkies to Tankapani road), Bhubaneswar such as Construction of RCC drain from Ch. 1/554 to 1/734 Km (LHS) in addition to Shifting of 3Q2W 33KV n LT line along the road under Uttara Feeder and Badagarh section for 2020-21
Pole Shifting of LT line for the work of ROB at 294/1-3 of line in lieu of lC No-119 at 293.83km (293/35/37) up line in between Station Bhadrak and Baudpur on Howarh -Vishakhapatnam main line in the District of Bhadrak.(Left and right side).
Construction of 3 ph 6W LT line and heightening of 11KV for clearing of road crossing conductor due to improvement of Dhenkanal town road from 2/800 km to 6/00km and 7/200km to 7/700km in the district of Dhaenkanal under the state plan (2024-25)