Loading…
Loading…
21,076 results • Best match
Construction of Remaining 33 KV Line for 33/11 KV S/S Bairpur (Tediten) Dist- Sonebhadra taping from 33/11 KV S/S Dibulganj, Sonebhadra (Semi Turnkey)
33KV Line work for Raw Water Pump House
Grouting machine for railway electrification work
Estimate for P.S.to 02 No 6 HP Pump Con. at village Bhighawa Under Chicholi D/c 25 KVA DTR 01 No, 11 KV Line 1.01 Km, 11 KV DP 01 No, LT Line 0.15 Km
Estimate for Public experiment of 2x25 KVA DTR, 11 KV Line and Lt Line At Village Barkhed (Chandrakishore Nathu Ke Khet Se Hiralal Sonare Ke Khet Tak ) Under Athnair Dc. (O and M) Betul Circle
Estimate for P.S.to 01 No. 03 HP Pump Connection at village Sonoli Bundala Under Khedlibazar Dc. 25 KVA DTR 01 No, 11 KV Line 0.56 Km, 11 KV DP 01 No, LT Line 0.05 Km
Erection of 6.52 Km 11 KV line on lattice tower and 4 km LT line against system improvement for 24 hours supply to Mohabbat nagar village under Sub-Division Kalandri Circle Sirohi on CLRC basis.
Estimate for P.S.to 03 No 11 HP Pump Con. at village Gudi Under Betul Bazar Dc. 25 KVA DTR 02 No, 11 KV Line 1.96 Km, 11 KV DP 01 No, LT Line 0.70 Km
Estimate for Public experiment of installation of 1x100 KVA DTR, 11 KV Line and LT Line At Village Satnair Pachbad Viran (Bakud) Under Satnair Dc in O and M Dn Betul (S) in Betul Circle
Erection of 11 KV line on 9 mtr ST pole using 100mm ACSR conductor and erection of LT line on 8 mtr ST pole including sub station renovation /up gradation and dismantling of old structure .
Estimate for P.S.to 02 No 6 HP Pump Con. at village Aktikeda Dudiya Under Chicholi Dc 25 KVA DTR 01 No, 11 KV Line 1.16 Km, 11 KV DP 01 No, LT Line 0.45 Km
Estimate for P.S.to 03 No 9 HP Pump Con. at village Alampur Under Chicholi D/c 25 KVA DTR 02 No, 11 KV Line 1.25 Km, 11 KV DP 01 No, LT Line 0.45 Km
Shifting and heightening of 11 KV Line and LT Line due to construction of approach road for farmers at vill.- Katnera Teh. Kukshi Dist. Dhar including material, labour, charges, transportation and testing etc. complete work.
Creation of 100 KVA Sub station alongwith erection of 11 KV Line on 9mtr. ST poles, 30mm sq. ACSR Weasel conductor LT line on 8 mtr. ST pole at WSS Panchari
Extension of power supply by providing 11KV HT line and LT line to Industrial Park in Sy No.472/2, Chitkul(V), Patancheru Mandal, Sangareddy Dist
providing 11KV HT line to 100 KVA, 11/0.4 KV DTR and LT line at Village Judikalan Near Madi Mandir Under Electrical Sub-Division, HPSEBL, Baddi
Constructing 1.83 km 11 KV line from Kalampattuchira to Vaidyarupady and installing 100 KVA Tfr under electrical section kurichy
11 KV Line and Other Maintenance work under M AND R / O AND M Head
Construction of 11 KV line and installation of 500 KVA DTR
11 KV line extension work at Jungle Resort Udaigir distt Vidisha.
Construction of 11 KV Line under BP 2025-26 EDD-Phoolpur
11 KV line pole shifting work in ward no 7 ghuwara
Providing electric connection and 11 kv Line Shifting under Deposit plan.
Construction of 11 KV Line of Feeder Sapration under EDD Farrukhabad
Construction of 11 kv line under Deposit Scheme EDD-II MIRZAPUR
11 KV Line Shifting Work, Up Mandi yard Jeeran Distt. Neemuch
Construction of 11 kv line under Deposit Scheme EDD-I MIRZAPUR
Pole Shifting of 11 kv Line MES From Ward No. 20
Construction of 11 kv line under Deposit Scheme EDD-CHUNAR MIRZAPUR
Electrification work 05 No 11 KV line under EDD Bandih Ballia
11 KV LINE SHIFTING WORK AT MANDI YARD PIPARIYA DISTT. NARMADAPURAM
THE WORK 11 KV LINE CONSTRUCTION UNDER DEPOSTE SCHEME 2021-22
SHIFTING OF 11 KV LINE AT FCI STORE KHUMATHANG SALISKOTE KARGIL
33KV and 11 KV line Shifting at IA Bijepur, Distt. Indore
Providing electric connection and 11 kv Line Shifting under Deposit plan.
Construction of Additional 11 KV Line 33/11 KV Rampur Karkhana
Maintenance of overhead 11 KV line at Dugda Coal Washery Township.
SHIFTING OF 33/11 KV LINE AT TPS-05 KANADIYA INDORE
11 KV Line Strengthening Work Under BP 2026-27 EDD-Sathiyaon
RECONDUCTORING 11 KV LINE WITH ABC UNDER ELECTRICAL SECTION CENTRAL-KOZHIKODE
WORK OF 11 KV LINE MAINTANANCE IN System AUGMENTATION/STRENGHINNG WORK
11 KV line Shifting at CM Rise School Sundarsi Dist Shajapur
Estimate for 11 kv Line Morta DL feeder underground Railway Crossing
Estimate for 11 kv Line Morta IRR feeder underground Railway Crossing
Realignment of 11 KV Line by dismanteling of 7 no Poles
ERECTION OF 33 KV LINE 15.00 KM T OFF FROM 33/11 KV BISHU KHURD SUB-STATION ALONG WITH 33/11 KV SUBSTATION,1X3.15 MVA AT PROPOSED BUDHATALA WITH ERECTION OF 11 KV LINE 2.10 KM UNDER AEN O AND M JDVVNL BHIYAD UNDER CIRCLE BARMER ON LRB 2025
ERECTION OF 33 KV LINE 9.90 KM T OFF FROM 33 KV RAJMATHAI FEEDER FROM 132 KV RAJMATHAI GSS ALONG WITH 33/11 KV SUBSTATION,1X3.15 MVA AT PROPOSED MAHADEV NAGAR WITH ERECTION OF 11 KV LINE 4.40 KM UNDER AEN O AND M JDVVNL BHANIYANA UNDER CIRCLE JSM
Construction of 33/11 KV Sub Station for Gura Endla, Erection of 33 KV line 1.8 Km Single Circuit From Rampura To Gura Endla for Gura Endla GSS (C) Erection of 11 KV line 16 KM for Interconnection for Gura Endla GSS under AEN (Rural) Pali under P
ERECTION OF 33 KV LINE 0.50 KM SINGLE CIRCUIT WITH ACSR DOG CONDUCTOR FROM 33 11 KV Bhopa SS ALONG WITH 33 11 KV SUBSTATION 1X3.15 MVA AT UGWA WITH ERRECTION OF 11 KV LINE 8.0 KM UNDER AEN RURAL JDVVNL JAISALMER UNDER CIRCLE JSM ON LRC 2025.
PROVIDING LED 45 WATT STREET LIGHTS WITH INSULATED CONDUCTOR 30 SQMM ON 24 MTR. WIDE ROAD EXISTING 33 KV LINE ON PCC POLE 11 MTR. LONG AND EXISTING 11 KV LINE ALONG WITH GEONG NALA IN SECTOR-18 U/E KAITHAL. (INCLUDING THREE YEARS FREE MTC./ DEFECT LI